Supply Ability | 50 sets per month |
Delivery Time | 10-15days |
Packaging Details | wooden case and film packed |
Model | ACM500 600 700 800 1000 |
Total Power | 42-130KW |
Weight | 1.6-3.6MT |
Production Capacity | 100-900kgs/hr |
Knife Cooling | Wind or recycling water |
Voltage | 380V 50HZ or customized |
Color | Usually white,orange,blue and red |
Warranty | 1 year |
Packing | Seaworthy package in wood case and film wrapped |
Application | Plastic PVC scrap |
Anti-dust | YES |
Miller Style | Rotary Trubo |
Sieve Mesh | Adjustable |
Brand Name | ACEMIEN |
Model Number | ACMPVCP02 |
Certification | CE |
Place of Origin | P.R.China |
View Detail Information
Explore similar products
Powder Plastic Auxiliary Machine High Speed Heating Cooling Drying Mixer
Plastic PVC High Speed Mixer Machine , Plastic Mixer Machine Full Automatic
Automatic Plastics PVC Mixer Machine , PP PE Vertical Mixing Unit Industrial
High Speed Plastic Auxiliary Machine PVC Turbo Mixer PVC Compounding Durable
Product Specification
Supply Ability | 50 sets per month | Delivery Time | 10-15days |
Packaging Details | wooden case and film packed | Model | ACM500 600 700 800 1000 |
Total Power | 42-130KW | Weight | 1.6-3.6MT |
Production Capacity | 100-900kgs/hr | Knife Cooling | Wind or recycling water |
Voltage | 380V 50HZ or customized | Color | Usually white,orange,blue and red |
Warranty | 1 year | Packing | Seaworthy package in wood case and film wrapped |
Application | Plastic PVC scrap | Anti-dust | YES |
Miller Style | Rotary Trubo | Sieve Mesh | Adjustable |
Brand Name | ACEMIEN | Model Number | ACMPVCP02 |
Certification | CE | Place of Origin | P.R.China |
High Light | PVC Scrap Pulverizer Mill ,130KW Pulverizer Mill ,Turbo PVC Plastic Miller |
Application and features of the turbo PVC plastic miller
The PVC miller is used mainly for the recycle of heat sensitive plastic into powder, such as waste of PVC pipes,profiles and sheet during production,
and it also has advantages below:
1,Energy saving and high efficiency.
2,Equipped with dust device, have no dust pollution.
3,Discharging valve to set free labor force.
4,Host machine can be opened to carry out repair and replacement for sparepart.
5,Both air cooling and recycling water cooling applied for preventing the milled powder from overheat to cause change of chemical nature of PVC powder.
6,Adjustable Mesh 20-100 for powder control.
Technical data of miller machine
Model | Mian Motor Power(KW) | Blower Power(KW) | Sieve Motor(KW) | Production Capacity(kgs/hr) | Dimension(mm*mm*mm) | Weight(Kgs) |
ACM500 | 37-45 | 3 | 0.55 | 100-300 | 3500*1300*3700 | 1600 |
ACM600 | 45-55 | 5.5 | 0.75 | 200-500 | 3700*1450*3700 | 1800 |
ACM700 | 55-75 | 7.5 | 0.75 | 250-600 | 4100*1600*3800 | 2000 |
ACM800 | 75-90 | 7.5 | 0.75 | 300-700 | 4300*1700*4000 | 3200 |
ACM1000 | 90-110 | 11 | 1.1 | 400-900 | 5000*2000*4300 | 3600 |
After sales service and policy
1 Technical documents
All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.
2. Arrangement for inspection, installation and testing work
a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc.
b. ACEMIEN will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.
c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 per day for each engineer.
d. Engineer will give free training lessons to labors in buyer's factory.
e. If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.
3. Quantity and quality guarantee
a. Quantity/Quality Discrepancy to destination port during transportation:
In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.
b. Guarantee period and after-sales services: 12 months since date of bill of lading
During this guarantee period, ACEMIEN will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, ACEMIEN will provide the buyer spare parts at cost price.
c. Long-term service:
ACEMIEN will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
Company Details
Business Type:
Manufacturer,Exporter,Trading Company,Seller
Year Established:
2013
Total Annual:
8,850,000-118,00,000
Employee Number:
50~100
Ecer Certification:
Active Member
JiangSu Acemien Machinery Co., Ltd. is a brand production enterprise which is the first batch of PVC roofing building materials equipment, PP hollow construction formwork production line in China, which focuses on plastic extrusion equipment and plastic recycling equipment. The company has gathered ... JiangSu Acemien Machinery Co., Ltd. is a brand production enterprise which is the first batch of PVC roofing building materials equipment, PP hollow construction formwork production line in China, which focuses on plastic extrusion equipment and plastic recycling equipment. The company has gathered ...
Get in touch with us
Leave a Message, we will call you back quickly!