Payment Terms | T/T |
Supply Ability | 100,0000 tons per month |
Delivery Time | 3-7 Working day |
Packaging Details | Wooden box, pallet or according to customer requirements |
Material | Aluminum, copper, iron |
shape | Rectangle |
Fixing hole | Round hole, oval hole, counterbore, etc. |
thickness | 5mm、6mm、8mm、10mm etc. |
Brand Name | Ze Xu |
Model Number | based on customer's needs |
Certification | ISO9000 |
Place of Origin | Yanshan, Hebei, China |
View Detail Information
Explore similar products
Pipeline Steam Purge 10mm Steam Blowing Target Plate
Power Plant Purging Aluminum Steam Blowing Target Plate Board
ISO Alloy Main Target Plate Steam Blowing 10mm
A335 P11 High Temperature Alloy Steam Blowing Target Plate
Product Specification
Payment Terms | T/T | Supply Ability | 100,0000 tons per month |
Delivery Time | 3-7 Working day | Packaging Details | Wooden box, pallet or according to customer requirements |
Material | Aluminum, copper, iron | shape | Rectangle |
Fixing hole | Round hole, oval hole, counterbore, etc. | thickness | 5mm、6mm、8mm、10mm etc. |
Brand Name | Ze Xu | Model Number | based on customer's needs |
Certification | ISO9000 | Place of Origin | Yanshan, Hebei, China |
Steam Purging Target Plate Copper Target Plate Carbon Steel Target Plate Shaft Target Plate Device
Installation of target board:
The target board is used to place the target board. Pay attention to the structure and technology of the target board, and have sufficient strength. Its structure should be simple, good sealing, flexible operation, and the exchange of the target board should be safe and convenient.
Commonly used target plate device structures include flange type, straight shaft type, tandem shaft type and frame type, which are internal test target plates, and frame type are external test target plates.
The target plate of the internal test target plate is installed in the purge link pipe or exhaust pipe, as close as possible to the end of the purge pipe, and on the straight pipe 4~6m away from the elbow.
When the two-stage purge method is adopted, after the first stage purge is qualified, the target plate should be removed for the first stage purge. It is not appropriate to install the target board at the first stage.
In order to inspect the blowpipe correctly, the target plate should be polished without visible marks.
After the installation of all equipment in thermal power plants, it is generally necessary to blow pipes through the boiler to purge the pipes with steam. The purpose is to remove the debris remaining in the equipment and pipes during the manufacturing, transportation and installation of the equipment and pipes, and to prevent the boiler from overheating during operation The blower and reheater block and break the pipe, and at the same time prevent debris from entering the steam turbine to cause damage to the blades and valves. Therefore, the boiler and steam turbine need to be tested for trial operation before the safe operation of the boiler and the steam turbine. More valued equipment.
The working principle of the target board:
The target plate is a device used to fix the target plate. The target plate is a metal plate that is manufactured according to the material and size and is used to inspect the torch.
The target plate is installed in the temporary exhaust pipe (or at the exhaust port) at the end of the purged pipe. The material of the target plate can be made of aluminum plate. Its width is about 8% of the inner diameter of the exhaust pipe and the length runs through the pipe. For the inner diameter, under the premise of ensuring the blowpipe coefficient, the target board should be replaced twice for inspection. The particle size of the impact spot on the target board is not more than 0.8mm, and the visible spot is not more than 8 points, and the blowing is considered qualified.
Thickness: 5mm, 6mm, 8mm, 10mm |
Material: aluminum, copper, iron |
shape: rectangle |
Model: According to the pipeline design |
Center distance: According to the target board design |
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2016
Total Annual:
10000000-50000000
Employee Number:
>100
Ecer Certification:
Active Member
Hebei Zexu Pipeline Manufacturing Co., Ltd. has a complete production and operation management system and is one of the first companies in the industry to pass the ISO9001 quality management system certification, HSE environment, and occupational health and safety management sys... Hebei Zexu Pipeline Manufacturing Co., Ltd. has a complete production and operation management system and is one of the first companies in the industry to pass the ISO9001 quality management system certification, HSE environment, and occupational health and safety management sys...
Get in touch with us
Leave a Message, we will call you back quickly!