China factories

China factory - Guangzhou Star Mustang Construction Machinery Parts Co., Ltd

Guangzhou Star Mustang Construction Machinery Parts Co., Ltd

  • China,Guangzhou ,Guangdong
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China TD42 Engine Oil pump 15010-06J02 15010-VB200 15010-VB201 Suitable For NISSAN
China TD42 Engine Oil pump 15010-06J02 15010-VB200 15010-VB201 Suitable For NISSAN

  1. China TD42 Engine Oil pump 15010-06J02 15010-VB200 15010-VB201 Suitable For NISSAN
  2. China TD42 Engine Oil pump 15010-06J02 15010-VB200 15010-VB201 Suitable For NISSAN
  3. China TD42 Engine Oil pump 15010-06J02 15010-VB200 15010-VB201 Suitable For NISSAN
  4. China TD42 Engine Oil pump 15010-06J02 15010-VB200 15010-VB201 Suitable For NISSAN

TD42 Engine Oil pump 15010-06J02 15010-VB200 15010-VB201 Suitable For NISSAN

  1. MOQ: 1 pc
  2. Price: Looking forward to your inquiry
  3. Get Latest Price
Payment Terms T/T, Western Union, MoneyGram,HSBC
Supply Ability 1000 Piece/Pieces per Month
Delivery Time 2-5 work days
Packaging Details Plastic bag , Box , Carton
After Warran Online support
OEM Service Available
Packing Plastic bag , Box , Carton
Application Construction / Industry / Agriculture / Genset / Marine / Handling
Engine Type: Diesel
Marketing Type: Hot Product
Brand Name HDPARTS
Model Number TD42
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T, Western Union, MoneyGram,HSBC Supply Ability 1000 Piece/Pieces per Month
Delivery Time 2-5 work days Packaging Details Plastic bag , Box , Carton
After Warran Online support OEM Service Available
Packing Plastic bag , Box , Carton Application Construction / Industry / Agriculture / Genset / Marine / Handling
Engine Type: Diesel Marketing Type: Hot Product
Brand Name HDPARTS Model Number TD42
Place of Origin China

TD42 Engine Oil pump 15010-06J02 15010-VB200 15010-VB201 Suitable For NISSAN Diesel engines parts

Specification

Applicable models TD42
Type Oil pump
Original number 15010-06J02 15010-VB200 15010-VB201
Warranty 6 months
Engine Type  Diesel
Brand Name  HDPARTS
Condition  New
Size  OEM Size

 

mechanical principle Oil volume regulation
Mechanical installation

1. The quality of the pump installation has a very important impact on the smooth operation and service life of the pump, so the installation and calibration work must be carried out carefully, and it is not allowed to act rashly.

2. The installation height, length and pipe diameter of the pump suction pipe shall meet the calculated values, and strive to be brief to reduce unnecessary losses (such as elbows); And ensure that the allowable NPSH is not exceeded when the pump is working.

3. Suction and discharge lines should have brackets. The pump is not allowed to bear the load of the pipeline.

4. The place where the pump is installed should be spacious enough to facilitate maintenance.

 

 

 
Product Description

 

 

  

Company Information

 

Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.


At presentIt was the first one to enter the construction machinery parts market in 1995. It is located in the center of the world's largest industrial distribution center.​


is supported by scientific research and development strength, new business philosophy, mature marketing team, development and sales of high quality excavator parts.


covers a wide range, and its products are characterized by high strength, high toughness, high temperature resistance, no deformation, high wear resistance, etc.


Including Hydraulics parts, Final Drives parts, Undercarriage parts, General consumable parts, Engine spare parts, and stuff like that which are high-qualified products.


The product matching different kinds of excavator spare parts, which caters to the current market demand for high.

 

RODUCT CATEGORIES

1570502302971052897

 

 

 

Packaging & Shipping

 

Packaging material:Plastic, carton, wooden box

 

We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)

 

 

Forklift Engine Packaging & Shipping

FAQ

Q: What is your main products?
A:We mainly sell diesel engine parts, such as piston, piston ring, cylinder liner, crankshaft.

Q: Do you have any other products?
A:Yes, we have many other diesel engine spare parts.

Q: How to place orders?
A :The order is from your inqiuries.

  1. Confrim PI (the engine model, price, quantity, packing, delivery time, shipping way, time of payment).

  2. You make payment and send us receipt of payment.

  3. We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)

  4. We would deliver goods after we get balance from you. The order finish when you get goods and feel satisfied.

Q: What is the MOQ?
A:We provide sample and will arrange goods as your requirements.

Q: How to make payment?
A:After you confirm PI, you can pay thruogh Alibaba Trade Assurance,Wire transfer, Western union, Paypal, Cash. (The production order can be pay 30% deposit first, after we arranged well, then you pay the balance.)

Q: Could you give guarantee ?
A:Yes, one year warranty.

Q: What kind of packing you can provide?
A:We can provide packing as your requirements or neutral packing or our own trademark packing.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    1998

  • Total Annual:

    99999-1999999

  • Employee Number:

    80~120

  • Ecer Certification:

    Verified Supplier

Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ... Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ...

+ Read More

Get in touch with us

  • Reach Us
  • Guangzhou Star Mustang Construction Machinery Parts Co., Ltd
  • Shop 1215/1216/1217/1218/1219, No. 36 Zhuji Road, Zhuji International Machinery City, Zhuji Street, Tianhe District, Guangzhou City, Guangdong Province
  • https://www.parts-hd.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement