Payment Terms | L/C, T/T |
Supply Ability | 7 sets/month |
Delivery Time | 5-8 months |
Packaging Details | wooden box |
Usage | Sintering Furnace,Heat Treatment Furnace,Vacuum furnace |
Warranty | 1 Year |
Weight | 2t-35t |
After-sales service provided | Field maintenance and repair service |
Max temperature | 1580℃ |
Heating rate | 260-360KVA |
Brand Name | Ruideer |
Model Number | Customizable |
Certification | CE certificate, GB150, JB4732 |
Place of Origin | China |
View Detail Information
Explore similar products
Power Output Stability Vacuum Heat Treatment Furnace Input Gas Allowed H2 / CH4
Phone Monitored High Temperature Vacuum Furnace Vacuum Leakage Rate 3Pa/H
Extreme Vacuum 1.5Pa High Temperature Electric Furnace Max Working Pressure
Saving Energy High Temperature Vacuum Furnace Low Energy Consumption Small
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 7 sets/month |
Delivery Time | 5-8 months | Packaging Details | wooden box |
Usage | Sintering Furnace,Heat Treatment Furnace,Vacuum furnace | Warranty | 1 Year |
Weight | 2t-35t | After-sales service provided | Field maintenance and repair service |
Max temperature | 1580℃ | Heating rate | 260-360KVA |
Brand Name | Ruideer | Model Number | Customizable |
Certification | CE certificate, GB150, JB4732 | Place of Origin | China |
High Light | 10bar High Temperature Vacuum Furnace ,CE High Temperature Vacuum Furnace ,Sintering Heat Treatment Vacuum Furnace |
Technical parameters
Valid working space |
Customizable |
Max working pressure |
10bar-100bar |
Cooling time (full load) |
Cooling time for sintering Temperature 1450℃~100℃: 7-8h (Empty furnace, water temperature≤26℃, 9.5bar≤pressure≤9.8bar) |
Max.loading weight |
The load capacity depends on the product type |
Service life for furnace shell |
20 years |
Operating times for furnace shell |
6000 furnaces |
Max. Design Temperature |
1600℃ |
Max. Working Temperature |
1580℃ |
Pumping speed |
The vacuum degree can reach 5Pa within 30min after starting the pump. After reaching 5Pa and then pumping for 60min, the ultimate vacuum value reaches 1Pa (within a cold, empty and clean furnace that has been dried before). |
Leakage rate |
≤3Pa/h (stop the pump group operation and start checking after testing the limit vacuum (within a cold, empty and clean furnace that has been dried before). |
Wax yield rate |
≥98%(10kg pure paraffin, argon negative pressure dewaxing. Measured by three times of mean values at most). |
UPS guarantee time |
It can power the indicator light and control the furnace during power outage for more than 80 minutes. |
Max.heating rate |
8℃/min (the room temperature rises to 1580℃ within a vacuum and empty furnace. 600℃, 1000℃, 1200℃ half-way insulation is allowed). |
Company Details
Year Established:
2011
Total Annual:
15 Million-19 Million
Employee Number:
180~220
Ecer Certification:
Verified Supplier
Zhuzhou Ruideer Intelligent Equipment Co., Ltd. is a manufacturer of powder metallurgy solutions for the whole industry chain. It integrates process development, production, sales and coating services of sintering furnace, PVD coating furnace and CVD coating furnace. ... Zhuzhou Ruideer Intelligent Equipment Co., Ltd. is a manufacturer of powder metallurgy solutions for the whole industry chain. It integrates process development, production, sales and coating services of sintering furnace, PVD coating furnace and CVD coating furnace. ...
Get in touch with us
Leave a Message, we will call you back quickly!