Payment Terms | L/C,T/T |
Supply Ability | 19 sets/month |
Delivery Time | 45 working days |
Packaging Details | 1. one 20ft container for loading one set machine with manual decoiler; 2. the whole Wiped Anti Rust Oil, PLC controller covered by foam film |
Type | Tile Forming Machine |
Cutting type | Servo Tracking Cutting |
Machine weight | 3.5 tons |
Raw material | Galvanized Sheet |
Production capacity | 20m/min |
Warranty | 12 months |
Cutting blade material | Cr 12 High Grade Steel |
Voltage | 380v 50-60hz 3Phase |
Brand Name | SHITONG |
Model Number | steel frame-90 |
Certification | ISO,CE |
Place of Origin | Cangzhou, China |
View Detail Information
Explore similar products
Hand touch screen light steel keel roll forming machine for house ceiling making
Steel U channel light steel keel roll forming machine with flying cutting system
high speed metal stud and truck frame light steel keel roll forming machine
metal stud and track tracks light steel keel roll forming machine
Product Specification
Payment Terms | L/C,T/T | Supply Ability | 19 sets/month |
Delivery Time | 45 working days | Packaging Details | 1. one 20ft container for loading one set machine with manual decoiler; 2. the whole Wiped Anti Rust Oil, PLC controller covered by foam film |
Type | Tile Forming Machine | Cutting type | Servo Tracking Cutting |
Machine weight | 3.5 tons | Raw material | Galvanized Sheet |
Production capacity | 20m/min | Warranty | 12 months |
Cutting blade material | Cr 12 High Grade Steel | Voltage | 380v 50-60hz 3Phase |
Brand Name | SHITONG | Model Number | steel frame-90 |
Certification | ISO,CE | Place of Origin | Cangzhou, China |
High Light | stud and track roll forming machine , keel making machine |
Omega profile light gauge steel wall angle framing roll forming machine for ceiling production line
1. Instruction of this machine line
The complete machine line includes manual decoiler, main body of roll forming machine, hydraulic cutting system, PLC control system and discharge table. The users can set order as per their requirement to produce the special pieces and length products. This machine line can work automatically by PLC control system. It is easy to operate and running stably.
---- It is very easy to install the equipment and suitable for producing in the factory.
---- Low noise with high efficiency.
2. The roll forming machine parameters
NO. | Type | Specification |
1. | Raw material | PPGI&GI 0.3-0.8MM |
2. | De-coiler | Manual,6tons |
3. | Roller station | 12 rows |
4. | Diameter of shaft | 50mm |
5. | Material of rollers | Bearing steel |
6. | Material of Shaft | 45#steel with 0.05mm chrome |
7. | Driving way | Chain |
8. | Cutter type | Automatic hydraulic type |
9. | Blade Material | GCR12 steel |
10. | control system | PLC,Frequency converter,Counter |
Machine Components | ||
No. | Name | QTY |
1 | Manual uncoiler | 1 set |
2 | Feeding and leveling device | 1 set |
3 | Roll forming system | 1 set |
4 | Hydraulic punching and cutting | 1 set |
5 | Product support frame | 1 set |
6 | PLC Control System | 1 set |
3. After-sales service
(1) Once you paid the deposit, we will start the production as soon as possible. When the machine is finished, you can come to check the machine, we will arrange your accommodation and relative schedule. If you don't come, we can test the machine and send you test video. It's no problem.
(2) Our machines have one year guarantee, within one year, if the machine parts has some problem, we will be in charge of the repairing or replace. Also we will deliver the customer some spare parts together with the machine when loading the machine.
(3) If the buyer need overseas debug, we can also send technician to your factory, the customer should undertake all related cost including the accommodation and round-trip ticket of technician: 100 USD/day . The buyer should make sure the safety of technician.
4. FAQ (about our roll forming machine)
4.1:How is this machine's service life?
A:In the normal maintenance,the service life at least 8 years.
4.2:How to maintenance?
A:If using frequently,best coating lubricant on the chain and two ends of the shaft every month, replace the hydraulic oil every 1-2 years.
4.3:What can you do if the machine broken?
A:Our machine's warranty period is 1 year,
if the broken parts can't repair,we can free send the new parts replace the broken parts to you except the solenoid valve,the solenoid valve you must pay the express cost yourself.
if after warranty period,we can through negotiation for to solve the problems,and we supply the technical support for the whole life of the equipment.
5. Roll forming machine pictures:
Company Details
Business Type:
Manufacturer,Exporter,Trading Company,Seller
Year Established:
2010
Total Annual:
100-200
Employee Number:
50~100
Ecer Certification:
Verified Supplier
Botou Shitong Cold Roll Forming Machinery Manufacturing Co., Ltd. was established in 2001. Our company is a comprehensive enterprise integrating production, sales and services. We are mainly devoted to the development and manufacturing of metal plate cold bending roll forming equipment. We ha... Botou Shitong Cold Roll Forming Machinery Manufacturing Co., Ltd. was established in 2001. Our company is a comprehensive enterprise integrating production, sales and services. We are mainly devoted to the development and manufacturing of metal plate cold bending roll forming equipment. We ha...
Get in touch with us
Leave a Message, we will call you back quickly!