Payment Terms | T/T |
Supply Ability | 30 SETS/ MONTH |
Delivery Time | 40 days after payment |
Packaging Details | Container |
Material of rollers | 45# steel |
Production Capacity | 8-12m/min |
Power(W) | 7.5KW |
Roller Material | GCr15 |
Cutting Power | 5.5kw |
Brand Name | Shenghong |
Model Number | SH16-06-05-06 |
Certification | ISO9001 and CE |
Place of Origin | China, Jiangsu |
View Detail Information
Explore similar products
Shutter Door Cold Roll Forming Machine Roll Forming Line High Frequency
Durable Profile Shutter Roll Forming Machine With Siemens PLC Control
Shutter Edge Covering Rolling Forming Machine With Track Cutting 5.5 KW 380V
Automobile Window Shutter Profile Making Machine High Frequency With PLC System
Product Specification
Payment Terms | T/T | Supply Ability | 30 SETS/ MONTH |
Delivery Time | 40 days after payment | Packaging Details | Container |
Material of rollers | 45# steel | Production Capacity | 8-12m/min |
Power(W) | 7.5KW | Roller Material | GCr15 |
Cutting Power | 5.5kw | Brand Name | Shenghong |
Model Number | SH16-06-05-06 | Certification | ISO9001 and CE |
Place of Origin | China, Jiangsu | ||
High Light | door frames roll forming machine , frame making equipment |
Drawing for you reference:
Suitable material | Steel with 1.2-1.5mm |
Main roller station | 18 groups |
Straighting rollers | 5 groups |
Motor power | 7.5KW |
Reduce type | 250# |
Shaft diameter | Φ70mm |
Shaft material | 45# forging Steel |
Roller material | GCr15 |
Roller treatment | Vacuum hardening & Polished |
Galvanization | 0.05mm |
Processing speed | 8-12m/min |
Chain size | 1.2inch |
PLC Brand | SIEMENS |
Frequency Changer | SANJING |
Electrical element | Schneider |
Touch screen | Touch-win |
Fuse protector | Schneider |
Control transformer | Schneider |
Voltage standard | 380V50Hz |
Hydraulic Pump Station | 1 SET |
Pump Motor Power | 5.5KW |
Cutting mold material | Cr12 |
Length Cutting Tolerance | +/-1.5mm |
The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
Training time: 5 days.
Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2008
Total Annual:
3 Million-5 million
Employee Number:
45~60
Ecer Certification:
Active Member
Company introduction We are located in Jiangyin city, Jiangsu province, specializes in manufacturing various types of high speed, high precision roll forming machines, with more than 20 years’ experience. It has gained highly praise by customers from all over the world, due to top qua... Company introduction We are located in Jiangyin city, Jiangsu province, specializes in manufacturing various types of high speed, high precision roll forming machines, with more than 20 years’ experience. It has gained highly praise by customers from all over the world, due to top qua...
Get in touch with us
Leave a Message, we will call you back quickly!