Payment Terms | T/T |
Supply Ability | 20 Sets Per Month |
Delivery Time | 30 days |
Packaging Details | Plywood Case |
Applied Standard | IEC 60245-1 |
Applied Clause | Clause 5.1.5 |
Sample | 1mm2~630 mm2 conductor core |
Two voltage chuck spacing | 100~1000mm |
Overall size | 1460×210×120 mm |
Adaptive bridge | Four-point bridge |
Brand | Sinuo |
Warranty | 1 year |
Brand Name | Sinuo |
Model Number | SN2301 |
Certification | Calibration Certificate (Cost Additional) |
Place of Origin | China |
View Detail Information
Explore similar products
100mm Drop Tester EN 71-1 Toys 1KG Impact Strength Test Apparatus
IEC60884-1 Switch Life Tester For Insulation Parts Thermal Resistance 20N Ball
Switches Intended for Self-ballasted Lamp Loads Automatic Breaking Capacity Test
Resistive Inductive Capacitive Load Cabinet for Switches Plugs and Sockets
Product Specification
Payment Terms | T/T | Supply Ability | 20 Sets Per Month |
Delivery Time | 30 days | Packaging Details | Plywood Case |
Applied Standard | IEC 60245-1 | Applied Clause | Clause 5.1.5 |
Sample | 1mm2~630 mm2 conductor core | Two voltage chuck spacing | 100~1000mm |
Overall size | 1460×210×120 mm | Adaptive bridge | Four-point bridge |
Brand | Sinuo | Warranty | 1 year |
Brand Name | Sinuo | Model Number | SN2301 |
Certification | Calibration Certificate (Cost Additional) | Place of Origin | China |
High Light | Power Cables Cable Clamping Device ,IEC 60245-1 Cable Clamping Device ,DC Resistance Measurement Cable Clamping Device |
IEC 60245-1 Cable Clamping Device For DC Resistance Measurement Of Power Cables
Product information:
This product is used for DC resistance measurement of various power cables and electrical equipment wires and cables. It can also be used to measure the DC resistance of other conductor materials.
Technical parameters:
1. The scope of application of the sample: 1mm2~630 mm2 single or multiple stranded conductor core.
2. Two voltage chuck spacing: 100~1000mm
3. Overall size: 1460×210×120 mm
4. Adaptive bridge: four-point measurement method of any bridge
Operation steps:
1. Adjust the distance. Since the clamp of this clamp is adjustable, the operator needs to check whether the distance between the two voltage clamps is 1m before measuring. The fixture must be regularly checked for 1 meter length by the local calibration department.
2. Adjust the distance between two adjacent current fixtures and voltage fixtures. The distance should be no less than 1.5 times the circumference of the cross-section of the sample being tested.
3. Wiring. Connect the bridge to the bridge clamp. Connect the wires between the two voltage clamps in the clamp.
4. Install the specimen. Unscrew the two current clamps and place the sample in the current clamps ① and ④. Straighten the specimen and clamp it. Turn the tensioning handle ⑥ to tighten the sample (do not use excessive force). Then gently clamp the voltage clamps ② and ③ until there is effective contact.
5. Start the test and record it.
Bridge Fixture Wiring Diagram:
Company Details
Business Type:
Manufacturer
Total Annual:
800000-1500000
Employee Number:
30~50
Ecer Certification:
Verified Supplier
Sinuo is an innovation manufacturing company, specializing in the research and development and sales of laboratory construction and testing equipment for electrical appliances (covering the construction of energy efficiency and performance laboratories, as well as supplementary waterproof testing la... Sinuo is an innovation manufacturing company, specializing in the research and development and sales of laboratory construction and testing equipment for electrical appliances (covering the construction of energy efficiency and performance laboratories, as well as supplementary waterproof testing la...
Get in touch with us
Leave a Message, we will call you back quickly!