Supply Ability | Based on the detailed quotation |
Packaging Details | Wooden cases standard export package |
Delivery Time | 10-20 days working days |
Payment Terms | T/T, L/C, T/T, Western Union |
usage | water well |
chassis | 8-tyre trailer |
drilling tech | turnplate rotary |
mud pump | 850L/min, 20mpa |
drill tower | 11.6m height |
drill rod | 6.5m per piece |
power | 65kw diesel |
hoist | 2 sets |
max drill depth | 300m |
hole diameter | 450mm |
Brand Name | OEM |
Model Number | |
Certification | ISO,CE |
Place of Origin | CHINA |
View Detail Information
Explore similar products
KW20 Hydraulic Truck Mounted Water Well Drilling Rig
120m Diesel Power Hydraulic Crawler Drilling Machine
Track Type ZGSJ-200 200m Water Well Drilling Machine
200m Diesel Power Portable Hydraulic Water Well Drilling Rig
Product Specification
Supply Ability | Based on the detailed quotation | Packaging Details | Wooden cases standard export package |
Delivery Time | 10-20 days working days | Payment Terms | T/T, L/C, T/T, Western Union |
usage | water well | chassis | 8-tyre trailer |
drilling tech | turnplate rotary | mud pump | 850L/min, 20mpa |
drill tower | 11.6m height | drill rod | 6.5m per piece |
power | 65kw diesel | hoist | 2 sets |
max drill depth | 300m | hole diameter | 450mm |
Brand Name | OEM | Model Number | |
Certification | ISO,CE | Place of Origin | CHINA |
High Light | SPJT300 Rotary Well Drilling Rig ,Rotary Water Well Drilling Rig |
8 Tyre Trailer SPJT300 Rotary Water Well Drilling Rig
SPJT300 Water Well Drilling Rig is installed on a trailer . This drilling rig can work through rotary mud circulation or DTH drilling technique. SPjT300 trailer chassis water well drilling rig is suitable for clay, sand, graveland pebble, and rock stratum. We add special device to add & reduce pressure during drilling which can enhance efficiency a lot. High hydraulic leg and hydraulic tower are chosen to save labor and keep safety during working.
◎ when drilling, the drilling rig uses an independent diesel engine as power, and uses mechanical transmission to make the mechanical winch and rotary table work at the same time;
◎ the drilling rig is equipped with four hydraulic support legs, which can move at the same time as well as independently, facilitating quick leveling of the drilling rig. Moreover, the two rear legs can extend horizontally, thus improving the stability of the whole drilling rig. Using hydraulic cylinders to lift the tower is convenient, reliable and simple to use, which can meet the construction requirements of different working conditions to the greatest extent.
◎ the main parts of the drilling rig, such as winch, turntable, gearbox, tower and chassis, are produced by our factory independently, with stable and reliable performance.
◎ the drilling rig is suitable for drilling high-rise buildings, bridges, geological mines, ports, dam foundations, water well construction, complicated ground source heat pump, etc.
◎ the drilling rig is simple to operate, has strong usability, convenient maintenance, less investment and quick effect, and is the best product for users.
MAIN PATAMETER
drilling hole diameter | 500mm | drill tower rated load | 180KN |
depth | 300m |
drill tower height |
11.6m(SPJT300) |
turnplate max. torque | 8.0KN/m | dimension | 12m×2.47m×3.4m |
speed | clockwise(reverse)44,77,139rpm | power | 80hp |
turnplate diameter | 450mm | transportation status |
in bulk/trailer |
lifting capacity of single rope of main hoist | 30KN | weight of main rig | 13.5t(SPJT300) |
lifting capacity of single rope of secondary hoist | 20KN |
weight of drill rod, pipe &bit | 6.6t |
Mud pump | BW850/20 (20Mpa pressure/850L/min) |
Configure of one set of spjt300
no | code | name | quantity | remark |
A | main rig | 1 group | ||
1 | 1C-0 | turnplate | 1group | |
2 | 2-0 | hoist | 1group |
Advanced gearbox and clutch |
3 | 3B-0 | transmission | 1group | Model 4135Na |
4 | FT0-0 | drill tower | 1set | |
5 | BW850/20 | mud pump | 1set | including all tools and hose |
6 | accessories | 1 set | (steel wire 80m plus 120m, protecting-cover etc.) | |
B | tools | |||
1 | FG1-0 | water tap | 1 piece | |
2 | FG2-0 | block group | 1piece | |
3 | FG3B-0/8000 | kelly rod | 1piece | L=7650mm |
4 | FG5-0 | lifter | 1piece | |
5 | FG7-4 | joint | 1piece | |
6 | FG8-0 | fork | 1piece | |
7 | FG9A-0 | fork | 1piece | |
8 | 2-6A-0 | shaft | 1piece | |
9 | 21/2" | hose | 1piece | |
10 | FG12-4/6500/R780 | drill rod 89*10*6500mm | 43 pieces | Material:R780 |
11 | FG7-1/2 | joint | 43pairs |
Mud pump Type |
| |
Cylinder diameter | 150(mm)
| |
Stroke | 180(mm) | |
Pump speed | 82 r/min | 58r/min |
Flow | 850(L/min) | 600(L/min) |
Pressure | 2.0(MPa) | 3.0(MPa) |
Power | 37(Kw) | |
shape size | 2000*1030*1400(mm) | |
Weight | 1500(kg) |
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Agent,Importer,Exporter
Year Established:
2009
Employee Number:
400~500
Ecer Certification:
Verified Supplier
Beijing Silk Road Enterprise Management Services Co.,LTD located in Beijing,China, for more than 10 years we have specilized in research, development and produce of rock blasting drilling rig, water well drilling rig, diamond core drilling rig, anchor drilling rig, and relative accessories & dri... Beijing Silk Road Enterprise Management Services Co.,LTD located in Beijing,China, for more than 10 years we have specilized in research, development and produce of rock blasting drilling rig, water well drilling rig, diamond core drilling rig, anchor drilling rig, and relative accessories & dri...
Get in touch with us
Leave a Message, we will call you back quickly!