China factories

China factory - Shanghai Wind Automation Equipment Co.,Ltd

Shanghai Wind Automation Equipment Co.,Ltd

  • China,Shanghai ,Shanghai
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Fully Automatical Trickle Impregnation Machine Stator Heat Treatment Oven Coated
China Fully Automatical Trickle Impregnation Machine Stator Heat Treatment Oven Coated

  1. China Fully Automatical Trickle Impregnation Machine Stator Heat Treatment Oven Coated

Fully Automatical Trickle Impregnation Machine Stator Heat Treatment Oven Coated

  1. MOQ: 1pc
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms T/T
Delivery Time 60 working days
Packaging Details Bare package put in a 20'GP container
Condition New
Stator Frame size 63, 70, 80, 90
Dipping method Varnish Dipping tank stay or move
Tank movement Screw rod
Power source Electricity or Diesel
After sales Machine almost no need maintenance
Brand Name WIND AUTOMATION
Model Number WIND-ZCJ
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Delivery Time 60 working days
Packaging Details Bare package put in a 20'GP container Condition New
Stator Frame size 63, 70, 80, 90 Dipping method Varnish Dipping tank stay or move
Tank movement Screw rod Power source Electricity or Diesel
After sales Machine almost no need maintenance Brand Name WIND AUTOMATION
Model Number WIND-ZCJ Place of Origin China
High Light vacuum drying ovenvarnish impregnation machine

Fully Automatical Stator Heat Treatment Oven Coated With Resin Varnish WIND-ZCJ

 

 

 

Application:

 

Stator varnish machine composed of machine body, water cooler and varnish supply tank. It is mainly

 

applied to stator winding insulation treatment for fractional horsepower motor and industrial Y series motor

 

which is below frame size 132.

 

 

Dipping time depends on varnish density

 

Water pump dipping time usually is 2 minutes , and few minutes per cycle

 


1. Clean up the frame


Clean the paint on the frame and other impurities, and apply anti-sticking measures to the frame, such as

 

brush grease.

 

 

2. Load on Stator


There should be no dust or other debris on the stator. It must be removed before dipping. The stator is

 

placed neatly in the frame according to a certain distance. Generally, the stator should be placed

 

vertically in the frame. Some lead wires have problems such as hardening after drying and poor

 

conductivity. Therefore, the lead wires are generally bundled and then lifted up to avoid impregnation

 

before dipping.

 

 

3. Preheat


Generally, the preheating section temperature is set to 110-150° C. After the stator undergoes preheating

 

for 10-30 minutes, the surface temperature reaches about 90 degrees, and the steam in the core and the

 

coil can be removed. On the other hand, the insulating paint after preheating can be used. Quickly

 

penetrates into the coil and iron core. From the profile of the continuous immersing machine, it can be

 

seen that the preheating section is in fact connected to the upper curing section. Therefore, when a

 

water-soluble insulating paint is used, although the water-soluble insulating paint may not be pre-baked,

 

the heater of the preheating section cannot be turned off and the temperature setting should be

 

consistent with the curing section for easy penetration and efficient use of the curing time.

 


4. Cooling


After the stator passes out of the preheating section, the temperature is not uniform, and the local

 

temperature is too high. If the high-temperature workpiece directly enters the oil-soluble insulating paint,

 

the solvent will evaporate rapidly and cause a safety accident. In addition, when the insulation paint is in a

 

high temperature state for a long time, the probation period is drastically reduced, and an increase in

 

viscosity or even an overall gel is liable to occur and the pipe is clogged. Therefore, it is necessary to go

 

through a brief cooling to reduce the stator temperature to about 70 degrees.

 


5. Dipping


The sloping frame is completely immersed in the lacquer. The immersion lacquer time is generally

 

controlled between 30-80 s. It is adjusted according to the size and structure of the stator. The flow rate of

 

the dipping paint should be adjusted to ensure that the dipping tank is full of paint.

