Payment Terms | T/T, L/C |
Supply Ability | 120 Units Per Year |
Delivery Time | 45 Working Days |
Packaging Details | FR or Bulk Ship |
Model | KMZ611 |
Gradeability | 15° |
Drilling Depth of Rock Drill | 6m |
Transportation Dimension (L x W x H) | 13200*2500*3450mm |
Max.Operating Height | 11m |
Max.Operating Width | 11m |
Rock Drill Power | 16.5Kw |
Drilling Diameter of Rock Drill | Φ43~Φ76mm |
Brand Name | POTENTIAL / POTENCY |
Model Number | KMZ611 |
Certification | ISO9001:2015 |
Place of Origin | CHINA |
View Detail Information
Explore similar products
22Kw Drilling Anchoring Grouting Equipment Anchor Cable Installation Vehicle 12m
4.5m Anchor Cable Trolley 22Kw Single Pole For Soft Rock Large Deformation
Rock Drilling Anchoring Grouting Equipment 22Kw Anchor Cable Mixing Rotation
Ground Drilling And Anchor Cable Trolley KMS810 22Kw Rock Drill Power
Product Specification
Payment Terms | T/T, L/C | Supply Ability | 120 Units Per Year |
Delivery Time | 45 Working Days | Packaging Details | FR or Bulk Ship |
Model | KMZ611 | Gradeability | 15° |
Drilling Depth of Rock Drill | 6m | Transportation Dimension (L x W x H) | 13200*2500*3450mm |
Max.Operating Height | 11m | Max.Operating Width | 11m |
Rock Drill Power | 16.5Kw | Drilling Diameter of Rock Drill | Φ43~Φ76mm |
Brand Name | POTENTIAL / POTENCY | Model Number | KMZ611 |
Certification | ISO9001:2015 | Place of Origin | CHINA |
High Light | Customizable Drilling Anchoring Grouting Equipment ,Underground Drilling Anchoring Grouting Equipment |
KMZ611 Customizable Drilling Anchoring Grouting Equipment for Underground hydropower Plant Construction
Potential/Potency KMZ611 anchor injection trolley is developed specifically for underground hydropower engineering, integrating functions such as hydraulic rock drilling, anchor rod installation, grouting, and mesh installation. Can be used for tunnel support in water diversion projects, tunnels and slopes in railways, highways, deep foundation pits in high-rise buildings, and support operations in underground hydropower plants. It fills the gap in the current field of water conservancy and hydropower where there is no mechanized construction equipment.
1, Chassis form: Engineering chassis, four-wheel drive, four-wheel steering;
2, Power: Dual power of diesel and electric;
3, Control system: Controller control, parameter large screen display,
4, Arm control intelligent assistance system;
5, The main arm integrates hydraulic rock drilling drilling system, grouting system, and anchor rod installation system;
6, The auxiliary arm integrates a high-altitude work platform and a fully hydraulic multi degree of freedom robotic arm;
Item | Parameter | Value | Unit |
1 | Weight | 25500 | kg |
2 | Walking Speed | 0~15 | km/h |
3 | Rock Drill Power | 16.5 | kw |
4 | Drilling Diameter of Rock Drill | Φ43~Φ76 | mm |
5 | Drilling Depth of Rock Drill (Single Rod) | 6 | m |
6 | Drilling Speed of Rock Drill | 1-1.2 | m/min |
7 | Water-cooled Diesel Engine |
119/2200 |
kw/rpm |
8 | Minimum Turning Radius | Inner≤3.4m;Outer≤8.5m | m |
9 |
Gradeability |
15 | ° |
10 | Theoretical Maximum Flow Rate of Grouting System | 2500 | l/h |
11 |
|
11 | m |
12 | Maximum Working Width | 11 | m |
13 | Dimensions in Transport State (Length x Width x Height) |
13200*2500*3450 |
mm |
14 | Air Compressor Power | 3.6 | kw |
In tunnel engineering, the water and electricity anchor rod trolley is mainly used for support operations during tunnel excavation. During tunnel excavation, it is necessary to provide support to the surrounding rock to maintain stability. The anchor rod trolley can efficiently perform tasks such as drilling anchor rods, automatic clamping and pushing anchor rods, and automatic grouting, improving the speed and quality of tunnel excavation.
In underground engineering, water and electricity anchor rod trolleys are widely used in underground factory excavation, subway construction, water conservancy engineering, underground pipe galleries and other scenarios. These projects require reinforcement of tunnels, installation of supports, and installation of protective walls to ensure the stability and safety of underground structures. The anchor rod trolley can quickly and accurately complete these tasks, improving construction quality and safety.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1992
Total Annual:
15000000-50000000
Employee Number:
300~500
Ecer Certification:
Verified Supplier
Our factory was founded in the early 1990s with a registered capital of 60 million yuan, we are a high-tech enterprise specializing in the research and development, design, manufacturing, sales, and leasing of tunnel & mining intelligent equipment and construction machinery as well. ... Our factory was founded in the early 1990s with a registered capital of 60 million yuan, we are a high-tech enterprise specializing in the research and development, design, manufacturing, sales, and leasing of tunnel & mining intelligent equipment and construction machinery as well. ...
Get in touch with us
Leave a Message, we will call you back quickly!