Payment Terms | L/C, T/T |
Supply Ability | 50000 pcs per month |
Delivery Time | Ngotiable |
Packaging Details | Export packaging |
Product Name | Railway Brake Valve JZ-7 Parts |
Ambient temperature | -40℃~50℃ |
Package | Export package |
Constant pressure of train pipe | 500kPa, 600kpa |
Application | Railway diesel locomotive |
Brand | Hengtairail |
View Detail Information
Explore similar products
Right cast iron angle cock for railway with UIC standard
Left cast iron angle cock for railway with UIC standard
Train angle cock cut off angle cock G1 angle cock
Passenger car coach cut off cock interface dimensions G1 1/4
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 50000 pcs per month |
Delivery Time | Ngotiable | Packaging Details | Export packaging |
Product Name | Railway Brake Valve JZ-7 Parts | Ambient temperature | -40℃~50℃ |
Package | Export package | Constant pressure of train pipe | 500kPa, 600kpa |
Application | Railway diesel locomotive | Brand | Hengtairail |
High Light | Railway Diesel Locomotive Brake Valve ,Locomotive Brake Valve 600kpa ,train brake valve 600kpa |
Railway Diesel Locomotive Brake Valve JZ-7 Parts
JZ-7 Brake valve may be used not only on passenger locomotives but also on freight locomotives.
It has the ability to gradually release at passenger locomotive, and directly release at freight locomotive.
JZ-7 mainly consists of automatic brake valve (large brake), separate brake valve (small brake), relay valve, distribution valve, application valve ect.
Product Name | Railway Brake Valve JZ-7 Parts |
Ambient temperature | -40℃~50℃ |
Package | Export package |
Constant pressure of train pipe | 500kPa, 600kpa |
Application | Railway diesel locomotive |
Performance:
1. Time for initial charge of pressure reservoir of distributing valve from 0 to 460 kPa : 50~60s
2. Local reduction should take effect before brake pipe of the single locomotive reduces pressure to 20 kPa. At the same time, the main valve acts: starting local reduction and brake cylinder lifting pressure
3. Graduated release times after in full service application: not less than 5 times (at the passenger train position)
4. Time for pressure reduction in equalizing reservoir in service application from 500KPa to 360KPa (S): 5~7
5. Max. brake cylinder pressure in full service application (KPa): 340-360
Performance of independent braking:
Highest brake cylinder pressure in full application position (KPa): 300
1. Time for build-up of brake cylinder pressure from 0 to 280KPa (S): within 3s In running position,
2. time for reduction of brake cylinder pressure from 300Kpa to 35Kpa (S): within 4s
About Us:
Hengtairail Equipment Co.,Ltd (hereinafter referred to as “Hengtairail”) was established by Mr. Wei, in 1999. He had worked as a vehicle engineer in the China Railway Administration. Professional engineer team and high efficiency sales team have had been built at present.
Hengtairail is certified and operating to ISO9001:2015 management system. Products meet technical requirements China Railway Test & Certification Centre (CRCC), Association of American Railroads (AAR), International Union of Railways (UIC) etc.
Hengtairail is a global supplier of rail vehicle components & system. Including casting, forging, machining products.
Application
Related products
1. MUD distributor valve
2. Brake cylinder
3. RGC-1A Sensor Valve
4. Auxiliary reservoir
5. Air brake hose assembly
6. Throttle
7. Slack Adjuster
8. Caboose Valve
9. Angle cock
Company Details
Business Type:
Distributor/Wholesaler,Exporter,Trading Company
Year Established:
1999
Total Annual:
$5million-$10million
Employee Number:
50~100
Ecer Certification:
Verified Supplier
Hengtairail Equipment Co., Ltd (hereinafter referred to as “Hengtairail”) was established by Mr. Wei, in 1999. He was as a vehicle engineer in the China Railway Chengdu Bureau. A professional engineer team and high-efficiency sales team have been built at present. Hengt... Hengtairail Equipment Co., Ltd (hereinafter referred to as “Hengtairail”) was established by Mr. Wei, in 1999. He was as a vehicle engineer in the China Railway Chengdu Bureau. A professional engineer team and high-efficiency sales team have been built at present. Hengt...
Get in touch with us
Leave a Message, we will call you back quickly!