Delivery Time | 80~120 days |
Packaging Details | Steel frame |
Porduct Name | Boiler Economizer Bank |
Standard | ASME, EN, GB |
Fuels Of Boiler | Coal, Biomass, Gas |
Material | SA210A1 |
Brand Name | Saneco |
Certification | ASME, EN, GB, ISO |
Place of Origin | China |
View Detail Information
Explore similar products
Heat Recovery Feed Water Boiler Economizer Coils SA210M A1 Steel
High Strength Spiral Type Boiler Fin Tube Resistant Corrosion For Economizer
SA210A1 Tubes Boiler Economizer With Manifolds Header For Coal Fired Power Plant
Waste Heat Recovery H Fin Tube High Frequency Welding Industrial Boiler
Product Specification
Delivery Time | 80~120 days | Packaging Details | Steel frame |
Porduct Name | Boiler Economizer Bank | Standard | ASME, EN, GB |
Fuels Of Boiler | Coal, Biomass, Gas | Material | SA210A1 |
Brand Name | Saneco | Certification | ASME, EN, GB, ISO |
Place of Origin | China | ||
High Light | SA210A1 Boiler Economizer ,Waste Incinerator Boiler Economizer ,Waste Incinerator economiser tubes |
ASME Standard Boiler Economizer Made of SA210A1 Tubes with 210° Shields for Waste Incinerator
Product Introdution
Economizer tube is an important part of boiler, which is mainly made of seamless steel tube by bending or folding.
Cast iron economizer consists of a series of horizontal cast iron pipes connected to each other with cast iron elbows and flanged ends.
Parameters of Boiler Economizer
Description | Boiler economizer |
Material | Alloy steel, Carbon steel, SA210C ,SA213T22, etc. |
Material standard | ASTM, EN or ISO etc. |
Dimension | Customization |
Weight | Min: 10 ton Max.:1000 ton |
Process | Material→Tube Bending and Bevelling → Butt Welding→ Shield Manufacturing → Assembly 1 →RT→Handcuffs and Shields Welding→Assembly 2 →Hydro Test →Cleaning and Painting →Packing into Frames |
Working Process of Boiler Economizer
There are three stages from the feed water in the boiler heated into superheated steam:feed water preheating, evaporation, and superheating. The three stages are finished on three different heating surfaces. The boiler steam and water circuit are composed of the three different heating surfaces as well as their connecting pipes. Boiler economizers are one of them, and it is right the equipment to preheat the feed water. Thus, it is the heating surface with the lowest temperature for boiler working fluid in the boiler steam and water circuit. The working fluid passing through this equipment is monophasic water(non-boiling economizer).
Company Profile
The products of our company have been widely used in major power plants of various provinces and cities in China, bringing stable and significant economic and social benefits to cooperated power plants. At the same time, we attach great importance to product development and strive to improve product quality. Through the cooperation with a number of domestic and foreign companies, we constantly explore the international market.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2024
Total Annual:
1000-2000
Employee Number:
200~300
Ecer Certification:
Verified Supplier
SuZhou Saneco boiler co.ltd is a high-tech enterprise specialized in producing of boiler spare parts, such as fin tubes, economizers, super-heater and re-heater, boiler water wall panels, boiler manifold headers, and boiler steam drums for industrial boilers. Company also provide turnkey servic... SuZhou Saneco boiler co.ltd is a high-tech enterprise specialized in producing of boiler spare parts, such as fin tubes, economizers, super-heater and re-heater, boiler water wall panels, boiler manifold headers, and boiler steam drums for industrial boilers. Company also provide turnkey servic...
Get in touch with us
Leave a Message, we will call you back quickly!