Payment Terms | L/C, T/T |
Delivery Time | 5-15 work day |
Grass high | 4~12cm |
Size | 25*25cm,50*50cm,40*60cm |
Material | plastic |
Density | 308 grass |
Color | green/yellow |
Delivery time | 3-10 Days |
Brand Name | PALM TREE |
Place of Origin | HeBei China |
View Detail Information
Explore similar products
UV Resistant Office Background Artificial Green Grass Mat
4cm 308 Grass High Density Decoration Wall Grass Mat
2.5 cm Simulated Green Lawn
Sports Simulated Green Lawn
Product Specification
Payment Terms | L/C, T/T | Delivery Time | 5-15 work day |
Grass high | 4~12cm | Size | 25*25cm,50*50cm,40*60cm |
Material | plastic | Density | 308 grass |
Color | green/yellow | Delivery time | 3-10 Days |
Brand Name | PALM TREE | Place of Origin | HeBei China |
High Light | Recyclable artificial grass carpet mat ,Encryption Plastic Turf Grass Mat ,308 Grass Plastic Turf Grass Mat |
Simulation Plant Wall Background Wall Encryption Plastic Lawn Wall Plastic Lawn Door Head Shop Sign Decoration
Simulation Artificial Grass
1. With soft and comfortable feeling and natural color of real grass;
2. All the products have been through strict production process, ensuring outdoor use for more than 5 years;
3. Great weather adaptability, uv-cut and anti colorfading, surviving weather like raining, fog, etc;
4. No need for fertilizing and trimming, all of which make the maintenance cost less than 5% of real grass;
5. Could be recycled, piled up and burned like most waste materials;
6. Could be used for indoor and outdoor, on rooftop, on both sides of streets, in swimming pool, in recreational facilities, and in pet zone;
Grass high | 4~12cm |
Size | 25*25cm,50*50cm,40*60cm |
Material | plastic |
Density | 308 grass |
Color | green/yellow |
Delivery time | 3-10 Days |
OurService
Top quality
| as a result of specialization and standardization! In production, full automatic lines have been applied. |
Customized Service
| We provide professional customized service, namely, we are capable of providing the specific product you want, no matter for logo, material, size, color, etc. |
After-sales Service
| Our enthusiastic and friendly customer service representatives are ready to assist with any questions or problems. |
How to install the Simulated Green Lawn:
1.1. Inspection:
Inspect the foundation to ensure it has a flat and smooth surface and appropriate slopes,making sure the foundation is qualified for installing artificial turf;
1.2. Measuring:
Locate the centers of the ground and the two semicircles, and according to these three centers locate the intersecting point of half-way lines and touchlines, and then determine the positions of functional lines and spot by using Pythagorean proposition;
2. Turf layout:
According to drawing, position the turf rolls on the exact places along the touchline.The turf with white lines should be placed at the half-way lines and base line, and then lay out the rolls in order;
3. Preparing functional line:
Cut white turf piece into strips(width to be as per actual need) for white functional lines(half-way lines, base lines etc.), and put them aside preparing for Green Artificial Grass Carpet installation;
4. Seaming:
The adiacent turf rolls must be join together with 20~30mm excess on both sides, then cut the excess part with a special cutting knife on the joint center and trim the cut to make the turf join perfectly together. After trimming, place the seam tape on the foundation surface and make the joint line of turf right on the middle of the seam tape. And then apply the adhesive to seam tape evenly with a rubber spreader, and press down the turf on both sides of the seam tape firmly;
5.1. Installing functional lines:
Measure and re-position the functional line on the turf that has been all well joined on the ground. Cut the turf out and place the seam tape beneath the cuts, then spread the adhesive on the seam tape and install the well-prepared functional lines, press it firmly to ensure the immobility.
5.2. Trimming:
Inspect the finished lawn, if any uneven found, cut it open, pull it straight and cut the excess away.And rejoin it with adhesive;
6. Infilling sand:
Place the sand piles on the finished lawn on different spots evenly at a distance of 4m from each other,then spread them evenly on the lawn(the quantity if sand depends on the pile height of the turf).
Afterwards, use the combing machine to sweep the sand into the fibers and to comb uo the fibers. Do this process once longitudinally and transversely.
7. Infill rubber granules:
After sand infilling, Place the rubber granules piles on the lawn on different spots evenly at a distance of 4m from each other, then spread them evenly on the lawn(the quantity of sand depends on the pile height of the turf). Afterwards, use the combing machine to sweep the sand into the fibers and to comb up the fibers. Do this process once longitudinally and transversely.
8. Combing:
Once the infilling is finished, comb the turf once more with the combing machie to make the fibers point up to the sky.
9. Inspection:
Inspect the entire finished lawn as per concerned standards and requirement.If any defects found,correct it.
Company Details
Business Type:
Manufacturer,Seller
Year Established:
2020
Employee Number:
100~150
Ecer Certification:
Active Member
LANGFANG PALM TREE ART AND CRAFTS CO., LTD. is located in Xinglonggong Industrial Zone, Wen'an County, Langfang City, Hebei Province. It is located in the hinterland of Tianjin, Beijing and Hebei, less than 1 km from the Xiong'an New District. The co... LANGFANG PALM TREE ART AND CRAFTS CO., LTD. is located in Xinglonggong Industrial Zone, Wen'an County, Langfang City, Hebei Province. It is located in the hinterland of Tianjin, Beijing and Hebei, less than 1 km from the Xiong'an New District. The co...
Get in touch with us
Leave a Message, we will call you back quickly!