Payment Terms | D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 100 sets one year |
Delivery Time | 30days |
Packaging Details | Stretch film + air cushion film |
Type | curing oven |
Video outgoing-inspection | Provided |
Voltage | customized |
Dimension | According to workpiece size |
Key Selling Points | High efficiency and energy saving |
powder coating chamber heat energy: | natural gas,diesel oil,LPG,electricity |
Substrate | Steel |
Warranty | one year |
Coating | Powder Coating |
Brand Name | HM |
Place of Origin | Hebei, China |
View Detail Information
Explore similar products
Customized Powder Coating Baking Oven , Large Electric Oven For Powder Coating
Steel Substrate Lpg Powder Coating Oven / Powder Coating Batch Oven
Low Maintenance SS304 SS316 Powder Coating Curing Oven With Gas Burner
180~230 Celsius Electric Powder Coating Curing Oven Energy Saving
Product Specification
Payment Terms | D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 100 sets one year |
Delivery Time | 30days | Packaging Details | Stretch film + air cushion film |
Type | curing oven | Video outgoing-inspection | Provided |
Voltage | customized | Dimension | According to workpiece size |
Key Selling Points | High efficiency and energy saving | powder coating chamber heat energy: | natural gas,diesel oil,LPG,electricity |
Substrate | Steel | Warranty | one year |
Coating | Powder Coating | Brand Name | HM |
Place of Origin | Hebei, China | ||
High Light | High Performance Powder Coating Furnace ,High Performance Powder Coating Booth Oven ,150mm Powder Coating Furnace |
Whether electrical, gas or diesel fired. Whether batch type or conveyorized tunnel type. Designed and built specially for Powder & Liquid curing
purposes assuring you of low power consumption with uniform temperature throughout the working space in the oven.
Melting & Curing constitutes a highly critical phase of the powder coating process. The curing schedules recommended by the powder or liquid
supplier must be strictly followed, if good adhesion & corrosion resistance is to be achieved. While powder melts at approx.100°C, curing requires
higher temperatures usually between 180°C to 200°C.If the curing is inadequate, the quality will be brittle and flake-off easily. If the powder coat is
exposed to harsh heat its colour may change.
Construction:
Welded or modular construction with high quality M.S Sheet
Hot air circulating blower for uniform heat
High quality insulation (Glass/mineral wool) to eliminate heat loss
Electrical,gas& diesel fired (heat exchanger)
Digital temperature controller with auto on/off or manual
No. | Name | Parameter | Remarks |
1 | Circulating fan | Quantity:4-6piece power:5.5kw/one piece | |
2 | burner | Baltur or customized | |
3 | Curing time | 20-25 mintes | |
4 | Curing temperature | 180℃—200℃ | |
5 | Heating time | About 30mintes | |
6 | Thickness of insulation board | 150mm | |
7 | size | According to workpiece size and workpiece output |
|
Quality and Service Commitment Our company always put the interests of customers and product quality to the first place,and always adhere to the"no best, only better" as our purpose. We will be commitment to provide high quality products with perfect site services and after-sales service. Now the specific commitments are as follows:
1. Ensure to timely provide complete sets of equipment and accessories.
2. Ensure that one-time installation debugging acceptance.
3. To provide high quality material with preferential price.
4. Priority to provide customer our new craftworks and products.
5. Free training technological operator to ensure the trained staff can operation independently.
6. In the installation process,we will appoint a installation supervision staff on the spot.
7. we will offer experienced engineers, organize a good installation team for the work of field installation debugging.
8. After the equipment field assembly and installation, we will be also responsible for the single equipment debugging, online debugging and Feeding trial operation,to ensure that equipments can normal operate in full load conditions.We will provide all kinds of information and records according to the requirements of the bid.The qualified completion files will be provided to customers according to their requirements within one month after acceptance.
9. In the warranty period, all because of the quality of products has caused the damage or failure of equipment,suppliers will take the responsibility for the free repair and replacing spare part. Due to the damage caused by the customer,we only charge material costs for repair and replacement.
To provide you more details and quotation, would you pls let me know the following information:
1. What is the max and min size for painted product? Would you pls send us some pictures for your product?
2. How many pieces will you paint in one hour or one day?
3. What is your available space for this powder coating line project(length,width and net height)?
4. What is the heating source?(natural gas,LPG,diesel oil,electricity)
5. What kind of pretreatment system do you need?(sand or shot blasting, dipping tank type or spray pretreatment by chemical liquid?)
We like to provide you our full suport for your powder coating line project.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2010
Total Annual:
800000-1000000
Employee Number:
>100
Ecer Certification:
Active Member
'quality first, innovative, valuable services' is our endless purpose!" As a result of the tireless efforts of all staff we have developed into a manufacturing and export company that Professional in research and development, production, sales and service Our main products are:electr... 'quality first, innovative, valuable services' is our endless purpose!" As a result of the tireless efforts of all staff we have developed into a manufacturing and export company that Professional in research and development, production, sales and service Our main products are:electr...
Get in touch with us
Leave a Message, we will call you back quickly!