China factories

China factory - Hebei Zexu Pipe Manufacturing Co., Ltd.

Hebei Zexu Pipe Manufacturing Co., Ltd.

  • China,Cangzhou ,Hebei
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Al Cu 5mm High Precision Steam Blowing Target Plate
China Al Cu 5mm High Precision Steam Blowing Target Plate

  1. China Al Cu 5mm High Precision Steam Blowing Target Plate
  2. China Al Cu 5mm High Precision Steam Blowing Target Plate
  3. China Al Cu 5mm High Precision Steam Blowing Target Plate

Al Cu 5mm High Precision Steam Blowing Target Plate

  1. MOQ: 1pcs
  2. Price: 12-2700USD
  3. Get Latest Price
Payment Terms T/T
Supply Ability 30000ton/Year
Delivery Time 5work days
Packaging Details Export wooden box
Material Al Cu
shape rectangle
name target board
use Pipeline steam purge
model According to the picture processing
Surface treatment polishing
Brand Name zexu
Model Number 5mm,6mm,8mm,10mm
Certification CE API ISO9001
Place of Origin Hebei china

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 30000ton/Year
Delivery Time 5work days Packaging Details Export wooden box
Material Al Cu shape rectangle
name target board use Pipeline steam purge
model According to the picture processing Surface treatment polishing
Brand Name zexu Model Number 5mm,6mm,8mm,10mm
Certification CE API ISO9001 Place of Origin Hebei china
High Light 5mm steam blowing target plateISO9001 5mm steam blowing target plate5mm Al Cu target plate

High-Precision Mirror Aluminum Plate Power Plant Pipe Cleaning

 

The general requirements for pipe purge are:

1. After the strength test of the piping system, before the air pressure tightness test, purge and clean should be carried out in sections
2. The method of purging should be determined according to the requirements for the use of the pipeline, the working medium and the degree of stolen goods on the inner surface of the pipeline. Liquid or gas pipelines with a nominal diameter greater than or equal to 600mm should be manually cleaned. Liquid pipelines with a nominal diameter less than 600mm should be cleaned manually. Use water to clean the gas pipeline with a nominal diameter of less than 600mm, which should be purged with air. Steam pipes should be purged with steam, and non-thermal pipes should not be purged with steam. The purge is generally carried out in sequence according to the main pipe, branch pipe, and drain pipe.
3. Before the pipeline is purged, a detailed purging plan should be prepared and carried out in sections according to the system
4. The equipment and pipes that are not allowed to be purged are separated from the purging system.
5. After the pipeline is qualified for purging, in addition to the prescribed inspection and restoration work, no other work affecting the cleaning of the pipeline shall be carried out, and the "Pipeline System Purging Record" shall be filled in Before the pipeline is purged, orifice plates, flange-connected regulating valves, main valves, throttle valves, safety valves, instruments, etc. should not be installed. For the above-mentioned valves and instruments connected by welding, the bypass should be used or the seal should be removed. Protective measures such as pieces.

 

The order of purging should be carried out in the order of main pipe, branch pipe, and drain pipe. The blown out dirt must not enter the pipe that has been purged.

 

The dirt discharged by purging shall not pollute the environment, and random discharge is strictly prohibited.
A restricted area should be set before purging.
After the pipeline has been purged qualified, other operations that affect the cleaning shall not be carried out.

 

product description

name Aluminum target board
use Power plant pipe cleaning
Material Al ,Cu
thickness 5mm, 6mm, 8mm, 10mm
Type rectangle
size According to requirements
Purging requirements Equipment and pipes that are not allowed to be purged should be isolated from the purging systemBefore the pipeline is purged, orifice plates, flange-connected regulating valves, main valves, throttle valves, safety valves, instruments, etc. should not be installed. For the above-mentioned valves and instruments connected by welding, the bypass should be used or the seal should be removed. Protective measures such as pieces.
The order of purging should be carried out in the order of main pipe, branch pipe, and drain pipe. The blown out dirt must not enter the pipe that has been purged.
The dirt discharged by purging shall not pollute the environment, and random discharge is strictly prohibitedThe dirt discharged by purging shall not pollute the environment, and random discharge is strictly prohibited

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2016

  • Total Annual:

    10000000-50000000

  • Employee Number:

    >100

  • Ecer Certification:

    Active Member

      Hebei Zexu Pipeline Manufacturing Co., Ltd. has a complete production and operation management system and is one of the first companies in the industry to pass the ISO9001 quality management system certification, HSE environment, and occupational health and safety management sys...       Hebei Zexu Pipeline Manufacturing Co., Ltd. has a complete production and operation management system and is one of the first companies in the industry to pass the ISO9001 quality management system certification, HSE environment, and occupational health and safety management sys...

+ Read More

Get in touch with us

  • Reach Us
  • Hebei Zexu Pipe Manufacturing Co., Ltd.
  • Yanshan County, Cangzhou City, Hebei Province
  • https://www.piping-fittings.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement