Guangzhou Star Mustang Construction Machinery Parts Co., Ltd
Payment Terms | T/T, Western Union, MoneyGram,HSBC |
Supply Ability | 1000 Piece/Pieces per Month |
Delivery Time | 2-5 work days |
Packaging Details | Plastic bag , Box , Carton |
After Warran | Online support |
OEM Service | Available |
Packing | Plastic bag , Box , Carton |
Application | Construction / Industry / Agriculture / Genset / Marine / Handling |
Engine Type: | Diesel |
introduce | High precision steel pipe materials |
advantage | Improve surface roughness |
Brand Name | HDPARTS |
Model Number | 4JB1 |
Place of Origin | China |
View Detail Information
Explore similar products
K25 Engine Cylinder Liner Nissan Diesel Engine Spare Parts
4JX1 4JK1 Diesel Engine Cylinder liner 8-97176-699-0 For ISUZU
S6A Cylinder Liner 32507-12100 For Mitsubi Engine
3AB1 Diesel Engine Cylinder Liner 9-11261-230-0 For ISUZU
Product Specification
Payment Terms | T/T, Western Union, MoneyGram,HSBC | Supply Ability | 1000 Piece/Pieces per Month |
Delivery Time | 2-5 work days | Packaging Details | Plastic bag , Box , Carton |
After Warran | Online support | OEM Service | Available |
Packing | Plastic bag , Box , Carton | Application | Construction / Industry / Agriculture / Genset / Marine / Handling |
Engine Type: | Diesel | introduce | High precision steel pipe materials |
advantage | Improve surface roughness | Brand Name | HDPARTS |
Model Number | 4JB1 | Place of Origin | China |
High Light | 4JB1 Diesel Engine Cylinder Liner ,8-94247-861-0 Diesel Engine Cylinder Liner |
4JB1 Diesel Engine Cylinder Liner 8-94247-861-0 8-94247861-2 For ISUZU
Specification
Applicable models | 4JB1 |
Type | Cylinder liner |
Original number | 8-94247-861-0 8-94247861-2 |
Warranty | 6 months |
Engine Type | Diesel |
Brand Name | HDPARTS |
Condition | New |
Size | OEM Size |
The functions of the cylinder liner include:
1. Together with the cylinder head and piston, it forms the working space of the cylinder.
2. The cylinder liner of a cylindrical piston diesel engine bears the piston side thrust, becoming the lead for the reciprocating motion of the piston.
3. Transfer the heat from the piston components and themselves to the cooling water to ensure proper operating temperature.
The cylinder liner of a two-stroke diesel engine is equipped with air ports, which are opened and closed by the piston to achieve gas distribution.
The inner surface of the cylinder sleeve is directly affected by the high-temperature and high-pressure gas, and always has high-speed sliding friction with the piston ring and piston skirt. The surface comes into contact with cooling water, causing severe thermal stress under large temperature differences and being corroded by cooling water. The lateral thrust of the piston on the cylinder liner not only intensifies its internal surface friction, but also causes it to bend. When the lateral thrust changes direction, the piston also impacts the cylinder liner. In addition, it is also subjected to significant installation preload. |
Product Description
Company Information
Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.
At presentIt was the first one to enter the construction machinery parts market in 1995. It is located in the center of the world's largest industrial distribution center.
is supported by scientific research and development strength, new business philosophy, mature marketing team, development and sales of high quality excavator parts.
covers a wide range, and its products are characterized by high strength, high toughness, high temperature resistance, no deformation, high wear resistance, etc.
Including Hydraulics parts, Final Drives parts, Undercarriage parts, General consumable parts, Engine spare parts, and stuff like that which are high-qualified products.
The product matching different kinds of excavator spare parts, which caters to the current market demand for high.
Packaging & Shipping
Packaging material:Plastic, carton, wooden box
We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)
Packaging & Shipping
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
1998
Total Annual:
99999-1999999
Employee Number:
80~120
Ecer Certification:
Verified Supplier
Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ... Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ...
Get in touch with us
Leave a Message, we will call you back quickly!