China factories

China factory - Qingdao Yidongxiang Steel Structure Co., Ltd.

Qingdao Yidongxiang Steel Structure Co., Ltd.

  • China,Qingdao ,Shandong
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Modern Design Fast Build Steel Structure Metal Frame Warehouse Workshop Low
China Modern Design Fast Build Steel Structure Metal Frame Warehouse Workshop Low

  1. China Modern Design Fast Build Steel Structure Metal Frame Warehouse Workshop Low
  2. China Modern Design Fast Build Steel Structure Metal Frame Warehouse Workshop Low
  3. China Modern Design Fast Build Steel Structure Metal Frame Warehouse Workshop Low
  4. China Modern Design Fast Build Steel Structure Metal Frame Warehouse Workshop Low
  5. China Modern Design Fast Build Steel Structure Metal Frame Warehouse Workshop Low
  6. China Modern Design Fast Build Steel Structure Metal Frame Warehouse Workshop Low

Modern Design Fast Build Steel Structure Metal Frame Warehouse Workshop Low

  1. MOQ: 1-10000 square meters
  2. Price: $35.00-$63.00
  3. Get Latest Price
Payment Terms T/T
Supply Ability 10000 tons/month
Delivery Time 20-30 works days
Packaging Details Exported standard packing
Product Insulation Thermal Insulation
Product Resistance Corrosion Resistant
Product Design Customizable
Aesthetics Modern
Fire Resistance High
Flexibility High
Construction Steel Frame
Structural Integrity Excellent
Brand Name YDX
Model Number YDX-A6
Certification CE ISO SGS
Place of Origin CHINA,QINGDAO

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 10000 tons/month
Delivery Time 20-30 works days Packaging Details Exported standard packing
Product Insulation Thermal Insulation Product Resistance Corrosion Resistant
Product Design Customizable Aesthetics Modern
Fire Resistance High Flexibility High
Construction Steel Frame Structural Integrity Excellent
Brand Name YDX Model Number YDX-A6
Certification CE ISO SGS Place of Origin CHINA,QINGDAO

Modern Design Fast Build Steel Structure Metal Frame Warehouse Workshop Low Price

Steel Structure Metal Workshop: A Comprehensive Analysis

1. Structural Characteristics & Advantages

Modern steel workshops utilize high-strength structural steel (SSS) grades like ASTM A572 (Yield Strength: 345-450 MPa) combined with advanced connection systems. Key benefits include:

  • Span Capacity: Clear spans up to 120m using space frame systems
  • Construction Speed: 40% faster than concrete structures
  • Seismic Performance: Energy dissipation capacity of 25-35% through ductile connections
  • Life Cycle Cost: 30-50% lower maintenance cost over 50-year lifespan

Table 1: Material Comparison

Property Structural Steel Reinforced Concrete Prefab Aluminum
Density (kg/m³) 7,850 2,400 2,700
Tensile Strength (MPa) 400-550 3-5 90-250
Thermal Conductivity 50 W/m·K 1.7 W/m·K 237 W/m·K
Recyclability 98% 30% 95%

2. Design & Engineering Considerations

Modern workshops follow EN 1993-1-1 standards with BIM integration. Critical factors include:

2.1 Load Calculations

  • Live loads: 0.75-1.5 kN/m² (industrial use)
  • Wind loads: 0.6-2.1 kN/m² (zone-specific)
  • Crane loads: Up to 1000t capacity in heavy industries

2.2 Connection Systems

  • Moment-resistant joints: Extended end-plate (EEP) connections
  • Slip-critical bolting: ASTM F3125 Grade A325 bolts
  • Semi-rigid connections: 15-25% rotational stiffness

3. Manufacturing Process Flow

Table 2: Production Stages

Stage Duration Key Equipment Tolerance Control
Cutting 15-30 hrs CNC Plasma (40,000A) ±0.5mm
Forming 20-40 hrs Hydraulic Press (5000t) ±1.2mm
Welding 50-80 hrs SAW (1000A) + Robotic MIG AWS D1.1 Class A
Surface Tx 10-15 hrs Grit Blasting (SA 2.5) 60-80μm profile

4. Advanced Technologies

  • Digital Twin Integration: Real-time stress monitoring with IoT sensors (5G enabled)
  • Automated Erection: AI-guided cranes achieving 0.5cm positioning accuracy
  • Sustainable Solutions: Photovoltaic steel roofs (BIPV) with 25% energy generation

5. Maintenance & Corrosion Protection

Three-coat systems per ISO 12944-C5:

  1. Zinc-rich primer (75μm)
  2. Epoxy intermediate (150μm)
  3. Polyurethane topcoat (50μm)

Corrosion rate: <1.5μm/year in marine environments

Steel structure warehouse composition
1. column and beam Material Q355 box or H-shaped steel (painted or galvanized)
2. Steel structure spraying galvanized or painted
3. wall&roof purlin C or Z section steel
4. wall&roof panel colorful corrugated steel sheet ,sandwich panels with EPS, rock wool, fiber glass, PU etc.
5.support steel angle, steel pipe, steel round
6.gutter steel sheet or galvanized steel sheet
7.downpipe pvc pipe
8.door sliding sandwich panel door or rolling metal door
9.window  PVC or aluminum alloy windows
10.accessory anchor bolt,high strengthen bolt, normal Bolt, skylight Belts, ventilators, etc
11.Use Our steel structure building have many applications and uses. Workshop, warehouse, office building, multi-story building, hangar,garage, livestock farm,poultry farm ,ect.
12.Advantage 1.Low cost, convenient.
2.Easy assembly and disassembly many times without damage.
3.Widely used in construction site, office building , etc.
4.Good environmental protection.

