Payment Terms | L/C, T/T |
Supply Ability | 100000 Piece/Pieces per Month |
Delivery Time | 3-5 days |
Packaging Details | Standard export packaging (outside the plywood box, inside the plastic cloth box) |
size | 55*500*5mm |
model | According to the picture processing |
standard | Processing according to drawings |
Material | Aluminum copper |
Origin | Cangzhou, China |
Construction period | 3 days |
use | Power plant experiment |
project | Steam purge |
Brand Name | Ze Xu |
Model Number | According to the picture processing |
Certification | CE API |
Place of Origin | Cangzhou, China |
View Detail Information
Explore similar products
Pipeline Steam Purge 10mm Steam Blowing Target Plate
Power Plant Purging Aluminum Steam Blowing Target Plate Board
ISO Alloy Main Target Plate Steam Blowing 10mm
A335 P11 High Temperature Alloy Steam Blowing Target Plate
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 100000 Piece/Pieces per Month |
Delivery Time | 3-5 days | Packaging Details | Standard export packaging (outside the plywood box, inside the plastic cloth box) |
size | 55*500*5mm | model | According to the picture processing |
standard | Processing according to drawings | Material | Aluminum copper |
Origin | Cangzhou, China | Construction period | 3 days |
use | Power plant experiment | project | Steam purge |
Brand Name | Ze Xu | Model Number | According to the picture processing |
Certification | CE API | Place of Origin | Cangzhou, China |
High Light | 5mm Mirror Polished Aluminum Sheet ,500mm Mirror Polished Aluminum Sheet ,55mm polished aluminum sheet |
Steam Pipe Purging DeviceAluminum target board for power plant pipeline purging
After the piping system is installed, it can be blown by air or steam according to the working conditions of the working medium and the degree of dirt on the inner surface of the pipe. The general requirements for pipe purge are:
Equipment and pipes that are not allowed to be purged should be isolated from the purging system.
Before the pipeline is purged, orifice plates, flange-connected regulating valves, main valves, throttle valves, safety valves, instruments, etc. should not be installed. For the above-mentioned valves and instruments connected by welding, the bypass should be used or the seal should be removed. Protective measures such as pieces. The order of purging should be carried out in the order of main pipe, branch pipe, and drain pipe. The blown out dirt must not enter the pipe that has been purged.
The dirt discharged by purging shall not pollute the environment, and random discharge is strictly prohibited.
A restricted area should be set before purging.
After the pipeline has been purged qualified, other operations that affect the cleaning shall not be carried out.
1. After the strength test of the piping system, before the air pressure tightness test, purge and clean should be carried out in sections
2. The method of purging should be determined according to the requirements for the use of the pipeline, the working medium and the degree of stolen goods on the inner surface of the pipeline. Liquid or gas pipelines with a nominal diameter greater than or equal to 600mm should be manually cleaned. Liquid pipelines with a nominal diameter less than 600mm should be cleaned manually. Use water to clean the gas pipeline with a nominal diameter of less than 600mm, which should be purged with air. Steam pipes should be purged with steam, and non-thermal pipes should not be purged with steam. The purge is generally carried out in sequence according to the main pipe, branch pipe, and drain pipe.
3. Before the pipeline is purged, a detailed purging plan should be prepared and carried out in sections according to the system
4. The equipment and pipes that are not allowed to be purged are separated from the purging system.
5. After the pipeline is qualified for purging, in addition to the prescribed inspection and restoration work, no other work affecting the cleaning of the pipeline shall be carried out, and the "Pipeline System Purging Record" shall be filled in
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2016
Total Annual:
10000000-50000000
Employee Number:
>100
Ecer Certification:
Active Member
Hebei Zexu Pipeline Manufacturing Co., Ltd. has a complete production and operation management system and is one of the first companies in the industry to pass the ISO9001 quality management system certification, HSE environment, and occupational health and safety management sys... Hebei Zexu Pipeline Manufacturing Co., Ltd. has a complete production and operation management system and is one of the first companies in the industry to pass the ISO9001 quality management system certification, HSE environment, and occupational health and safety management sys...
Get in touch with us
Leave a Message, we will call you back quickly!