Payment Terms | L/C, T/T, Western Union, MoneyGram |
Supply Ability | 20 tons per week |
Delivery Time | 1- 3 weeks |
Packaging Details | White PE bag,N.W.10kg/bag. 1000kg/pallet. |
Main | modified asphalt |
Color | black |
Type | thermoplatic |
Apperarance | Granules |
Operation Melt temperature | 280°C |
Curing Time | 5-8 minutes |
Brand Name | Wage |
Model Number | HG TP |
Certification | EMS, OHSMS |
Place of Origin | China |
View Detail Information
Explore similar products
Driveway Sealing And Crack Repair Modified Asphalt Filling Potholes
Filling Potholes Melt Mix Asphalt Patch Material For Reticular Crack Repairing
Melt Mix Asphalt Patch Material Asphalt Pothole Patch For Pothole
Driveway Asphalt Pothole Patch Filler Granules For Road Crack
Product Specification
Payment Terms | L/C, T/T, Western Union, MoneyGram | Supply Ability | 20 tons per week |
Delivery Time | 1- 3 weeks | Packaging Details | White PE bag,N.W.10kg/bag. 1000kg/pallet. |
Main | modified asphalt | Color | black |
Type | thermoplatic | Apperarance | Granules |
Operation Melt temperature | 280°C | Curing Time | 5-8 minutes |
Brand Name | Wage | Model Number | HG TP |
Certification | EMS, OHSMS | Place of Origin | China |
High Light | Modified Asphalt Patch Material ,asphalt patch For Road Crack Repairing ,Road Crack Repairing asphalt patch |
Asphalt Road Patching Material For Road Crack Repairing
Thermoplastic asphalt road repare patching material
General Description
This material is an elastic repair material, composed of modified asphalt, chalk powder, polymer materials, quartz sand, rubber powder, and other materials mixed with special additives.
Special for hot-applied, aggregate-flled, polymer-modifed asphalt pavement repair mastic, used for repairing distresses in asphalt .
Product Specifications
Item | Range |
Apperarance | Granules |
Color | Black |
Operation Melt temperature | 280°C |
Curing Time | 5-8 minutes |
Application:
* Filling wide cracks and joints
* Filling potholes
* Road reticular crack repairing
* Pretreatment of fatigue cracked are prior to surface maintenance
* Repairing and Leveling manhole covers
* Leveling bridge deck approaches
* Repairing deteriorated longitudinal joints such as tramcar
* Filling spalls, popouts,and breaks, etc
Packaging
White PE bag,N.W.10kg/bag.
1000kg/pallet. 1.2*1.0*1.0M size for pallet
Storage
The product can be stably stored for at least one year when kept in a dry place at temperature below 30°C.Avoid exposure to direct sunlight.
Using step
1.Clean the moisture and dust in the area to ensure they are dry and clean
2.Use a thermoplastic boiler to heat the elastic asphalt patching material to 280 ℃
3.Choose different widths of coating scoop based on the size of crack or other damage
Caution
When the material is melt will keep a high tempreture on itself and machine or tools, pls mind the scald
Contact
Company Details
Business Type:
Manufacturer
Year Established:
2010
Total Annual:
1000000-5000000
Employee Number:
50~80
Ecer Certification:
Verified Supplier
We cherish and maintain the enterprise management principle of high standard and sophistication and the quality concept of quality enhancement for value increment. With the guidance of the users’ product quality and economic benefits as the quality policy, we strive for the quality objective o... We cherish and maintain the enterprise management principle of high standard and sophistication and the quality concept of quality enhancement for value increment. With the guidance of the users’ product quality and economic benefits as the quality policy, we strive for the quality objective o...
Get in touch with us
Leave a Message, we will call you back quickly!