Payment Terms | L/C, T/T |
Supply Ability | 200 sets per week |
Delivery Time | 15-25 days |
Packaging Details | pallets, bulk |
Material | Q235 steel channel |
OEM | Available |
finishing | painted, powder coated, or as per request |
Application | for retaining wall formwork |
Height | up to 3.3m |
Shifting | By crane |
Brand Name | HORIZON |
Model Number | Bracing support Single sided formwork |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Solid Structure Single Sided Wall Formwork Vertical Waling With Push Pull Braces
Heavy Strength One Sided Concrete Formwork Waterproof Surface 8.9m Height
Q235 Steel Channel Single Sided Wall Formwork Supported By Telescopic Brace
Heavy Duty One Sided Concrete Wall Forming Powder Coating Furface Crane Lift
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 200 sets per week |
Delivery Time | 15-25 days | Packaging Details | pallets, bulk |
Material | Q235 steel channel | OEM | Available |
finishing | painted, powder coated, or as per request | Application | for retaining wall formwork |
Height | up to 3.3m | Shifting | By crane |
Brand Name | HORIZON | Model Number | Bracing support Single sided formwork |
Place of Origin | CHINA | ||
High Light | one sided wall formwork ,one sided concrete formwork |
Bracing Support Single-sided Formwork with Easy Handling and Lower Cost
Bracing support single-sided formwork is also used for single-side structural walls construction. With simple structure, less weight and components, it is the ideal solution for walls less than 3.3 m high.
The push-pull braces are used to align and support the formwork. The loads resulting from the pouring are transferred into the push-pull brace and the cast-in tie anchors at the front base of the vertical waling.
Advantages:
1. The concrete pressure are reliably transferred to the embedded anchor systems and push-pull braces.
2. The maximum wall height is up to 3.3 m.
3. Once assembled, each set of bracket and panels can be easily lifted and moved to the required pouring location.
4. For safety, working platforms can be fixed into these systems
Components | Diagram / photo | Specification / description |
Vertical waling | ![]() | [12 steel channel |
Push-pull brace | ![]() | To support formwork |
Cross beam | ![]() | The cross beams are fastened to the frames by means of screw tie rods connected to the anchor system which are pre-casted in the concrete ground. Also, cross beam links single-sided frames in horizontal position to form a unit for lifting. |
Anchor rod D20 | ![]() | Cast in concrete and discharges the tensile loads into the building structure. With Dywidag thread, to transfer the load from the supporting frames into the floor slab or foundation.
|
Coupling nut D20 | ![]() | With hexagonal head, to connect cast-in anchor rod and re-usable anchor elements. |
Top scaffold bracket | ![]() | Painted, severs as safety working platform |
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2006
Total Annual:
10000000-15000000
Ecer Certification:
Site Member
As a professional formwork company, HORIZON Formwork Co., Ltd. contributes its effort to the design, manufacturing and marketing of formwork systems, scaffolding systems and all kinds of accessories, which are widely used in commercial, residential and infrastructural... As a professional formwork company, HORIZON Formwork Co., Ltd. contributes its effort to the design, manufacturing and marketing of formwork systems, scaffolding systems and all kinds of accessories, which are widely used in commercial, residential and infrastructural...
Get in touch with us
Leave a Message, we will call you back quickly!