Payment Terms | L/C, T/T |
Supply Ability | 6 sets/month |
Delivery Time | 90-100 work days |
Packaging Details | Exempted from inspection wooden case |
Max temperature | 1650 degree |
Vacuum system | made in china ;Leybold |
Structure | Horizontal type,cylinder |
Temperature uniformity | ±5 ℃ |
Brand Name | Ruideer |
Model Number | 300*300*1000 |
Certification | CE,ISO |
Place of Origin | China |
View Detail Information
Explore similar products
High Efficiency Vacuum Heat Treatment Furnace , Reliable Hot Isostatic Pressing
Energy Saving Sinter HIP Furnace Input Gas Allowed Ar / N2 / He ISO9001 Approved
Customized Design Sinter HIP Furnace For Cemented Carbide / Precision Ceramic
Customized Industrial Vacuum Furnace , Hot Isostatic Pressing Machine Max
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 6 sets/month |
Delivery Time | 90-100 work days | Packaging Details | Exempted from inspection wooden case |
Max temperature | 1650 degree | Vacuum system | made in china ;Leybold |
Structure | Horizontal type,cylinder | Temperature uniformity | ±5 ℃ |
Brand Name | Ruideer | Model Number | 300*300*1000 |
Certification | CE,ISO | Place of Origin | China |
High Light | Cylindrical Sinter HIP Furnace ,Horizontal Sinter HIP Furnace ,Non Oxide Ceramics Sinter HIP Furnace |
Sintering-HIP furnaces enable cost-optimized manufacturing of cemented carbide materials, non-oxide ceramics, and oth
Application:
Designed for sintering small production batches. As with the larger systems, its layout is freely configurable and it is broken down into its main components for delivery.
Technical parameters of equipment:
Service life of furnace shell |
20 years |
Furnace shell working time |
6000(furnace/time) |
Available working zone size(L*W*H) | 300*300*1000 |
Max.loading weight |
The load depends on the type of product |
Working temperature |
1850℃(maximum working temperature) |
1800℃(average working temperature ) | |
Pumping speed |
The vacuum degree can reach 5Pa within 30min after the pump is started, and the limit vacuum value can reach 1Pa after pumping for 30min after reaching 5Pa (After drying the furnace,under the empty furnace, clean and cold state)
|
Leakage rate |
≤3Pa/h (Measuring the limit vacuum after drying the furnace, stop the operation of the pump group and start the test.Average within 3 hours in empty furnace, clean and cold state)
|
Cooling speed |
Loading 150kg product,the cooling time of cooling temperature from 1400℃ to 100℃ just cost less or equal 7 hours. |
Cooling speed |
The inner furnace is equipped with rapid cooling fan and cooling water realize rapid cooling. |
Heat rod material | Graphite |
Temperature control mode |
PID adjustment mode |
Rated power |
Proximately 290KVA |
Wax collection rate |
≥98%(10kg paraffin refined wax ,Ar negative pressure dewaxing ,three averages at most
|
Uninterrupted power supply guarantee time
|
It can power the indicator lights and control the furnace when the power goes out,the time is more than or equal 60 minutes. |
After sales:
1.Installation, Commissioning And Acceptance
We do installation, commissioning and acceptance in buyer's plant.During the installation and commissioning period, the commissioning personnel shall be provided free of charge by the demander according to the staff standard.
The equipment shipped to the buyer, the seller received the buyer's notification, both within a week to carry the equipment out of the box together, then check the equipment and all components according to the packing list . Including equipment accessories, spare parts and special tools, attached manual and technical documents, etc. It can be installed after the acceptance check of equipment.
After installation and debugging, the equipment shall be accepted according to the technical accessories.
2.Training
When taking-over the Furnace to the customer, We will give a staff training to customer. The operating personnel of the customer should join to commission,test the furnace, when installing at customer’s company.
This is practical operation training and practical maintenance training,
and our technical personnel will telling the basic principle,equipment maintenance knowledge,And the common fault handling measures.We can training 2 ~ 3 workers. ( Training how to maintenance and operating.)
3. Warranty period
The warranty period of the equipment is 12 months, which starts from the date of installation and debugging of the supplier. Equipment failure happens, after-sales service personnel shall give solutions within 2 hours, after receiving the buyer's notification . If it is need to go to the site for treatment , operators dispatched by seller should arrive at the site within 48 hours after go aboard. In case of emergency,operators should arrive at the site within 48 hours after go aboard, and continue to make repairs until the fault is removed and the equipment returns to normal.
Company Details
Year Established:
2011
Total Annual:
15 Million-19 Million
Employee Number:
180~220
Ecer Certification:
Verified Supplier
Zhuzhou Ruideer Intelligent Equipment Co., Ltd. is a manufacturer of powder metallurgy solutions for the whole industry chain. It integrates process development, production, sales and coating services of sintering furnace, PVD coating furnace and CVD coating furnace. ... Zhuzhou Ruideer Intelligent Equipment Co., Ltd. is a manufacturer of powder metallurgy solutions for the whole industry chain. It integrates process development, production, sales and coating services of sintering furnace, PVD coating furnace and CVD coating furnace. ...
Get in touch with us
Leave a Message, we will call you back quickly!