Payment Terms | T/T |
Supply Ability | 800tons/months |
Delivery Time | 120 working days |
Packaging Details | SEA PACKING |
Orientation | Horizontal |
Storage Medium | Gas/Water |
Safety Valve | ASME Certified |
Connection Type | Flanged |
Pressure Vessle | Steel Pressure Vessle |
Available | Energy Saving |
Brand Name | SANCO |
Model Number | Boiler manifold header |
Certification | ASME, ISO, GRADE A, EN |
Place of Origin | China |
View Detail Information
Explore similar products
Q245R P265GH Water Boiler Steam Drum Natural Circulation
Cylindrical Mud Drum Steam Boiler High Pressure Energy Saving OEM
Upper Steam Boiler Water Drum High Pressure ASME Standard
Industrial FBC Mud Steam Boiler Steam Drum Carbon Alloy Steel
Product Specification
Payment Terms | T/T | Supply Ability | 800tons/months |
Delivery Time | 120 working days | Packaging Details | SEA PACKING |
Orientation | Horizontal | Storage Medium | Gas/Water |
Safety Valve | ASME Certified | Connection Type | Flanged |
Pressure Vessle | Steel Pressure Vessle | Available | Energy Saving |
Brand Name | SANCO | Model Number | Boiler manifold header |
Certification | ASME, ISO, GRADE A, EN | Place of Origin | China |
High Light | Stainless Steel Boiler Steam Drum ,Boiler Steam Drum Manifold Headers ,Stainless Steel steam and water drum |
Boiler Steam Drum Manifold Headers Carbon Steel Alloy Steel Stainless Steel
In manufacturing, the key of end cover hinder is welding. Since by manual arc welding, the weld joint is single-side welding without quality guarantee at the ends. In addition, due to large welding workload, frequent return for repair and long working period, it became the throat process of the whole hinder production.
When making hinders of the style, we adopt advanced production technique, complete large equipment and mature technology, especially automatic submerged arc welding between hinders and end covers. Such welding methods have high manufacturing efficiency, good quality, beautiful welding shape, safety, reliability, etc.
Material | Carbon steel,Alloy steel,Stainless steel. |
Length | According to costumes requirements. |
Temperature Range | 300℃~1500℃ |
Diameter(OD) | 76mm~914mm |
Details of Manifold Headers
1.The necking hinders of the Company are made by hot press and retracting of seamless steel pipes at special hinder necking machine.
2.In this way, the hinders will have thicker walls and cleaner surface. The necking cover will form membrane stress rather than bending stress with desired stress performance under the effect of inner pressure.
Features of Manifold Headers
1. Strength calculation report with applied materials information.
2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod.
3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler.
4. Hydraulic test report: ensure the standard working pressure and safety.
5.Excellent in welding quality, highly automatic, safe and reliable.
Classification of Manifold Headers
1 | Headers form an important part of all types of boilers. |
2 | Steam from the generating tubes is collected in headers which are therefore always under pressure. |
3 | This pressure may vary from 300 psi to 2000 psi. Since headers are always under pressure, the utmost care is taken by us while fabricating them. |
4 | Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the header. |
1 | In manufacturing, the key of end cover hinder is welding. |
2 | Since by manual arc welding, the weld joint is single-side welding without quality guarantee at the ends. |
3 | In addition, due to large welding workload, frequent return for repair and long working period, it became the throat process of the whole hinder production. |
4 | When making hinders of the style, we adopt advanced production technique, complete large equipment and mature technology, especially automatic submerged arc welding between hinders and end covers. |
Materials
1. Carbon steel:20G,SA-106B,SA-106C,etc.
2. Low-alloy thermal resistant steel:15CrMoG,12Cr1MoVG,SA-335P12,SA335-P22,etc.
3. Middle-alloy thermal resistant steel:SA-335P91,etc.
4. Special material(ultra-supercritical):SA-335P122,SA-335P92,etc.
The boiler headers have water wall header,superheater header,economizer header and so on. It acts action of gathering, mixing and redistribution in boiler systems. In structure, they include end cover hinders or necking hinders.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2024
Total Annual:
1000-2000
Employee Number:
200~300
Ecer Certification:
Verified Supplier
SuZhou Saneco boiler co.ltd is a high-tech enterprise specialized in producing of boiler spare parts, such as fin tubes, economizers, super-heater and re-heater, boiler water wall panels, boiler manifold headers, and boiler steam drums for industrial boilers. Company also provide turnkey servic... SuZhou Saneco boiler co.ltd is a high-tech enterprise specialized in producing of boiler spare parts, such as fin tubes, economizers, super-heater and re-heater, boiler water wall panels, boiler manifold headers, and boiler steam drums for industrial boilers. Company also provide turnkey servic...