Payment Terms | T/T, Western Union, T/T, L/C |
Supply Ability | 5000 set/month |
Delivery Time | 20-30 days |
Packaging Details | carton |
Material | Steel |
Engine | 4NC2A |
Application | Truck, Bus |
Type | Heavy Duty |
OE Replacement | OE standard quality |
Product Name | Rocker Arm Shaft Assembly |
Brand Name | Jinlong |
Certification | IAFT16949 |
Place of Origin | Zhejiang,China |
View Detail Information
Explore similar products
MAN Rocker Arm Shaft D20 D26 Steel Forged 11-13L Engine Rocker Shaft
5-73L Rocker Arm Shaft Valve Rocker Arm Rockshaft MAN D08 Steel Forged 51.04203
Heavy Duty Shaft Mounted Rocker Arm Bracket Assembly 485 490 Steel Forged
X6110 Rocker Arm Assembly Steel Forged IAFT16949 Rocker Arm Assy
Product Specification
Payment Terms | T/T, Western Union, T/T, L/C | Supply Ability | 5000 set/month |
Delivery Time | 20-30 days | Packaging Details | carton |
Material | Steel | Engine | 4NC2A |
Application | Truck, Bus | Type | Heavy Duty |
OE Replacement | OE standard quality | Product Name | Rocker Arm Shaft Assembly |
Brand Name | Jinlong | Certification | IAFT16949 |
Place of Origin | Zhejiang,China | ||
High Light | Shaft Mounted Rocker Arm Shaft ,Rocker Arm Shaft 4NC2A ,Rocker Arm Bracket Steel Forged |
Truck Bus Heavy-Duty Shaft Mounted Rocker Arm Bracket Assembly Engine:4NC2A Steel Forged
Rocker arms contribute to the reciprocating weight of the valvetrain, which can become problematic at higher engine speeds (RPM). For this reason, aluminum is often in engines that operate at higher RPM. Upgraded bearings for the rocker arm's fulcrum are also sometimes used in engines operating at high RPM.
Compatible Vehicle:
Engine:4NC2A
Material: | Steel |
Application: | Truck, Bus |
OE Replacement: | OE Standard Quality |
Engine: | 4NC2A |
Type: | Heavy Duty |
Product Name: | Rocker Arm Shaft Assembly |
FAQ
Q1. What's quality of the goods you can provide?
A: Genuine parts from the original factory directly; OEM parts from the OEM factory, and aftermarket with high quality from reliable factory.
Q2. Can you accept sample orders?
A: Yes, our MOQ can be 1PC(SET).
Q3.What's your packing?
A: We usually pack our goods in cartons with our own brand attched or in neutral white boxes and brown cartons. Customized brand packing boxes(cartons) are acceptable upon your requirements.
Q4. How long is the delivery time?
A: Generally, we have stocks for most engine parts. And it will take 15 to 30 days for some engine assembly and parts. The specific delivery time depends on the items and the quantity of your order.
Q5. What’s your guarantee policy?
A: We provide 18 months’ warranty for our products, 6 months longer than the original manufacturer.
Company Details
Business Type:
Manufacturer
Employee Number:
>100
Ecer Certification:
Verified Supplier
Yuhuan Jinlong Machinery Co., Ltd. is a member of China Internal Combustion Engine Association. It is a professional manufacturer of rocker arm assembly, water pump assembly, axle housing shift fork assembly, support shaft, rollers, high-strength bolts, rear axle housing bearing locking Caps and oth... Yuhuan Jinlong Machinery Co., Ltd. is a member of China Internal Combustion Engine Association. It is a professional manufacturer of rocker arm assembly, water pump assembly, axle housing shift fork assembly, support shaft, rollers, high-strength bolts, rear axle housing bearing locking Caps and oth...
Get in touch with us
Leave a Message, we will call you back quickly!