Guangzhou Star Mustang Construction Machinery Parts Co., Ltd
Payment Terms | T/T, Western Union, MoneyGram,HSBC |
Supply Ability | 1000 Piece/Pieces per Month |
Delivery Time | 2-5 work days |
Packaging Details | Plastic bag , Box , Carton |
After Warran | Online support |
OEM Service | Available |
Packing | Plastic bag , Box , Carton |
Application | Construction / Industry / Agriculture / Genset / Marine / Handling |
Engine Type: | Diesel |
Marketing Type: | Hot Product |
Brand Name | HDPARTS |
Model Number | 3D84 3TN84-2 RHB3 |
Place of Origin | China |
View Detail Information
Explore similar products
2674A812 main engine turbocharger 2674A807 For PERKINS
EC210B ENGINE TURBO CHARGER VOE 21647837
KTA19 ENGINE TURBO CHARGER 3594030 For CUMMINS
A498BZG TB28 ENGINE TURBO CHARGER 020500030000 711229-5003 For XINCHAI
Product Specification
Payment Terms | T/T, Western Union, MoneyGram,HSBC | Supply Ability | 1000 Piece/Pieces per Month |
Delivery Time | 2-5 work days | Packaging Details | Plastic bag , Box , Carton |
After Warran | Online support | OEM Service | Available |
Packing | Plastic bag , Box , Carton | Application | Construction / Industry / Agriculture / Genset / Marine / Handling |
Engine Type: | Diesel | Marketing Type: | Hot Product |
Brand Name | HDPARTS | Model Number | 3D84 3TN84-2 RHB3 |
Place of Origin | China | ||
High Light | 3TN84-2 ENGINE TURBO CHARGER ,RHB3 ENGINE TURBO CHARGER ,129403-18050 |
Specification
Applicable models | 3D84 3TN84-2 RHB3 |
Type | Engine turbocharger |
Original number | 129403-18050 |
Warranty | 6 months |
Engine Type | Diesel |
Brand Name | HDPARTS |
Condition | New |
Size | OEM Size |
matters needing attention | ▪ Don't leave without a car ▪ Do not extinguish the engine immediately ▪ Keep clean ▪ To clean: ▪ Pay attention to maintenance |
Structural principle | About the structure principle, the exhaust gas turbocharger is mainly composed of pump impeller and turbine, and of course there are other control elements. The pump wheel and the turbine are connected by a shaft, that is, the rotor. The exhaust gas discharged from the engine drives the pump wheel. The pump wheel drives the turbine to rotate. After the turbine rotates, it pressurizes the intake system |
We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
1998
Total Annual:
99999-1999999
Employee Number:
80~120
Ecer Certification:
Verified Supplier
Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ... Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ...
Get in touch with us
Leave a Message, we will call you back quickly!