 

 

6. Solidification


After the lacquer work is completed, the workpiece enters the drying tunnel with the driving device to

 

complete the curing process. Depending on the size of the workpiece, it usually takes 1-3 hours.

 

 

 

Feature:

 

Name Unit 130-16 130-26 130-46
Station pcs 16 26 46
Dipping depth mm  130 130 130
Basket area mm 850×300 850×300 850×300
Loading- bearing kg 80 80 80
Pitch time min 1~90min adjustable
Heat rise time min <45
Tunnel Tem. ≤160℃
Dimension m 3.8×2.2×2.5 6×2.2×2.5 10×2.2×2.5
Power kw 40 60 80

 

 

Stator varnish machine example:
 
Working position: 26
 

Dipping depth Varnish impregnation: 130mm

 

Rack loading area: 850*300

 

Rack loading weight: 80Kg

 

Pitch time: 1-30min adjustable

 

Heating time: <45 min

 

Tunnel working temperature: ≤150℃

 

Power consumption: 60

 

Dimension: 6*2.2*2.5

 

Weight: 5.8 Ton

 

 

 

We produce stator varnish machine in electricity power,diesel power or gas, It has two types mechanism in
 
the varnish area:
 
1. Varnish tank goes up and down which is driven by the screw rod
 
2. Varnish tank fixed and the chain goes down and up
 
 
Situation 1 is suitable for stator with dipping time requirement, suppose the varnish dippin time is 2
 
minutes and pitch time is 5 minutes, stator don't need to stay inside the varnish tank for 5 minutes
 

In situation 2, the varnish tank don't move and don't need transmission, no drive needed,

 

Stator varnish machine which mainly applied to stator winding insulation treatmen composed of machine

 

body, water cooler chiller and varnish supply tank.

 

Electric insulating Impregnating resins and varnishes, potting compounds, conformal coatings, varnish and paint for industries.

There are different insulation stage related to electric motor insulation.

1. Electrostatic powder coating

2. Slot insulation (Insert insulation paper polyester to armature or stator slots)

3. Wedge insertion

4. Impregnation varnish dipping or trickling

Good quality epoxy resin offers a broad range of impregnation resin for motors, generators and transformers. Optimal dipping or trickle results are granted due to our easy operation and maintance machine. The use of vacuum or vacuum pressure impregnation applications techniques provides for optimum machine protection against all type of stress by using a correctly engineered combination of impregnating resin , insulation system and application process. The removal of the air content from a winding by the application of vacuum let extend the working life of the machine due to increase of thermal dissipation as well as providing for improve mechanical properties.The use of both vacuum and pressure as a method of applying secondary insulation epoxy resin permits the application of liquid material (the liquid vanish have a wide range of viscosity, sometimes peristaltic pump is needed) to more demanding electrical equipment. The correct use of vacuum pressure impregnation also allows global impregnation for rotating electrical machines with the correctly designed insulation system up to at least 13,8 kV specifications.

 

 

Please click below link to view video

https://vimeo.com/126093234

 

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Trading Company,Seller

  • Year Established:

    2010

  • Total Annual:

    4 Million-5 Million

  • Employee Number:

    100~150

  • Ecer Certification:

    Verified Supplier

Shanghai Wind Automation Equipment Co.,Ltd supply motor automation solution for global motor manufacturers. Setted up in the year 2010 by Senior Engineer Mr.Wang who involve in electric motor filed since 1998. Through continuous innovation and participating in globalization, it has now developed int... Shanghai Wind Automation Equipment Co.,Ltd supply motor automation solution for global motor manufacturers. Setted up in the year 2010 by Senior Engineer Mr.Wang who involve in electric motor filed since 1998. Through continuous innovation and participating in globalization, it has now developed int...

+ Read More

Get in touch with us

  • Reach Us
  • Shanghai Wind Automation Equipment Co.,Ltd
  • No.4 Building , No.388, Kongjiang Road,Yangpu District,200093,Shanghai,China
  • https://www.statorwindingmachine.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement