Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 500 Tons Per Month |
Delivery Time | 4-6 Weeks |
Packaging Details | In bundles |
Brand Name | TORICH |
Model Number | ASTM A519 |
Certification | ISO 9001 |
Place of Origin | Zhejiang China |
View Detail Information
Explore similar products
ERW Precision Steel Tubes ERW Precision Tubes
High Tolerance Seamless Steel Tubes / Precision Steel Pipe Pipe For Automotive
Torich GB/T13793 Q195 Welded Steel Tube ERW Precision Steel Tube
Carbon Seamless Precision Steel Tube Bright Annealing Surface For Motorcycle
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 500 Tons Per Month |
Delivery Time | 4-6 Weeks | Packaging Details | In bundles |
Brand Name | TORICH | Model Number | ASTM A519 |
Certification | ISO 9001 | Place of Origin | Zhejiang China |
High Light | 4130 seamless steel tube ,bmx frames seamless steel tube ,ASTM A519 seamless steel tube |
4130 CHROMOLY TUBE/ HIGH RIGIDITY SEAMLESS STEEL PIPE FOR BMX FRAMES
4130 Alloy Chromoly Steel Pipe
Chemical Composition(%) | Mechanical Property | |||||||||
C | Si | Mn | S | P | Cr | Ni | Cu | Mo | Yield Strength | Tensile Strength |
( σs ) | ( σb ) | |||||||||
0.28~0.33 | 0.15~0.30 | 0.40~0.60 | ≤0.04 | ≤0.035 | ≤0.15 | 0.80~1.10 | / | 0.15~0.25 | ≥785(80) (MPa) | ≥930(95) |
(MPa) | ||||||||||
End Shape | Beveled end, plain end, vanished, or adding plastic caps to protect the two ends as per customer's requirements | |||||||||
Surface | Oiled, Galvanized, Phosphate etc | |||||||||
Treatment | ||||||||||
Technique | Cold drawn | |||||||||
Application | 1. Automotive and mechanical pipes | |||||||||
2. Petroleum cracking pipes | ||||||||||
3. High Pressure Boiler Pipe | ||||||||||
4. Low and middle pressure fluid transportation pipeline | ||||||||||
5. Chemical fertilizer equipment pipes | ||||||||||
6. Heat exchanger pipes | ||||||||||
Delivery | 1. BK (+C) | No heat treatment after last cold forming process. | ||||||||
Conditions | 2. BKW (+LC) | After last heat treatment there is a light finishing pass (cold drawing) | ||||||||
3. BKS (+SR) | After the final cold forming process the tubes are stress relieve annealed. | |||||||||
4. GBK (+A) | After the final cold forming process the tubes are annealed in a controlled atmosphere. | |||||||||
5. NBK (+N) | After the final cold forming process the tubes are annealed above the upper transformation point in acontrolled atmosphere. | |||||||||
Package | 1. Bundle Packing. | |||||||||
2. Plain end or vanished as per customer's request. | ||||||||||
3. Wrapped in waterproof paper. | ||||||||||
4. Sackcloth with several steel strips. | ||||||||||
5. Pack in heavy tri-wall boxes |
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Importer,Exporter,Trading Company,Seller
Year Established:
1997
Total Annual:
25000000-30000000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
Who We are ? -------A professional steel pipes materials inventor, manufacturer and solution provider Torich International Limited is a professional manufacturer and exporter of steel pipes materials. It is an international marketing and sales company specialized in steel tubes, which hol... Who We are ? -------A professional steel pipes materials inventor, manufacturer and solution provider Torich International Limited is a professional manufacturer and exporter of steel pipes materials. It is an international marketing and sales company specialized in steel tubes, which hol...
Get in touch with us
Leave a Message, we will call you back quickly!