Guangzhou Star Mustang Construction Machinery Parts Co., Ltd
Payment Terms | T/T, Western Union, MoneyGram,HSBC |
Supply Ability | 1000 Piece/Pieces per Month |
Delivery Time | 2-5 work days |
Packaging Details | Plastic bag , Box , Carton |
After Warran | Online support |
OEM Service | Available |
Packing | Plastic bag , Box , Carton |
Application | Construction / Industry / Agriculture / Genset / Marine / Handling |
Engine Type: | Diesel |
introduce | High precision steel pipe materials |
advantage | Improve surface roughness |
Brand Name | HDPARTS |
Model Number | 6D102 Horse Brand |
Place of Origin | China |
View Detail Information
Explore similar products
K25 Engine Cylinder Liner Nissan Diesel Engine Spare Parts
4JX1 4JK1 Diesel Engine Cylinder liner 8-97176-699-0 For ISUZU
S6A Cylinder Liner 32507-12100 For Mitsubi Engine
3AB1 Diesel Engine Cylinder Liner 9-11261-230-0 For ISUZU
Product Specification
Payment Terms | T/T, Western Union, MoneyGram,HSBC | Supply Ability | 1000 Piece/Pieces per Month |
Delivery Time | 2-5 work days | Packaging Details | Plastic bag , Box , Carton |
After Warran | Online support | OEM Service | Available |
Packing | Plastic bag , Box , Carton | Application | Construction / Industry / Agriculture / Genset / Marine / Handling |
Engine Type: | Diesel | introduce | High precision steel pipe materials |
advantage | Improve surface roughness | Brand Name | HDPARTS |
Model Number | 6D102 Horse Brand | Place of Origin | China |
High Light | 6D102 Diesel Engine Cylinder Liner ,6736-29-2110 Diesel Engine Cylinder Liner ,3904166 Diesel Engine Cylinder Liner |
6D102 Horse Brand Diesel Engine Cylinder Liner 6736-29-2110 3904166 For KOMATSU
Specification
(4) Abnormal operation of piston ring:
The opening clearance is too small, causing the piston ring to break; The clearance between heaven and earth is too small, which makes the piston ring stuck; Too much carbon deposits cause the piston ring to stick to the ring groove and lose elasticity, resulting in fracture or gas leakage; The opening clearance is too large or the wear is serious, resulting in gas leakage. The gas leakage damages the lubricating oil film, resulting in high surface temperature. After the piston ring is broken, the debris is easy to fall into the piston cylinder, causing cylinder pulling and cylinder biting.
(5) Using inferior fuel:
Incomplete combustion brings more combustion residues; Severe post combustion phenomenon, causing an increase in exhaust temperature and failure to take timely technical measures; The alkaline value of cylinder lubrication is not appropriate. In addition, some diesel engines may experience prolonged overload operation, increased thermal load, overheating, expansion, or poor alignment of moving components, resulting in cylinder pulling.
Applicable models | 6D102 Horse Brand |
Type | Cylinder liner |
Original number | 6736-29-2110 3904166 |
Warranty | 6 months |
Engine Type | Diesel |
Brand Name | HDPARTS |
Condition | New |
Size | OEM Size |
The symptoms of cylinder knocking during operation of diesel generator are: from medium speed to low speed, a heavy cylinder knocking sound will be made, black smoke will be emitted from the exhaust pipe of diesel generator set, and there will be sound of gunfire or fire shooting from time to time, and the engine body will overheat. The main reasons for cylinder knocking are:
1. The fuel supply time is too early
When the piston of the diesel generator set moves upward and does not reach the specified injection position, the fuel injector starts to inject fuel, so that the fuel combustion is advanced. The high-pressure gas in the cylinder impacts the piston, making a rhythmic "click, click" sound, reducing the throttle, and the knock is obvious.
The elimination method is to adjust the fuel supply advance angle, that is, increase the gasket between the fuel injection pump and the gearbox to delay the fuel supply time until it meets the specified fuel injection time. For every 0.1mm increase in the gasket, the fuel supply advance angle can be delayed by 1.3-1.7.
2. Poor fuel combustion
Low fuel injection pressure, fuel injector dripping, poor fuel atomization, and delayed fuel supply can all cause poor fuel combustion and cause cylinder knocking. The knocking sound caused by this type of malfunction is low and hoarse, accompanied by engine overheating, black smoke, or exhaust pipe blasting, spraying fire, and other phenomena. The fuel injector should be removed for inspection and adjustment, and the fuel supply time should be adjusted. If necessary, new parts should be replaced to ensure compliance with regulations.
Product Description
,
Company Information
Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.
At presentIt was the first one to enter the construction machinery parts market in 1995. It is located in the center of the world's largest industrial distribution center.
is supported by scientific research and development strength, new business philosophy, mature marketing team, development and sales of high quality excavator parts.
covers a wide range, and its products are characterized by high strength, high toughness, high temperature resistance, no deformation, high wear resistance, etc.
Including Hydraulics parts, Final Drives parts, Undercarriage parts, General consumable parts, Engine spare parts, and stuff like that which are high-qualified products.
The product matching different kinds of excavator spare parts, which caters to the current market demand for high.
Packaging & Shipping
Packaging material:Plastic, carton, wooden box
We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)
Packaging & Shipping
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
1998
Total Annual:
99999-1999999
Employee Number:
80~120
Ecer Certification:
Verified Supplier
Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ... Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ...
Get in touch with us
Leave a Message, we will call you back quickly!