Supply Ability | 5000 tons per month |
Delivery Time | Shipped in 30 days after payment |
Packaging Details | Bandage/wood box/bulk/customize. Different products with different packaging methods. |
Product name | High strength Steel Structure skywalk pedestrian bridge |
Purlin | Z-shape Steel Purlin |
Grade | Q235, Q345 |
Dimensions | 00 SQM to 100000 SQM |
Size | up to customer's require |
Installation | Supervision |
Brand Name | ibeehive |
Place of Origin | shenyang |
View Detail Information
Explore similar products
Temporary Q235 GB Standard Structural Steel Bridge
Small Steel Temporary JIS Bailey Suspension Bridge
ASTM Suspended Q345B Structural Steel Bridge For Vehicles
Manual Temporary Modular Steel Girder Bridge
Product Specification
Supply Ability | 5000 tons per month | Delivery Time | Shipped in 30 days after payment |
Packaging Details | Bandage/wood box/bulk/customize. Different products with different packaging methods. | Product name | High strength Steel Structure skywalk pedestrian bridge |
Purlin | Z-shape Steel Purlin | Grade | Q235, Q345 |
Dimensions | 00 SQM to 100000 SQM | Size | up to customer's require |
Installation | Supervision | Brand Name | ibeehive |
Place of Origin | shenyang | ||
High Light | steel structure bridge ,prefabricated steel bridges |
1) Good store capability
2) Hign safety
3) Multi-purpose
4) Good performance
We can supply various steel bridges & steel bridge materials: (1) highway bridge-box; (2) steel box girder; (3) steel pipe uprights, as well steel structure fabrication & installation, etc. We provide products according to the need of the customers.
Main Technical Standard:
Size data | Remarks | |
Total length | 118.50m | - |
Span | 100m | - |
Total width | 57m | - |
The width of the middle bridge | 13.0m*2 | This bridge composes of middle bridges and two side bridges |
The width of the side bridge | 13.45m*2 | - |
Total weight | 1500Ton | - |
Specifications of Steel structure bridge:
1) Caidong Bridge crosses over River Caishi and starts from Hudong Road. With the length of 100m and width of 57m it has two main bridges in the middle and two side bridges. So the bridge is designed with four beam types as the road cross section.
2) The side bridge is under-supporting rigid Tied and rigid basket handle arch bridge, the angle between medial arch axial plane and the vertical plane is 8 degrees. The angle between lateral arch shaft surface and the vertical plane is 10 degrees. Both are inclined to the inside of the side bridge. Rib steel was finished with box structure production, all-welded design, factory production, site installation.
3) The Caidong Bridge with arch frame exposed, has three-dimensional forked shape and steel box gantry, which indicates the vigorous upright spirit and great endeavor, both epitomize the perfect combination of a higher, faster, stronger era style.
Characteristics of structural material:
1) Steel box arch
Arch rib is made from steel structure. The steel applied Q345C low alloy high strength structural steel. Both the medial, lateral arch rib and arch axis surface are inclined to the inward. Medial arch ribs tilts 8 degrees, outside of Rib tilts 10 degrees. Two arch ribs close to each other, and the vault is at the net distance of 1696mm, which forms the structure of the basket handle arch.
1~2 longitudinal stiffeners are equipped with on the top of upper and down steel boxes. In the middle of two battens, stiffeners are also equipped. The middle part of Back plane is equipped with a partition with hollow rectangular cross-section.
Every piece of Arch rib is divided into 7 parts, which compromise three sections: arch foot section, middle arch section, and vault section. The horizontal projection length of each section is 16.5m and 17.6m. Each segment is manufactured by factories. After the production, the different section will be transported to the site. Then, they will be welded, installed and assembled to be the whole arch box.
2) wind bracing
The Whole Bridge has been equipped with 7 wind brace and one arch vault. The space between every two wind brace is 10~15m. The bridge gauge is 16Mnq. The wind bracing set 1 to 3 partitions, the horizontal and vertical stiffeners were equipped to strengthen the structure.
Wind bracing are produced by factory. Then it is transported to the site, and Rib will be connected through the groove welding.
Height | Width | Thickness | Projection length | |
Steel box for arch rib | 500mm | 800mm | 24mm | - |
Middle batten | 400mm | - | 24mm | - |
1-2 longitudinal stiffener | 100mm | - | 32mm | - |
Partition for arch rib | 100mm | - | 18mm | - |
Arch rib | - | - | - | 16.5m/17.6m |
Steel box for wind bracing | 1000m | 600mm | 32mm | - |
Partition for wind bracing | - | - | 20mm | - |
Advantages and features of steel bridges:
Made of special mode steel
Make of the best of space, increase the store capability
With high safety factor
Good performance, easy to disassemble and install
Can be made according to the need of the customers
Applicable to the goods which are long and heavy
Multi-purpose
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Agent,Importer,Exporter,Trading Company,Seller
Year Established:
2000
Total Annual:
50000000-80000000
Employee Number:
400~500
Ecer Certification:
Verified Supplier
iBeehive ENTERPRISE GROUP is one large and diversified private corporation, consisting of Liaoning iBeehive Construction Material Technology Co., LTD., Shenyang iBeehive Steel Structure Engineering Co., Ltd., Liaoning iBeehive Metal Structure Products Co. Ltd., and specializ... iBeehive ENTERPRISE GROUP is one large and diversified private corporation, consisting of Liaoning iBeehive Construction Material Technology Co., LTD., Shenyang iBeehive Steel Structure Engineering Co., Ltd., Liaoning iBeehive Metal Structure Products Co. Ltd., and specializ...
Get in touch with us
Leave a Message, we will call you back quickly!