Payment Terms | L/C, T/T |
Supply Ability | 10000 pcs per month |
Delivery Time | 15-25 days |
Packaging Details | pallets, bulk |
Material | steel pressed |
OEM | Available |
finishing | galvanized |
Size | L=40cm |
Application | to connect and align frame panel system |
Samples | available |
Brand Name | HORIZON |
Model Number | Doka Frami Adjustable Clamp |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Alignment Clamps DRS for Connection of Peri Domino Panel Formwork System
Cast Iron Spring Clamp Concrete Forming Accessories Tensioning Wire Tie Bar
Frami Clamp Concrete Forming Accessories Connecting Doka Framed Formwork Panels
Floor Prop Adjustable Fork Head Q235 Steel Plate Stabilizing H20 Beam With OEM
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 10000 pcs per month |
Delivery Time | 15-25 days | Packaging Details | pallets, bulk |
Material | steel pressed | OEM | Available |
finishing | galvanized | Size | L=40cm |
Application | to connect and align frame panel system | Samples | available |
Brand Name | HORIZON | Model Number | Doka Frami Adjustable Clamp |
Place of Origin | CHINA | ||
High Light | concrete formwork accessories ,concrete wall form accessories |
Galvanized Doka Frami Adjustable Clamp for Aligning Panel Formwork Systems
Doka Frami Adjustable Clamp is used for horizontally and vertically connecting the steel frame panels. With the aligning panel clamp the panel joints are closed absolutely tight in one work cycle and the panels are aligned and interconnected perfectly without any mismatch.
It is specially used at the panel joints where fitting-timbers are needed between two panels.
Weight: 3.6kg
Length: 400mm
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2006
Total Annual:
10000000-15000000
Ecer Certification:
Site Member
As a professional formwork company, HORIZON Formwork Co., Ltd. contributes its effort to the design, manufacturing and marketing of formwork systems, scaffolding systems and all kinds of accessories, which are widely used in commercial, residential and infrastructural... As a professional formwork company, HORIZON Formwork Co., Ltd. contributes its effort to the design, manufacturing and marketing of formwork systems, scaffolding systems and all kinds of accessories, which are widely used in commercial, residential and infrastructural...
Get in touch with us
Leave a Message, we will call you back quickly!