Common Issues in Steel Structure Metal Workshops: Analysis & Solutions

1. Corrosion and Degradation

Causes:

  • Exposure to moisture, chemicals, or salt-laden air in coastal/industrial areas
  • Insufficient protective coatings (e.g., <3 layers of paint)
  • Poor drainage systems leading to water pooling

Solutions:

  • Apply 3-coat systems per ISO 12944-C5 standards (zinc-rich primer + epoxy + polyurethane)
  • Use hot-dip galvanizing (85μm minimum thickness) for critical components
  • Install sloped roofs (≥5° pitch) and gutter systems to prevent water retention

2. Welding Defects and Joint Failures

Common Problems:

  • Porosity, cracks, or incomplete penetration in welds
  • Fatigue failure at high-stress connections (e.g., crane rails)
  • Thermal distortion from uneven heating during welding

Preventive Measures:

  • Follow AWS D1.1 standards for weld quality and NDT (X-ray/ultrasonic testing)
  • Use preheating (150–260°C) for thick sections to reduce residual stresses
  • Design moment-resisting connections with 20–30% overcapacity

3. Thermal Expansion Challenges

Issues:

  • Misalignment of roof/wall panels due to temperature fluctuations (ΔT ≥40°C)
  • Buckling of long-span beams (>30m)

Mitigation:

  • Install slotted bolt holes to allow 10–15mm movement
  • Use expansion joints every 60–90m in building length
  • Select materials with low thermal conductivity (e.g., insulated panels with λ ≤0.05 W/m·K)

4. Foundation Settlement

Risk Factors:

  • Inadequate soil compaction (bearing capacity <150 kN/m²)
  • Differential settlement from uneven loads (e.g., heavy machinery)

Remedies:

  • Conduct geotechnical surveys to determine soil type (e.g., clay, sand)
  • Design pile foundations (15–30m depth) for soft soils
  • Install grout-filled leveling plates under column bases

5. Vibration and Noise

Sources:

  • Machinery operation (e.g., CNC machines: 70–90 dB)
  • Resonance in lightweight roof decks

Control Methods:

  • Use vibration isolators (natural frequency ≤5 Hz) under equipment
  • Install acoustic panels (NRC ≥0.75) on ceilings/walls
  • Add mass to roof systems (e.g., 100mm concrete topping)

Comparative Table: Key Issues vs. Solutions

Issue Category Typical Defects Recommended Solutions Standards Referenced
Corrosion Rust, pitting, coating flaking 3-coat painting, galvanizing, drainage design ISO 12944, ASTM A123
Welding Cracks, porosity, distortion Preheating, NDT, overcapacity design AWS D1.1, EN 1090-2
Thermal Movement Panel gaps, beam deflection Slotted bolts, expansion joints ASCE 7, AISC 360
Foundation Cracks, uneven settling Pile foundations, soil stabilization IBC 2021, ACI 318
Noise/Vibration Worker discomfort, equipment wear Isolators, acoustic dampening OSHA 1910.95, ISO 3746

Proactive Maintenance Strategies

  1. Bi-annual inspections: Check coatings, bolts, and drainage (post-monsoon/winter).
  2. Real-time monitoring: Install IoT sensors to track strain (±0.01% accuracy) and humidity.
  3. Training programs: Certify welders to ISO 9606-1 and crane operators to OSHA 1926.1400.



Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    2002

  • Total Annual:

    1000-2000

  • Employee Number:

    56~100

  • Ecer Certification:

    Verified Supplier

Qingdao Yidongxiang Steel Structure Co., Ltd.founded in 2002,The company is an innovative enterprise focusing on the steel structure construction industry which has been engaged in steel structure construction industry for more than 20 years. We are one of the biggest manufacturers of stee... Qingdao Yidongxiang Steel Structure Co., Ltd.founded in 2002,The company is an innovative enterprise focusing on the steel structure construction industry which has been engaged in steel structure construction industry for more than 20 years. We are one of the biggest manufacturers of stee...

+ Read More

Get in touch with us

  • Reach Us
  • Qingdao Yidongxiang Steel Structure Co., Ltd.
  • 1202, Block A, Yulong Building, Laoshan District, Qingdao, Shandong, China
  • https://www.steelconstruction-building.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement