Payment Terms | T/T |
Supply Ability | 30 SETS/ MONTH |
Delivery Time | 40 days after payment |
Packaging Details | Container |
Use | Wall |
Power(W) | 3kw |
Production line speed | 8-12m/min |
Voltage | 380v(or as your required) |
Control system | Fully automatic |
Brand Name | Shenghong |
Model Number | SH16-06-05-14 |
Certification | CE/ISO |
Place of Origin | China, Jiangsu |
View Detail Information
Explore similar products
Door Frames Roll Forming Machine Galvanized Steel Sheet Rolling Forming Machine
Door Frame Roll Forming Machine
Hydralic Cutting Galvanized Steel Roller Shutter Door Forming Machine PLC
PLC Control Steel Metal Door Frame Roll Forming Machine 5.5KW 8 - 12 m / min
Product Specification
Payment Terms | T/T | Supply Ability | 30 SETS/ MONTH |
Delivery Time | 40 days after payment | Packaging Details | Container |
Use | Wall | Power(W) | 3kw |
Production line speed | 8-12m/min | Voltage | 380v(or as your required) |
Control system | Fully automatic | Brand Name | Shenghong |
Model Number | SH16-06-05-14 | Certification | CE/ISO |
Place of Origin | China, Jiangsu | ||
High Light | door frame making machine , frame making equipment |
Click on the below ficture to see the video:
What is the details?
Manual Decoiler | 1 Material coil inner diameter: 300mm- 2 Carrying capacity: 2T |
Forming Device | 1.Number of forming steps: 13steps 2.Shaft material: 45# steel with harden treatment, outer diameter 80mm 3 Roller material: 45# steel 4.rollers crome coated: chromeplate 5. Main motor power: 3.0kw 6.Cutter power:3.5kw 8. Forming speed: 8-10 m/min 7. Voltage:380V/50Hz/3 phrase 8.Weight: about 1.5 T 9. Size:5000*800*800mm 10.Type of cutting: hydraulic cutting 11.Diameter of shaft:70mm 12.Structure:400 H Beam Welded 13 Sizes of chain: 1.5 inch inner side |
Cutting Device | 1.Stop to Punching, Stop to Cutting, post punch, Post Cut, no slug 2. Hydraulic motor: 3.0Kw 3.Cutting tool material: Cr12, Heat treatment |
Control Device | 1. English and Chinese exchange 2 Ombined with: PLC, Inverter , Encoder, etc 3. Cut-to-length tolerance≤±2 mm 3. Control Voltage 24V 4 PLC brand :panasonic |
|
|
Payment Terms | Payment:T/T(50% down payment in advance,50% when see the B/L Copies.) (3)Delivery: within 30 working days after receipt of deposit. |
Warranty | Tow years, and we will provide the technical support for the whole life. |
Packing | The subject can be loaded in one 40’ GP container. Packing style: Naked |
Our machine | Other company 's machine | Influence of the machine | |
Machine's base | High strength H350 / H400 steel. machine through milling macine after welding | H270 steel mark, after welding use manual polish | keep base in the same horizontal line, ensure product standard |
Roller material | High grade No.45 forged steel, with digital-controlled procession, Plated with 5 um chrome coated | Normal No. 20 steel with Simple polished and have no coating | Roller will have longer use life and ensure the products have same size,no nick on the surface. |
Side wall | Use high strength16mm thickness steel panel mark | Use 12 mm thickness steel panel mark | Ensure machine harder to deform, keep the product accurate and stable |
Active shaft material | High grade solid No.45 carbon steel, Shaft diameter is 72mm. surface CNC polish treatmen | Normal No. 45 steel with no surface treatment | Improve the integrated mechanic feature of the shaft. and ensure the shaft stability keep product standard |
Electrical elements | PLC control panel, transducer imported from Mitsubishi of Japan. Other elements from famous suppliers in China | All the elements are made in china | Machine become more accurate and more stable |
Cutter blade | Cr12 mould steel with quenched treatment | Normal high strength steel without quenched treatment | Stable the integrated mechanic feature of the cutter blade,harder to deform, longer blade's life, ensure product standard |
The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
Training time: 5 days.
Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2008
Total Annual:
3 Million-5 million
Employee Number:
45~60
Ecer Certification:
Active Member
Company introduction We are located in Jiangyin city, Jiangsu province, specializes in manufacturing various types of high speed, high precision roll forming machines, with more than 20 years’ experience. It has gained highly praise by customers from all over the world, due to top qua... Company introduction We are located in Jiangyin city, Jiangsu province, specializes in manufacturing various types of high speed, high precision roll forming machines, with more than 20 years’ experience. It has gained highly praise by customers from all over the world, due to top qua...
Get in touch with us
Leave a Message, we will call you back quickly!