Payment Terms | Western Union, T/T, L/C, MoneyGram |
Supply Ability | 5000000 pcs per year |
Delivery Time | 35days |
Packaging Details | Standard Package |
Display Type | Register |
Phase | Three Phase |
Measuring Energy | 0-999999 |
Pulse Constant | 3*400imp/kwh |
Color | White+Gray |
Brand Name | Radarking |
Model Number | DTS150 |
Certification | IEC, ISO9001 |
Place of Origin | Made In China |
View Detail Information
Explore similar products
Industrial Electricity Three Phase Electric Meter Static 3P4W Meter With LCD
RS485 / Infrared Three Phase Smart Meter , High Accuracy Multi Tariff Energy
High Reliable Three Phase Electric Meter Class 1.0 Active Energy Meter
Professional Three Phase Watt Hour Meter , Pulse Output Three Phase Electricity
Product Specification
Payment Terms | Western Union, T/T, L/C, MoneyGram | Supply Ability | 5000000 pcs per year |
Delivery Time | 35days | Packaging Details | Standard Package |
Display Type | Register | Phase | Three Phase |
Measuring Energy | 0-999999 | Pulse Constant | 3*400imp/kwh |
Color | White+Gray | Brand Name | Radarking |
Model Number | DTS150 | Certification | IEC, ISO9001 |
Place of Origin | Made In China | ||
High Light | three phase power meter , three phase smart meter |
Register Display Three Phase Electric Meter 3 * 220V / 380V With Pulse Output
Detailed Product Description
1. Model:DTS150
2. Standard:IEC521-1988
3. Function:measurement the active electric energy
4. Rated current:1.5(6)A,2.5(10)A,5(20)A,3(12)A,10(40)A,15(60)A,20(80)A,30(100)A
5. Rated voltage:400V
6. Accuracy: Class 0.5,1,2
7. Rated frequency:50Hz/60Hz
8. Bearing:Single-jewel,dual jewel,magnetic floating
9. Case:Aluminum,plastic,glass
10. Certificate:ISO9001:2000, ISO14001:1996,CE
Installing and using
DTS150 Three phase digital watt hour meter 3 phase 4 wire kwh meter energy meter price
1. The meter can be installed and used after being test and sealed with letterpress printing. Without letterpress printing or storage time is too long the meter must be reset.
2. The meter must be installed ventilate and arid place. The meter base board must be on the wall of fire resistance and uneasily shaking . The meter must be installed verticalty and the gradient shall not exceed 1°. The installation height is about 1.8 m.
3. The meter must be installed in the protective box in the dusty place or against possible mechanical injury.
4 Connecting must accord with the above drawing or the drawing in the extended cover. To use brass conductor to input to a.void that the meter shall be burnt due to loose contact.
5. In the too much thunderstorm place to adopt measures to avoid lighting injury.
6. The load capacity of the meter is between 0.05Ib~Imax . If the capacity exceeds above the register shall bot be accurate or the current coil shall be heated and burnt
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2002
Total Annual:
10000000-15000000
Employee Number:
100~200
Ecer Certification:
Active Member
Introduction: Wuhan Radarking Electronics Corp. is a modern share enterprises which focusing on the smart Internet of things(IOT) /smart grid energy consumption sensor/intelligent electric safety integrated solution. It established in 2002(former name: Wuhan Radarking Co.,Ltd.)and went publ... Introduction: Wuhan Radarking Electronics Corp. is a modern share enterprises which focusing on the smart Internet of things(IOT) /smart grid energy consumption sensor/intelligent electric safety integrated solution. It established in 2002(former name: Wuhan Radarking Co.,Ltd.)and went publ...
Get in touch with us
Leave a Message, we will call you back quickly!