Payment Terms | T/T, L/C, Western Union |
Supply Ability | 80 SETS PER MONTH |
Delivery Time | 35 DAYS |
Packaging Details | air bubble film for plastic, wooden case for molds |
Mold material | Aluminum A356 |
product name | rotomolded partial slide molds |
wall thickness | 8mm to 10mm |
Mold process | Design, foam, casting, CNC process, Polish, Frame, Test, Packing |
lifetime | over 8000 shots |
plastic material | LLDPE/ HDPE/MDPE |
Brand Name | J&C |
Model Number | customized sizes |
Place of Origin | Shanghai, China |
View Detail Information
Explore similar products
LLDPE Plastic ManholeRotational Moulding Products By Aluminum A356 Rotational
Roto Molded Plastic Products PE Road Barrier Mold , Rotational Moulding Service
Precision Plastic Rotational Moulding For Kids Outdoor Playground Equipments
Playground Equipment Rotational Moulding Products / Plastic Rotational Moulding
Product Specification
Payment Terms | T/T, L/C, Western Union | Supply Ability | 80 SETS PER MONTH |
Delivery Time | 35 DAYS | Packaging Details | air bubble film for plastic, wooden case for molds |
Mold material | Aluminum A356 | product name | rotomolded partial slide molds |
wall thickness | 8mm to 10mm | Mold process | Design, foam, casting, CNC process, Polish, Frame, Test, Packing |
lifetime | over 8000 shots | plastic material | LLDPE/ HDPE/MDPE |
Brand Name | J&C | Model Number | customized sizes |
Place of Origin | Shanghai, China | ||
High Light | roto molded plastic products ,products made by rotational moulding |
| ||||||||||||||||
Step1
Plastic raw material (typically in powder form) is placed inside a mold (cast aluminum, CNC machined aluminum)
Step2
The mold is attached to an arm of a rotational molding machine, and enters the oven where it rotates (rotational molding) on two axes.
Step3
As the plastic material melts, it begins to adhere to the inside mold walls, building wall thickness and taking on the shape and texture of the interior mold surface.
Step4
After rotating in the oven, the mold enters the cooling phase, where the molten material eventually solidifies into the finished, hollow plastic part.
Step5
The part is then removed from the mold, where it undergoes a variety of secondary operations (trimming, foam-filling, assembly, etc.) prior to shipment.
Company Details
Business Type:
Manufacturer
Year Established:
2015
Total Annual:
4.5 million-5 million
Employee Number:
70~110
Ecer Certification:
Active Member
Shanghai Jiechuang Mold Manufacturing Co.,Ltd. is located in the Songjiang District of Shanghai city which is so historical that it was named “the Root of Shanghai”. With only 30-minute distance from Hongqiao Airport, the traffic here is very convenient. Set up in 2015, Jiechuang now pos... Shanghai Jiechuang Mold Manufacturing Co.,Ltd. is located in the Songjiang District of Shanghai city which is so historical that it was named “the Root of Shanghai”. With only 30-minute distance from Hongqiao Airport, the traffic here is very convenient. Set up in 2015, Jiechuang now pos...
Get in touch with us
Leave a Message, we will call you back quickly!