Payment Terms | L/C, T/T |
Supply Ability | 10sets/month |
Delivery Time | 60days |
Packaging Details | wooden case with safty packing material |
Voltage, power | 220V/50Hz,2.5kw |
Fin & tube collocating time | 1 second per collocation |
conditions | NEW |
core assembling speed | around 60 cores per hour |
Applicable core | radiator core, condenser core |
Core Components | PLC, Motor |
Brand Name | Sunhope |
Place of Origin | Guangdong,china |
View Detail Information
Explore similar products
Semi-automatic Core Builder Machine
High Efficiency 8mm Fin Height 180m/Min Radiator Core Builder , Core Assembly
Stable Performance PLC Radiator Core Builder Machine 0.6MPa
900*900mm Workstation 0.8Mpa Core Assembly Machine Multirow
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 10sets/month |
Delivery Time | 60days | Packaging Details | wooden case with safty packing material |
Voltage, power | 220V/50Hz,2.5kw | Fin & tube collocating time | 1 second per collocation |
conditions | NEW | core assembling speed | around 60 cores per hour |
Applicable core | radiator core, condenser core | Core Components | PLC, Motor |
Brand Name | Sunhope | Place of Origin | Guangdong,china |
High Light | OEM Production core assembly machine ,PLC core assembly machine ,220V core builder machine |
High Speed Radiator Core Builder for OEM production
Produt specifications:
Voltage, power | 220V/50Hz,2.5kw | design style | can customise |
running speed | adjustable | Driving mode | Pneumatics |
production efficiency | 60sec. | Number of cylinders | 6--8 |
Number of preset models | Non. | Core size | 900*900*56mm |
Programmable | Non. | Workstation | 1 |
shape | unregular | Maximum size of head plate | 120mm |
after-sale service | yes | Machine weight | 800kg |
brand name | SUNHOPE | warranty | 12 months |
Safety device | radiator core builder is equipped with photoelectric light curtain to protect the safety of the operator | Efficiency | About 1Minutes One Core |
Air pressure requirements | 0.8Mpa | mould | can customise |
Product features:
1. can suitable to different types of tube
2. can adapt to different size of cores
3. It has a fews types of core builder,for example condenser core builder machine,intercooler core builder machine,heater aluminium core assembling machine and water tank core machine.
Product advantages:
1) The flat tubes are stocked in a tube magazine, and are distributed through a servo tube distribution device. The overall comb teeth structure could ensure the flat tube positioning accuracy.
2) The radiator core builder is designed with 2-hand push buttons for safety operation.
3) The radiator core builder is easy for operation, adjustment, and tooling replacement.
4) The left and right push mechanism, and clamping mechanism are controlled by the hydraulic cylinders.
5) The flat tubes are distributed through a servo tube distribution device.
6) The radiator core assembly machine can be equipped with the header flaring mechanism
About us:
With the development of heat exchange industry, more and more countries and regions are committed to building local radiator condenser plants. With our understanding of the industry, we have been helping foreign customers to set up radiator factories and provide the production machine in the region in the past five years. We provide customers with pre-sale and after-sale equipment design and service according to the size of our products.In the meantime we will also provide the material to our customers as well. We will send technicians to guide the installation on site to ensure the smooth production of the customer's factory, and provide free consultation service in case of any doubt in the production process.
In recent years,many companies from other countries in the same industry also bought the CKD from us and purchased the machine equipment from us as well.
If you are interested in setting up a radiator factory in your place or buying any products , please contact us and we will provide you with the best service and best price.
FAQ:
1. How long can finish assembling the radiator core by the semi automatic core building machine?
The experienced workers can assemble one aluminium core builder in 3-5 minutes,depends on the size of core.
2. What’s the requirements for assembling the head plate of automatic core building machine?
The requirements for assembling the head plate of automatic core building machine is relatively high,the allowable tolerance is small,less burr,the direction of each hole of tube must maintain smooth.
3. Does it can assemble the same height of fins in the radiator core and condenser core in the same machine?
No,because it has big difference between the radiator tube and condenser tube,it can’t be mixed use.
4. Does it can assemble different heights of fins in the same machine ?
No,at the moment the core building machine only can assemble the cores which has single specification height of fins.If it needs to assemble different heights of fins,it needs to customize from us.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Agent,Seller
Year Established:
2004
Total Annual:
5000000-6000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Our company has been engaged in the manufacture and development of auto radiator condenser products for more than 15 years. Most of the products are sold to various countries and regions in the world, and we have accumulated rich production experience. With the development of the heat exchanger i... Our company has been engaged in the manufacture and development of auto radiator condenser products for more than 15 years. Most of the products are sold to various countries and regions in the world, and we have accumulated rich production experience. With the development of the heat exchanger i...
Get in touch with us
Leave a Message, we will call you back quickly!