Payment Terms | L/C, T/T, D/A, D/P |
Supply Ability | 50 SETS PER MONTH |
Delivery Time | 45 DAYS |
Packaging Details | Standard Export Package |
Mold Material | high hardness steel |
Model No. | JL-288-12S |
Overseas service | available |
Productivity | 100-150pair per hour |
Gross weight | 18tons |
Motor | normal or servo optional |
Machine features | Automatic |
Product material | PVC |
Machine Guarantee | 2 Year |
Work station | 12 sation |
Brand Name | Kingstone |
Model Number | JL-288-2C |
Certification | CE, SGS |
Place of Origin | Dongguan City, China |
View Detail Information
Explore similar products
Rain / Water Boot / Gumboot/ Mineral Worker Boot Dual Injection Molding Machine
Easy Operate Slippers Sandal Boots Making Machine For PVC TPR Material
12 Stations 1/2 Color Boot Injection Molding Machine , Gumboots Making Machine
Three Color Full Plastic Rain Boot Making Machine For PVC / TPR Raw Material
Product Specification
Payment Terms | L/C, T/T, D/A, D/P | Supply Ability | 50 SETS PER MONTH |
Delivery Time | 45 DAYS | Packaging Details | Standard Export Package |
Mold Material | high hardness steel | Model No. | JL-288-12S |
Overseas service | available | Productivity | 100-150pair per hour |
Gross weight | 18tons | Motor | normal or servo optional |
Machine features | Automatic | Product material | PVC |
Machine Guarantee | 2 Year | Work station | 12 sation |
Brand Name | Kingstone | Model Number | JL-288-2C |
Certification | CE, SGS | Place of Origin | Dongguan City, China |
High Light | 16 Station Safety Shoes Making Machine ,Rotary Table Safety Shoes Making Machine ,Safety Boot Making Machine |
12/16 Station Rotary Table Safety Boots Safety Shoes Making Machine
Gumboots production line-600x600-0.jpg.pdf
Payment Terms
1. Negotiated, 30% T/T down payment , balance shall be paid before shipment by T/T.
Specifications
Machine model | JL-288 | JL-288-2C | |
Mould-clamping Unit | |||
Work station | 12,16 | 12,16 | |
Clamping force | TON | 220 | 220 |
Opening stroke | MM | 210 | 350 |
Mould dimension | MM | 420x320 | 650*260 |
Height of injection nozzle | MM | 280 | 650 |
Injection Unit | |||
Injector | SET | 1 | 2 |
Screw diameter | MM | 90/95 | 95/90,85/80 |
Screw L/D ratio | L/D | 19 | 19 |
Max.injection volume | cm3 | 1500-1700 | 1500-1700,800-950 |
Injection speed | Cm/s | 520 | 520 |
Screw rotation speed | R.P.M | 0-200 | 0-200 |
Electricity Consumption | |||
Heating power of injector | KW | 7 | 7*2 |
Hydraulic unit motor | KW | 22.5 | 22.5,18.5 |
Total electric consumption | KW | 29.5 | 55 |
Temperature control | Section | 4 | 4*2 |
Dimension and Weight | |||
Machine dimension | (L*W*H)MM | 5100*4900*2550 | 7600*4900*2550 |
Machine weight | KGS | 11000 | 18000 |
*Note:Above data only for reference. |
Samples:
Applications:
1. Specialized in producing 1 color or 2 color full plastic boots or shoes.
2. Material: suitable for all kinds of thermoplastic raw material, foaming or non-foaming, such as PVC and TPR.
3. Equipped with Adopts industrialization human-computer interface, PLC controlling system, make the operation easily
4. Hydraulic system with double proportion, adjustable pressure and flow rate make products quality more steady.
5. Every stations are controlled by the PLC seperately, can put the moulds with different styles and sizes at the same time
Machine Production Time
25-45 days after confirm deposit.
Packing
Professional export package, plastic film packing, or Wooden case packing.
Shipping
By Sea, One Container for one machine
Delivery Terms
As per request: EXW, FOB, CIF for your option;
Guarantee
2 years. We provide 2 years guarantee time for all of our machine, it’s the longest time in China.
Four parts required for Shoes line:
1. Main shoes injection machine
2. Auxiliary equipment (Drying machine,Color mixer,Air compressor,Crusher,Cooling tower)
3. Shoes mold (which design you want make,customize mold)
for example, a design comes in 6 size from 35-40 for women,you need 6 pairs molds accordingly.
4. PVC material (try to find in local and also available in China )
After sell service:
Seller arrange technician engineer to Buyer’s for machine install and training for 7-10 days no need salary.
Buyer charge engineer’s translator.visa.round-trip ticket,food and hotel.
Over 10 days.Buyer should pay engineer daily 100 USD.
How many mold should i need?
Kindly note mold quantity depends on your design and each design how many size.
For example,if you got 3 designs,each design comes in 6 sizes, you need 18 pairs molds accordingly.
Usually one set of machine make 3 to 4 design is suitable.
Production Process
It need 1-3 people for the full process as follows:
Company Details
Business Type:
Manufacturer
Year Established:
2015
Total Annual:
1500000-300000
Ecer Certification:
Verified Supplier
Dongguan Kingstone Shoe-making Machinery Co. Ltd., headquarter located in Dongguan city, has been researching and developing from manufacturing various kinds of footwear machines. Kingstone is striving toward larger business scope to provide customers diversified machine designs, perfect production ... Dongguan Kingstone Shoe-making Machinery Co. Ltd., headquarter located in Dongguan city, has been researching and developing from manufacturing various kinds of footwear machines. Kingstone is striving toward larger business scope to provide customers diversified machine designs, perfect production ...
Get in touch with us
Leave a Message, we will call you back quickly!