Supply Ability | 500Tons |
Delivery Time | 7 days |
Packaging Details | Export Packing |
Thickness | 0.5-3.0MM |
Surface | Galvanized |
Width | 1000-2000mm |
Length | 2000-6000mm |
Type | Hot Dipped |
Brand Name | Ma Steel |
Model Number | HC420LAD |
Certification | SGS ISO |
Place of Origin | China |
View Detail Information
Explore similar products
ASTM A653 CS Type B Galvanized Steel Coil Sheet Astm A653 Hot Dipped Galvanized
EN10147 ASTM A653 Hot Dip Galvanized Coils 0.5-3.0mmGalvanized Strips Galvanized
Hot Dip Galvanized Steel Coils DX51D DX53D SGCC Z30-Z275 EN 10142 JIS G 3321
Hot Dipped Galvanized Steel Sheet DX51D Coated Z80 Z120 Z275 0.5-3.0mm Thickness
Product Specification
Supply Ability | 500Tons | Delivery Time | 7 days |
Packaging Details | Export Packing | Thickness | 0.5-3.0MM |
Surface | Galvanized | Width | 1000-2000mm |
Length | 2000-6000mm | Type | Hot Dipped |
Brand Name | Ma Steel | Model Number | HC420LAD |
Certification | SGS ISO | Place of Origin | China |
High Light | hot dipped galvanized steel coils ,galvanised steel coil |
High-Strength HC420LAD Galvanized Metal Sheet Special Use Surface Treatment Rubber Steel Sheet
Products | Gi steel coil |
Grade | SGCH,SGCC,DX51D,DC51D,ASTM A653 |
Standard | JIS G3302,JIS G3312,EN10142,ASTM A653M |
Delivery time | 20 days after payment |
Payment terms | L/C,D/A,D/P,T/T,Western Union or MoneyGram |
Supply ablitity | 50000 Metric Ton/Metric Tons per Month |
MOQ | 25 Metric Ton/Metric Tons |
Application | Mechanical&manufacture,Steel structure,Shipbuilding,Bridging,Automobile chassis |
Q1.What is your terms of packing?
A:Generally,we pack our goods in bundles or coils with rods or bettes.
We can also do package according to customer's request
Q2.What is your terms of payment?
A:T/T 30% as deposit, and 70% before delivery.We'll show you the photos of the product and packages before you pay the balance
Q3.What is your terms of delivery?
A:EXW,FOB,CFR.CIF,DDU.
Q4.How about your delivery time?
A:For stocks,we can send the goods to loading port within 7 days after receiving your deposit
For production period, it usually needs about 15 days-30days after receiving the deposit
Q5.Can you product according to the sample?
A:Yes,we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6.What is your sample policy?
A:We can supply the sample if we have ready parts in stock,but the customers have to pay the sample cost and the couner cost.
Q7.Do you test all your goods before delivery?
A:Yes. we have 100% test before delivery
Q8.How do you make our business long-term and good relationship?
A:1.We keep good quality and competitive price to ensure our customers benefit;
2.We respect every customer as our friend and we sincerely do business and make friends with them,no matter where they come from.
If you have any other questions.pls feel free to send email to us
Packaging |
Standard seaworthy export packing, other types of packing can be customized as every requirement. |
---|---|
Shipping packaging | Bundled with firm steel straps, easy for loading and unloading. |
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Agent,Exporter,Seller
Year Established:
1998
Total Annual:
80Millen-100 Millen
Employee Number:
200~500
Ecer Certification:
Verified Supplier
Jiangsu Mittel Steel Industrial Limited is located in Wuxi City, a beautiful city near Shanghai. Wuxi is close to Shanghai (BAO STEEL) ,Zhangjiagang (ZPSS),Ningbo (BAO XIN),KUN SHAN (DKSS), enjoy excellent geographic location and convenient water, land and air transporta... Jiangsu Mittel Steel Industrial Limited is located in Wuxi City, a beautiful city near Shanghai. Wuxi is close to Shanghai (BAO STEEL) ,Zhangjiagang (ZPSS),Ningbo (BAO XIN),KUN SHAN (DKSS), enjoy excellent geographic location and convenient water, land and air transporta...
Get in touch with us
Leave a Message, we will call you back quickly!