China factories

China factory - Wenzhou Zheheng Steel Industry Co.,Ltd

Wenzhou Zheheng Steel Industry Co.,Ltd

  • China,Wenzhou ,Zhejiang
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China TP304 / S30400 / 1.4301 / X5RCI18-10 ASTM A213 TP304 Cold Drawing Heat Exchanger
China TP304 / S30400 / 1.4301 / X5RCI18-10 ASTM A213 TP304 Cold Drawing Heat Exchanger

  1. China TP304 / S30400 / 1.4301 / X5RCI18-10 ASTM A213 TP304 Cold Drawing Heat Exchanger

TP304 / S30400 / 1.4301 / X5RCI18-10 ASTM A213 TP304 Cold Drawing Heat Exchanger

  1. MOQ: Negotiable
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms T/T, L/C
Supply Ability 1000+
Delivery Time 5-8days
Packaging Details as required
Material TP304 / S30400 / 1.4301 / X5RCI18-10
Type Seamless
Trade Terms FOB,CNF,CIF
High Light stainless steel boiler tubes, metric stainless steel tubing
Surface Treatment Varnishing
Standard ASTM, AISI, GB, DIN, EN
Transport Package Plywood Case
Trademark Zheheng
Brand Name zheheng
Model Number 19mm
Certification ISO9001 PED
Place of Origin CHINA

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T, L/C Supply Ability 1000+
Delivery Time 5-8days Packaging Details as required
Material TP304 / S30400 / 1.4301 / X5RCI18-10 Type Seamless
Trade Terms FOB,CNF,CIF High Light stainless steel boiler tubes, metric stainless steel tubing
Surface Treatment Varnishing Standard ASTM, AISI, GB, DIN, EN
Transport Package Plywood Case Trademark Zheheng
Brand Name zheheng Model Number 19mm
Certification ISO9001 PED Place of Origin CHINA
High Light Cold Drawing Heat Exchanger TubeASTM A213 Heat Exchanger TubeTP304 Heat Exchanger Tube
Cold Drawing Stainless Steel Heat Exchanger Tube Non - Destructive DIN / ASTM A213
 
Detailed Product Description
Material: TP304 / S30400 / 1.4301 / X5RCI18-10 Standard: A269 / A213
Type: Seamless Technique: Cold Drawing
Trade Terms: FOB,CNF,CIF Certificates: BV,DNV,NK,LR,ABS
High Light:

stainless steel boiler tubes

,

metric stainless steel tubing

 

 

TP304 / S30400 / 1.4301 / X5RCI18-10 Stainless Steel Heat Exchanger Tube / A269 / A213 standard

 

zheheng steel specializes in producing stainelss steel seamless pipe. We always put the quality as the first consideration. If you're interested in cooperating with our company, welcome to contact me. We will be happy to give you a quotation upon receipt of your detailed requirements.

 

Product Marking
1 In addition to the marking prescribed in Specification A 1016/A 1016M, the marking shall include the condition: hot finished or cold finished.
2 For the austenitic stainless steels having a grain size requirement (see Table 2) the marking shall also include the heat number and heat-treatment lot identification.
3 When either T2 or T12 are ordered with higher sulfur contents as permitted by Note B of Table 1, the marking shall include the letter, S, following the grade designation: T2S or T12S.

 

zheheng steel Chemical assurance

1. Each lot of raw materials will be tested by spectrometer before put in storage.

2. 100%PMI the mother pipe to ensure we put right material.

2. 100%PMI the finished pipe again to ensure we produced right grade


The main products:cold drawn seamless stainless steel,cold drawn seamless stainless steel pipe,cold drawn seamless stainless steel pipes

 

product description in details:

ITEM: TP304 / S30400 / 1.4301 / X5RCI18-10 Stainless Steel Heat Exchanger Tube / A269 / A213 standard
Brand: RONSCO,BAOSTEEL, JISCO, TISCO, etc.
Material: 201.202.301.302.304.304L.310S.316.316L.321.430.430A.309S.2205.2507.2520.430.410.440.904Lect. Or Customized
Standard: GB, AISI, ASTM, ASME, EN, BS, DIN, JIS
Size: ANSI /ASME size is under,other standard of size is for ready choice,O.D.:0.23''to 48''(5.8-1219mm)W.T.:0.04''to 2''(1.0-50.8mm)
Length: Max.18 Meter,NPS 1/8''-48'' Schedule:5/5S,10/10S,20/20S,40/40S,80/80S,120/120S,160/160S according to ANSI B36.19/36.10
Surface: Satin Finish(180#.240#.320#).,Bright Finish(400#,600#,mirror),Mill Finish(2B),Hairline-Finish(HL/Brushed),Ti-gold, Glossy matt,dull and so on.
Application: Decoration, construction and upholstery, etc
Package: Each tube in a plastic bag with size label outside and pack in small bundles or according to customer request
Lead Time: 7-10days for one FCL Or according to order list detail
Payment: A: 100% T/T advance. ( For small order.) B: 30% T/T and balance against copy of documents.
C: 30% T/T advance, balance L/C at sight D: 30% T/T , balance L/C usance
E: 100% L/C usance. F: 100% L/C at sight.
Sample: we could offer the sample for free charge but do not pay the cost of freight.

 

Heat Treatment Assurance

A full-automatic natural gas furnace with 24 meters in length.The real temperature tolerance could be within 10℃.

 

QUALITY CONTROL

1~ Incoming Raw Material Inspection

2~ Raw Material Segregation to avoid steel grade mix-up

3~ Heating and Hammering End for Cold Drawing

4~ Cold Drawing and Cold Rolling, on line inspection

5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T

6~ Straightening-Cutting to specified length-Finished Measuring Inspection

7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc

8~ Packing and Stocking

ZHEHENG STEEL has passed approved by ABS, DNV, GL, BV, PED 97/23/EC, AD2000-WO, GOST9941-81, CCS, TS, CNNC, ISO9001-2008, ISO 14001-2004 With good quality and competitive price, we warm a good reputation in domestic and international markets. We hope to build a good and long relationship with customers from home and abroad.

 

FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?
A: 100% T/T advance. ( For small order.)
B: 30% T/T and balance against copy of documents.
C: 30% T/T advance, balance L/C at sight
D: 30% T/T , balance L/C usance
E: 100% L/C usance.

 

product show:

S30400 / 1.4301 Stainless Steel Heat Exchanger Tube  A269 / A213 Standard 0

 

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Distributor/Wholesaler,Agent,Importer,Exporter,Trading Company

  • Year Established:

    1995

  • Total Annual:

    6,000,000-8,000,000

  • Employee Number:

    100~150

  • Ecer Certification:

    Verified Supplier

Zheheng steel is one  incorporate of manufacturer, Exporter ,consultant ,stockist company specialized in the area of stainless steel tubing , pipe fittings ,Flanges and other stainless steel grade accessories . It is one-stop-shop company ,our team have more than 20 years experience in sta... Zheheng steel is one  incorporate of manufacturer, Exporter ,consultant ,stockist company specialized in the area of stainless steel tubing , pipe fittings ,Flanges and other stainless steel grade accessories . It is one-stop-shop company ,our team have more than 20 years experience in sta...

+ Read More

Get in touch with us

  • Reach Us
  • Wenzhou Zheheng Steel Industry Co.,Ltd
  • No999 .wenzhou airport wenzhou city,zhejiang china
  • https://www.stainless-steelseamlesspipe.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement