China factories

China factory - Guangzhou Chunke Environmental Technology Co., Ltd.

Guangzhou Chunke Environmental Technology Co., Ltd.

  • China,Guangzhou ,Guangdong
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China 5m3/h Customize Vertical SUS304 Water Sterile Storage Tank in Food & Beverage
China 5m3/h Customize Vertical SUS304 Water Sterile Storage Tank in Food & Beverage

  1. China 5m3/h Customize Vertical SUS304 Water Sterile Storage Tank in Food & Beverage
  2. China 5m3/h Customize Vertical SUS304 Water Sterile Storage Tank in Food & Beverage
  3. China 5m3/h Customize Vertical SUS304 Water Sterile Storage Tank in Food & Beverage

5m3/h Customize Vertical SUS304 Water Sterile Storage Tank in Food & Beverage

  1. MOQ: 1 unit
  2. Price: Negotiate
  3. Get Latest Price
Payment Terms Paypal, L/C, T/T, Western Union, MoneyGram
Supply Ability 50 units per month
Delivery Time 7-15days
Packaging Details Wooden box
Panel thickness 2-5mm
working pressure 10bar-20bar
Panel size 1*1m,0.5*0.5m,1.22*1.22m
Installation guide Installation vedio or technician on site
Working life more than 25 years
After-sales Service Provided Online support
Brand Name CHUNKE
Model Number CK-5m3
Certification CE,ISO
Place of Origin CHINA

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms Paypal, L/C, T/T, Western Union, MoneyGram Supply Ability 50 units per month
Delivery Time 7-15days Packaging Details Wooden box
Panel thickness 2-5mm working pressure 10bar-20bar
Panel size 1*1m,0.5*0.5m,1.22*1.22m Installation guide Installation vedio or technician on site
Working life more than 25 years After-sales Service Provided Online support
Brand Name CHUNKE Model Number CK-5m3
Certification CE,ISO Place of Origin CHINA
High Light reverse osmosis water storage tankhot water storage tank

5m3/h Customize Vertical SUS304 Water Sterile Storage Tank in Food & Beverage Factory

 

 

The structure of sterile tank structure:

 

1 This series of containers has heating and heat preservation functions, designed, manufactured, tested and accepted according to GB150-89<<Steel Pressure Vessel Technical Conditions>>.
2 the volume has a specification of 100L-10000L, and can also be designed and processed according to the actual needs of customers.
3 The container insulation material is made of high temperature resistant and anti-aging integral pearl cotton insulation.
4 The interface is an international standard quick-loading chuck type. The inner tank is made of imported 316L or 304. The surface is polished by Ra≤0.28 m. The outer surface is polished with matt, mirror, sandblasted or cold-rolled primary color matt.
5 The tank has a liquid level gauge, air breathing port, thermometer, inlet and outlet, circulation pump interface, manhole, CIP cleaning ball, sight glass, light.

 

 

Sterile tank technical operation Process:

 

1, Steam sterilization of tanks and valve blocks

 

All tanks and tubing in contact with the sterile product were steam sterilized with a steam temperature of 140 ° C and a pressure of 0.27 MPa through two 25 μm steam grade filters. When the tank temperature rises to 115 ° C and the tank temperature is 140 ° C, sterilization can begin for 2400 s.

 

2, Cooling of tanks and valve blocks

 

After the tank is steam sterilized, the cooling water is automatically sprayed by the spray pipe in the jacket, and the temperature of the tank is lowered, and the pressure inside the tank is lowered. In order to prevent the pressure from falling too fast, the pressure sensor at the bottom of the tank opens the solenoid valve and the regulating valve to pass the sterile air into the tank to maintain the pressure balance of the tank. The cooling time is 900s.

 

3, Filling

During the process of filling and discharging materials, the degassing sterile air enters the upper part of the tank through two 0.22μm air filters and pressure regulating valves, so that the pressure at the bottom of the tank is always constant, thus ensuring filling The machine is stably supplied. At the same time, 0.1 MPa of steam is passed through the steam line connected to the material pipe and the aseptic valve to form a sterile barrier to ensure the sterility of the filling process.

 

4, CIP cleaning

 

The CIP cleaning pipeline is provided with two paths: after the production is stopped, the operator issues a cleaning command, the pipeline is connected to the CIP cleaning fluid, and the ball is cleaned by the rotating cleaning ball at the top of the pipe, and the tank and the pipeline are cleaned; An organically connected sterile valve cleans the filler and tubing. Since the inner wall of the tank body and the pipeline are highly smooth and have no dead angle, the bacteria cannot stay, thereby ensuring the sterility of the pipeline.

Firstly, the lye solution with a concentration of 1% and a temperature of 70 ° C was washed for 5 minutes on the inner wall of the tank; then the tank was rinsed with cold water for 10 minutes. If there is scale on the inner wall of the tank, it should be cleaned with 1% acid solution for 20 minutes, then rinsed with water to discharge all the liquid.

 

5, Process control

 

The entire production process is automatically controlled by the PLC according to the process requirements.

 

 

Photo show tank detail 

 

 

 

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2009

  • Total Annual:

    50000000-10000000

  • Employee Number:

    200~500

  • Ecer Certification:

    Active Member

Guangzhou Chunke Environmental Technology Co., Ltd. was established in 2009 is located in Guangzhou Baiyun District Junhe Street, near Guangzhou Baiyun International Airport, an independent mechanical processing, production, commissioning, testing, packaging workshop and spacious office building, th... Guangzhou Chunke Environmental Technology Co., Ltd. was established in 2009 is located in Guangzhou Baiyun District Junhe Street, near Guangzhou Baiyun International Airport, an independent mechanical processing, production, commissioning, testing, packaging workshop and spacious office building, th...

+ Read More

Get in touch with us

  • Reach Us
  • Guangzhou Chunke Environmental Technology Co., Ltd.
  • 8 Suyuanzhuang, Junhe Street, Baiyun District, Guangzhou, China
  • https://www.zd_ro-waterplant.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement