Payment Terms | T/T |
Supply Ability | 800tons/months |
Delivery Time | 100 working days |
Packaging Details | SEA PACKING |
Company Type | Manufacturer |
Material Of Fin | Carbon Steel or Aluminum |
Fin Shape | Square Or Rectangular |
Range Of Application | Industry Boiler,Power Plant Boiler |
Range Of Applications | Heat Exchange |
Size | Customized |
Brand Name | SANCO |
Model Number | Boiler Fin Tube |
Certification | ASME, ISO, GRADE A, EN |
Place of Origin | China |
View Detail Information
Explore similar products
High Frequency seamless Carbon Steel Boiler Tube Spiral Fin Heat Exchange
Steam Spiral Boiler Fin Tube Economizer ASME Standard High Pressure Sa209 T1
Sugar Factory Boiler Steel Pipe Superheater Tubes In Power Plant
Economizer Marine Membrane Wall Boiler Fin Tube Pipe High Temperature
Product Specification
Payment Terms | T/T | Supply Ability | 800tons/months |
Delivery Time | 100 working days | Packaging Details | SEA PACKING |
Company Type | Manufacturer | Material Of Fin | Carbon Steel or Aluminum |
Fin Shape | Square Or Rectangular | Range Of Application | Industry Boiler,Power Plant Boiler |
Range Of Applications | Heat Exchange | Size | Customized |
Brand Name | SANCO | Model Number | Boiler Fin Tube |
Certification | ASME, ISO, GRADE A, EN | Place of Origin | China |
High Light | 25mm fin tube boiler ,OEM fin tube boiler ,Boiler Spiral fin tube |
Product: | Spiral fin tube | |
Material: | Aluminium;copper;alloy | |
Origin Country: | Shanghai, China | |
MOQ: | 5 Tons | |
Delivery Time: | 35 days after PO and advanced payment to Shanghai Port | |
Bare tube size: | OD16mm-OD219mm | |
Fins Pitch: | 3mm-25mm | |
Fins Height: | 9mm-25mm |
Manufacture
High frequency and high frequency welding spiral finned pipe is one of the most widely used spiral finned pipe at HDB.It is widely used in power, metallurgy, cement industry waste heat recovery and petrochemical industry.High frequency welding spiral finned pipe is in the steel belt winding steel pipe at the same time
, using the skin effect and proximity effect of high frequency current, the steel belt and the outer surface of the steel pipe are heated until the plastic state or melting, and the welding is completed under certain pressure of the wound steel belt.This high frequency welding is actually a solid phase welding.Compared with Mosaic, brazing (or overall hot dip galvanizing) and other methods, it is more advanced in product quality (fin bonding rate is high, up to 95%), productivity and automation.
Specifications
1). Add the heat exchange area and reduce the number of tubes, also increase the fume flow section area to reduce the fume speed and abrasion.
2). H type fin tube can be made to double H type fin tube, high rigidness to fit long tube row.
3). H type fin economizer arranged in line to make the space into many small zones, averaged air flow to reduce the abrasion.
4). With straight channel to gain the best ash-blowing effect.
5). The compact structure to reduce the weight and reduce the manufacturing cost.
Base Tube Material | Stainless Steel, Carbon Steel, Alloy Steel, Copper Alloy,Aluminum ,SA179 |
Fin Material | Aluminum, Copper Alloy, Stainless Steel, Carbon Steel |
Standard | ASME SA213/ASTM; ASME EA 106, ASME SA178, ASTM B1111 |
Fin depth | 0.5-3mm |
Base pipe O.D | 12.7-18mm |
Fins per inch | 8-20Nos (as customer's request) |
Test Requirement | Physical Property Test, Chemical Composition Analysis, Non-Destructive Test, Other Inspection and Test as customer's requirement. |
Application | Air Cooler, Charge Air Chiller, Condenser, Evaporator, Fluid Cooler, Gas Cooler, Oil Cooler, Radiator, Refrigeration, Steam to Air Heat Exchange, super heater etc. |
Company Information
HD Boiler established in 1985, Zhangjiagang Hua Dong Boiler Co., Ltd. (trading as HD Boiler), is a professional industrial manufacturer, producing utility boiler,industrial boiler,HRSG boiler and all kinds of boiler parts, such as waterwall panels, economizers, air preheaters, superheaters, headers, spiral fin tubes, H-fin tubes, heat pipes etc. HD Boiler is located in Dong Lai Industrial Park, east suburb of Zhang Jia Gang City. The plant’s location is around 150km Expressway to Shanghai Port or 60km State Road to Suzhou or Wuxi, with transportation extending in all directions conveniently and quickly.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2024
Total Annual:
1000-2000
Employee Number:
200~300
Ecer Certification:
Verified Supplier
SuZhou Saneco boiler co.ltd is a high-tech enterprise specialized in producing of boiler spare parts, such as fin tubes, economizers, super-heater and re-heater, boiler water wall panels, boiler manifold headers, and boiler steam drums for industrial boilers. Company also provide turnkey servic... SuZhou Saneco boiler co.ltd is a high-tech enterprise specialized in producing of boiler spare parts, such as fin tubes, economizers, super-heater and re-heater, boiler water wall panels, boiler manifold headers, and boiler steam drums for industrial boilers. Company also provide turnkey servic...
Get in touch with us
Leave a Message, we will call you back quickly!