Packaging Details | Carton packaging |
Payment Terms | L/C, D/A, D/P, T/T, Western Union |
Application | Electrical/Furniture/Agricultural/Medical/Horticultural/Security |
Surface finish | Texture/Sandy/MT/YS/SPI/EDM finish/smooth/glossy |
Plastic modling type | Injection |
Service | OEM/ODM |
Mold base | LKM.HASCO. DME or Chinese standard |
Plastic parts material | ABS PA POM PP PC TPE PBT PE PS AS (SAN) PVC Plastic |
Colors available | Pantone/RAL and other custom colors |
Certification | ISO 9001,IATF 16949,ISO 13485, ISO 14001 |
Place of Origin | China (Mainland) |
Model Number | customized |
View Detail Information
Explore similar products
Texture EDM Finish Plastic Injection Molding Medical Parts High Precision
1-64 Cavities Medical Plastic Molding Plastic Mold Components
ABS PA POM TPE Plastic Injection Molding Medical Parts Multi Cavity
ISO14001 Medical Device Plastic Injection Molding 0.003mm-0.01mm Tolerance
Product Specification
Packaging Details | Carton packaging | Payment Terms | L/C, D/A, D/P, T/T, Western Union |
Application | Electrical/Furniture/Agricultural/Medical/Horticultural/Security | Surface finish | Texture/Sandy/MT/YS/SPI/EDM finish/smooth/glossy |
Plastic modling type | Injection | Service | OEM/ODM |
Mold base | LKM.HASCO. DME or Chinese standard | Plastic parts material | ABS PA POM PP PC TPE PBT PE PS AS (SAN) PVC Plastic |
Colors available | Pantone/RAL and other custom colors | Certification | ISO 9001,IATF 16949,ISO 13485, ISO 14001 |
Place of Origin | China (Mainland) | Model Number | customized |
High Light | LKM Plastic Injection Molding Medical Parts ,Injection Molding Medical Parts LKM HASCO ,Plastic Molding Medical Parts LKM HASCO |
LKM.HASCO. DME or Chinese standard Medical Plastic Injection Tooling & Molding Parts
Plastic Material:PP,ABS,PC, TPE, PE, TPU, PPSU, PSU,PEEK, PEI, PBT, PA, LSR, POM,PCTG,PC/ABS
Plastic Surface finish:Polishing finish,Texture Finish,Glossy Finish, Painting,Printing, VDI-3400,plating
Drawing format:UG, IGES, STEP,x_t, AutoCAD, Solidworks,Catia, PTC Creo, DWG, PDF, etc..
Certificated:ISO13485, ISO14001
Range of markets:Life Sciences,Diagnostics
Mould Material:S136, NAK80
Hot runner:Synventive, Incoe, HRS, moldmasters, HUSKY, EWIKON, Guenther,BHT
Injection machine size:30T-250T
Cavities:1-64
Design and production flow
STEP | Process |
1 | First imput → Receive client's 2D and 3D drawing, better in .step file format, or receive client |
2 | DFM anaylis on the 3D drawing, Part line, core and cavity design |
3 | Communication with clients re the DFM anaylis |
4 | Tooling design and tooling plan |
5 | Tooling making such as cnc machining and EDM process, tooling assembly etc.. |
6 | First tiral on the tooling,Tooling anaylis after the first trial, OTS checking. |
7 | Tooling etching or final polishing after First samples approval. |
8 | Golden samples Trial and samples approval. |
9 | Pilot production and mass production |
Mould Trade Process
Quote:According to sample, drawing and specific requirement.
↓
Discussion:Mold material, cavity number, price, runner, payment, etc.
↓
S/C Signature:Approval for all the items
↓
Advance Pay:40% by T/T
↓
Product Design Checking:We check the product design. If some position is not perfect, or can not be done on the mould, we will send customer the report
↓
Mold Tooling:We start to make mold after mold design confirmed
↓
Mold Processing: Send report to customer once each week
↓
Mold Testing: Send trial samples and try-out report to customer for confirmation.
↓
Pay :30% by T/T on trial samples
↓
Mold Modification:According to customer's feedback
↓
Balance settlement:30% by T/T after the customer approved the trial sample and mould quality.
↓
Delivery:Delivery by sea or air. The forwarder can be designated by your side.
1. Automotive mold
Automotive trim, Rearview mirror shell,Central glive box,Front and rear wheel brow,Door frame,Roof rack,Before and after the retaining bar
Round shel cover plate,front and rear pedal,Air outlet grille, Auto lamp,The front baffle,Cockpit,Plastic Spindle
2. Home appliance product mold
Kitchen Appliances,Coffee port cover,Baby Plastic Tray Covers,Home appliance component,Plastic Spoon,Plastic Filter Shim, Home appliance component,Bottle Cap
3. Electronic product mold
Digital Signal Processor Cover,Plastic Lampholder,Plastic Lamp Shade,Socket Cover, Enclosure Cover,Semi-transparent Lamp Shade,Electronic Product Shell,Heating Panel,Intelligent Touch-screen Cover and Base
4. Over-mould injection mold
Bi-color cap, remote control mold, Hand Grip/hold/knob/shank,Road Traffic Cones Base,Cosmetic Bi Color Fliptop Cap,Bi-color Screen Frame,Medical product hand Grip
5. Medical injection mold
Rapid Cap for Insulin Pen,Sleep Posture Belt,Len Case,Dental deill cover,Orthotic foot cushions,Artificial nipples
6. Industrial product mold
Insert molding,Plug Lid,Plastic Belt Buckle, plastis base cover,Vacuum Cleaner Connection, Rail Connection,Traffice Guidepost Cap, Plunger Guide Cap,Instrument Frame,Plastic Leg,Machine support insert,Connection Box,Industrial Container
7. Die casting mold
Camera Chassis,Radio Assembly for Satellite Systems,Camera Housing,Cartridge Adhesive Applicators,Tablet Frame,toothbrush base and shaft, heat sink for LED headlinghts, phone front cover,Aluminum Heat Sink Cover,Aluminum Motor Cover
RAQ
1. Are you trading company or manufacturer ?
We are plastic mold and molding factory.
2.How long is your delivery time?
Generally it is 25-35 days for mold, the production time is depend on customers' product quantity.
3. Do you provide samples ? is it free or extra ?
Yes, we could offer the sample for free charge but customer would in charge of delivery cost.
4.What is your terms of payment?
Payment for mold is 50% deposit by T/T in advance, 30% second payment before send out the first trial samples, 20% balance after customers agreed the final samples and before mold delivery.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2005
Total Annual:
50000000-60000000
Employee Number:
900~1000
Ecer Certification:
Active Member
Xiamen Voke Mold & Plastic Eng. Co., Ltd. was founded in 2005, the headquarters is located in the Torch High-tech Park, Xiamen City, Fujian with a production center of 50,000 square meters. Since its establishment, Voke has grown rapidly on the road of specialization and internationalization. At... Xiamen Voke Mold & Plastic Eng. Co., Ltd. was founded in 2005, the headquarters is located in the Torch High-tech Park, Xiamen City, Fujian with a production center of 50,000 square meters. Since its establishment, Voke has grown rapidly on the road of specialization and internationalization. At...
Get in touch with us
Leave a Message, we will call you back quickly!