China factories

China factory - Dongguan Chuangrui New Energy Co., Ltd

Dongguan Chuangrui New Energy Co., Ltd

  • China,Dongguan ,Guangdong
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China 5G Base Station Fixture USB Power Charger Testing Machine Automated
China 5G Base Station Fixture USB Power Charger Testing Machine Automated

  1. China 5G Base Station Fixture USB Power Charger Testing Machine Automated

5G Base Station Fixture USB Power Charger Testing Machine Automated

  1. MOQ: one set
  2. Price: To be discussed
  3. Get Latest Price
Payment Terms T/T
Supply Ability 10 sets /30 days
Delivery Time 2 to 3 weeks
Packaging Details wooden crate
Color gray
simultaneously measurable 4-16 power supply products
Altitude 1.7m
Customizable Yes
Product Usage Automatic Testing for Adapter Products
Function Rapidly test the performance of various power supply products.
Brand Name Topfer
Model Number Top-Smart 1100
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 10 sets /30 days
Delivery Time 2 to 3 weeks Packaging Details wooden crate
Color gray simultaneously measurable 4-16 power supply products
Altitude 1.7m Customizable Yes
Product Usage Automatic Testing for Adapter Products Function Rapidly test the performance of various power supply products.
Brand Name Topfer Model Number Top-Smart 1100
Place of Origin China
High Light Automated charger testing machineUSB charger testing machineUSB automated test fixture

Manufacturer's 5G Base Station Power Testing System, Charger/Power Bank/Mobile Power Supply Automatic Testing System

 

       The power supply testing system consists of both hardware and software components. The hardware includes a computer, AC SOURCE, power meter, electronic load, digital oscilloscope, and test fixtures; the software component is the independently developed Topfer V4.1 by Chuangrui. It connects and communicates with the other hardware through USB and USB/GPIB conversion interfaces, coordinating the operation of each device, collecting and processing data, and finally generating test reports.

 

      To achieve an intelligent design for the power supply testing system, all the aforementioned devices—AC SOURCE, power meter, oscilloscope, and electronic load—must have communication interfaces, meaning they can connect to a computer and be controlled via programs. The power supply testing system can be customized based on the customer’s actual conditions: factors such as required precision and cost-performance ratio can serve as the basis for selection. If the customer already owns individual units (such as AC SOURCE, power meter, oscilloscope, and electronic load) that are programmable, these can be integrated into the Chuangrui power supply testing system. This way, while ensuring effective testing results, it reduces the customer's expenses and minimizes waste from adopting new equipment at the expense of underutilizing existing ones.

 

Features of the Charger/Power Bank/Mobile Power Supply Automatic Testing System:

 

Open:

  • An open hardware platform that allows for the addition or removal of various testing devices based on customer requirements (including devices with GPIB, RS-232, USB, and other interfaces)
  • An open software platform that can be expanded with new test items and functions according to customer testing needs
  • Supports simultaneous multi-lane barcode pre-scanning functionality, as well as scanning barcodes during testing, enhancing overall test speed."

Universal:

  • Supports comprehensive testing for various power supplies (adapters/chargers, LED power supplies, PC power supplies, inverters, communication power supplies, etc.)!
  • Complies with Energy Star and IEC 62301 measurement requirements
  • Supports Manufacturing Information System (ShopFloor) interface
  • Supports testing of various power supply parameters in CV, CC, CR, CP modes
  • Optimized display mode, arbitrary hardware configuration combinations"

High-Speed:

  • Supports simultaneous testing of multiple single-output or multiple multi-output power supplies, significantly increasing production line capacity. (The testing speed for adapters/chargers/LED power supplies is more than double that of the widely used 6000 series power supply automation systems.)
  • Conducts parallel barcode scanning during testing (Bar Code Reader), greatly improving testing speed.
 

Test Items of the Charger/Power Bank/Mobile Power Supply Automatic Testing System:

Test items Test items
DC output voltage Input voltage ramp
DC output current Input freq. ramp
Peak-Peak noise Tracking
Transient response time Short circuit test
Transient spike Short circuit current
Voltage regulation OV protection
Current regulation UV protection
Turn ON time OL protection
Rise time OP protection
Fall time In-test adjustment
Hold-up time AC cycle drop out
Inrush current test PLD simulation
Power good signal GPIB read/write
Power fail signal 232 read/write
P/S ON signal USB read/write
Power up sequence TTL signal control
Power off sequence Relay control
Effciency Bar code scan
Input RMS current Dynamic test
Input power DC Current under C.V.Mode
Input power factor

DC : specification under C.P.Mode

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    2005

  • Total Annual:

    250-350

  • Employee Number:

    30~50

  • Ecer Certification:

    Verified Supplier

       Dongguan Chuangrui New Energy Co., Ltd., which is a subsidiary of Chuangrui Equipment Intelligent Manufacturing (Xi'an) Co., Ltd. (Stock Code: 836029), is a supplier that integrates R&D, production, and sales services for power automatic test systems (ATE...        Dongguan Chuangrui New Energy Co., Ltd., which is a subsidiary of Chuangrui Equipment Intelligent Manufacturing (Xi'an) Co., Ltd. (Stock Code: 836029), is a supplier that integrates R&D, production, and sales services for power automatic test systems (ATE...

+ Read More

Get in touch with us

  • Reach Us
  • Dongguan Chuangrui New Energy Co., Ltd
  • Room 5072, Unit 1, Building 1, No. 2, Nancheng Section, Tiyu Road, Nancheng Street, Dongguan City, Guangdong Province
  • https://www.powersupplytestsystem.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement