Payment Terms | L/C, T/T, D/A, D/P |
Supply Ability | 100000 tons per year |
Delivery Time | As per client's needs like 2-3 months |
Packaging Details | Seaworthy packing in container or bulk vessel |
Material | Q355b Steel |
Grade | Q355b |
Type | Heavy |
Size | Customized |
Surface treatment | Galvanized or painted |
Color | Customized Color |
Application | Construction |
Brand Name | FASEC |
Model Number | HZFS |
Certification | CE, ISO, SGS |
Place of Origin | China |
View Detail Information
Explore similar products
Prefab Warehouse Buildings American Steel Construction Design Crane Equipment
Metal Steel Structure Warehouse Construction Frame Turnkey Project
Railway Prefabricated Steel Truss Pedestrian Bridge Girder Corten Steel
Light Gauge Steel Frame Construction Recycled Apartment Low Rise Residential
Product Specification
Payment Terms | L/C, T/T, D/A, D/P | Supply Ability | 100000 tons per year |
Delivery Time | As per client's needs like 2-3 months | Packaging Details | Seaworthy packing in container or bulk vessel |
Material | Q355b Steel | Grade | Q355b |
Type | Heavy | Size | Customized |
Surface treatment | Galvanized or painted | Color | Customized Color |
Application | Construction | Brand Name | FASEC |
Model Number | HZFS | Certification | CE, ISO, SGS |
Place of Origin | China | ||
High Light | agricultural steels frame building AWS D1.1/1.5 FASEC ,galvanised steels frame AWS D1.1/1.5 FASEC ,FASEC Structural steels frame construction AWS D1.1/1.5 |
AWS code covers the welding requirements for any type of welded structure made from the commonly used carbon and low-alloy constructional steels.
Welded manufacturing of steel structures starts from the preparation for welding production, which includes structural technical review, process plan and process specification design, process evaluation, preparation of process documents (including quota preparation) and quality assurance documents , ordering raw materials and auxiliary materials, outsourcing and self-design and manufacture of assembly-welding equipment and equipment; then the welding structure manufacturing process starts from the material storage, including material re-inspection and storage, material preparation processing, assembly-welding, post-welding Heat treatment, quality inspection, finished product acceptance; interspersed with rework, painting and painting; the whole process of final qualified products warehousing.
Specification:
1 | Main steel structure | Steel structure |
2 | Steel surface treatment | painting or galvanized |
3 | Bracing | angle steel, belt bar, steel bar, etc. |
4 | Wall and roof panel | EPS, rock wool, fiber glass, PU sandwich panel or one layer corrugated steel plate |
5 | Bolts | anchor bolts, intensive bolts, commen bolts |
6 | Purlin | C section, Z section purlin in different size |
7 | Edge cover | Made of color steel plate |
8 | Gutter and down pipe | Gutter made of color steel plate or galvanization plate, PVC down pipe |
9 | Crane | Crane to lift 2 ton to 10 ton |
10 | Door | Sliding door, rolling door, lift door, etc. |
11 | Window | PVC window, aluminium window, steel window, etc. |
12 | Accessories | Nails, sealing glue, gasket, etc. |
Company Details
Business Type:
Manufacturer,Importer,Exporter,Trading Company,Seller
Year Established:
2002
Total Annual:
80000000-100000000
Employee Number:
1200~1500
Ecer Certification:
Verified Supplier
As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry. Nowadays, under FASECBuildings Group, there are... As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry. Nowadays, under FASECBuildings Group, there are...
Get in touch with us
Leave a Message, we will call you back quickly!