Packaging Details | Carton packaging |
Payment Terms | L/C, D/A, D/P, T/T, Western Union |
Plastic modling type | Injection |
Product name | Plastic Injection Part |
Color | Black |
Application | Electrical/Furniture/Agricultural/Medical/Horticultural/Security |
Surface treatment | Highly Polishing |
Process | plastic injection |
Mold life | 500000 shots |
Plastic parts material | Arcylic |
Certification | ISO 9001,IATF 16949,ISO 13485, ISO 14001 |
Place of Origin | China (Mainland) |
Model Number | customized |
View Detail Information
Explore similar products
NAK80 S136 Plastic Injection Molding Automotive Parts Customized Size
500000 Shots Injection Molded Plastic Parts Automative Air Vent
PPE Plastic Injection Moulding Manufacturing Process High Productivity
ISO Precision Plastic Injection Molding Automotive Parts OEM ODM Avalible
Product Specification
Packaging Details | Carton packaging | Payment Terms | L/C, D/A, D/P, T/T, Western Union |
Plastic modling type | Injection | Product name | Plastic Injection Part |
Color | Black | Application | Electrical/Furniture/Agricultural/Medical/Horticultural/Security |
Surface treatment | Highly Polishing | Process | plastic injection |
Mold life | 500000 shots | Plastic parts material | Arcylic |
Certification | ISO 9001,IATF 16949,ISO 13485, ISO 14001 | Place of Origin | China (Mainland) |
Model Number | customized | ||
High Light | ISO9001 Highly Polishing Injection Mold Components ,Highly Polishing Polypropylene Car Parts ,Highly Polishing Polypropylene Injection Mold Components |
Highly Polishing Automotive Plastic Injection Tooling & Molding Parts
Product Description
Injection Molding
We offer the fastest, most cost-effective, short run injection molding services available in the world. From start to finish we can ship most projects in 25 days or less.
Our unique system, proprietary technology platform and a team of expert engineers and mold makers allow us to turn your 3D CAD model into a fully functional prototype or production part using real engineered grade resins, more consistently and affordably than any other rapid injection molding company.
It starts with our Advanced Mold Making System. We have developed software to significantly increase the speed of the mold building process. We can reduce a typical mold build time of 6-12 weeks to just a few days.
Once the mold is created in a matter of days, it goes through our Proprietary Process Engine; the driving force behind our injection molding process. It carefully analyzes and guides our technicians to ensure optimal conditions to help create your consistent custom molded plastic parts.
Moldmaster hot runner system with 4 lifter to eject the parts,hot nozzle direct on part,no sprue or runner.
It used to save the raw material.
Normally if the plastic part is big and large quanity,we suggest customer to use hot runner system to save material , that is a way to save money
FAQ:
1. What is your business?
A. Precision Plastic Mold manufacture
B. Medium and large plastic mold manufacture
C. Injection molding
D. professional designing and making
E. R&D service
2. How about tolerance?
Mold tolerance is 0.005 mm, Product tolerance is 0.02 mm.
3. What steel do you usually use?
We usually use steel of P20, P20H, H-13,O-1,S-7,420,420H,D2, NAK80, 1.2311, 1.2711,1.2344,1.2510,1.2083,1.2316 and 1.2379.
4. What standard components do you usually use?
We use standard components from LKM, DAIDO, HASCO, DME. (Hot Runner: MOLD MASTER, HUSKY, DME, HASCO, INCOE, THERMOPLAY, YUDO.)
5. What do you need for a quotation?
We need 2D part drawing & 3D drawing, and specific mold or part requirements.
2D File Format dwg /dxf /pdf/jpg ,3D Model Format step /x_t /igs /prt
6.How about your mold payment terms?
Mold payment terms:40%-30%-30%.The first payment is when you sign the order, you should pay us 40% of the total value; the second payment is when you receive our sample product, you should pay us 30% of the total value; the last payment is when we deliver the mold for you, you should pay off the balance payment,30% of the total value.
7. How about your part payment terms?
Part payment terms:50%-50%.The first payment is when you sign the order, you should pay us 50% of the total value to purchase the material; The last payment is when we deliver the part for you, you should pay off the balance payment,50% of the total value.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2005
Total Annual:
50000000-60000000
Employee Number:
900~1000
Ecer Certification:
Active Member
Xiamen Voke Mold & Plastic Eng. Co., Ltd. was founded in 2005, the headquarters is located in the Torch High-tech Park, Xiamen City, Fujian with a production center of 50,000 square meters. Since its establishment, Voke has grown rapidly on the road of specialization and internationalization. At... Xiamen Voke Mold & Plastic Eng. Co., Ltd. was founded in 2005, the headquarters is located in the Torch High-tech Park, Xiamen City, Fujian with a production center of 50,000 square meters. Since its establishment, Voke has grown rapidly on the road of specialization and internationalization. At...
Get in touch with us
Leave a Message, we will call you back quickly!