Guangzhou Star Mustang Construction Machinery Parts Co., Ltd
Payment Terms | T/T, Western Union, MoneyGram,HSBC |
Supply Ability | 1000 Piece/Pieces per Month |
Delivery Time | 2-5 work days |
Packaging Details | Plastic bag , Box , Carton |
After Warran | Online support |
OEM Service | Available |
Packing | Plastic bag , Box , Carton |
Application | Construction / Industry / Agriculture / Genset / Marine / Handling |
Engine Type: | Diesel |
introduce | High precision steel pipe materials |
advantage | Improve surface roughness |
Brand Name | HDPARTS |
Model Number | 4D95 with supercharging |
Place of Origin | China |
View Detail Information
Explore similar products
4D94 4D94-2 Engine Cylinder Head 6144-11-1112 6144-11-1010 For KOMATSU
4D34T Engine Cylinder Head ME997711 For MITSUBISHI
C-9 Engine Cylinder Head 213-4360 For CATERPILLAR
OEM 3406 Engine Cylinder Head 110-5096 For CATERPILLAR
Product Specification
Payment Terms | T/T, Western Union, MoneyGram,HSBC | Supply Ability | 1000 Piece/Pieces per Month |
Delivery Time | 2-5 work days | Packaging Details | Plastic bag , Box , Carton |
After Warran | Online support | OEM Service | Available |
Packing | Plastic bag , Box , Carton | Application | Construction / Industry / Agriculture / Genset / Marine / Handling |
Engine Type: | Diesel | introduce | High precision steel pipe materials |
advantage | Improve surface roughness | Brand Name | HDPARTS |
Model Number | 4D95 with supercharging | Place of Origin | China |
High Light | Engine Cylinder Head 6204-13-1101 ,4D95 Engine Cylinder Head |
4D95 With Supercharging Engine Cylinder Head 6204-13-1101
Specification
Applicable models | 4D95 with supercharging |
Type | Cylinder Head |
Original number | 6204-13-1101 |
Warranty | 6 months |
Engine Type | Diesel |
Brand Name | HDPARTS |
Condition | New |
Size | OEM Size |
1. The reasons for the early wear of the cylinder(1) The new or overhauled engine is put into operation without strict running-in test operation, resulting in early wear of cylinders and other parts.(2) Long-term overload operation. Due to the long-term overload of the engine, the temperature rises, the lubricating oil becomes thinner, and the lubrication is poor, which accelerates the wear of cylinder liners, pistons and piston rings and other parts. And due to the rise of oil, the inflation coefficient decreases, the ratio of fuel to air is out of balance, the combustion is incomplete, and the carbon deposits of cylinders and other parts increase, causing cylinder failure, thereby accelerating the early wear of the cylinder.(3) Long-term idle operation. When the engine is idle for a long time, the engine temperature is too low, the lubrication is poor, the combustion is incomplete, and there are many carbon deposits, which accelerates the early wear of the cylinder. And due to the low temperature of the machine, acidic substances are easy to produce in the cylinder, thereby corroding the cylinder, causing pockmarks to peel off, causing early wear of the cylinder.
Company Information
Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.
At presentIt was the first one to enter the construction machinery parts market in 1995. It is located in the center of the world's largest industrial distribution center.
is supported by scientific research and development strength, new business philosophy, mature marketing team, development and sales of high quality excavator parts.
covers a wide range, and its products are characterized by high strength, high toughness, high temperature resistance, no deformation, high wear resistance, etc.
Including Hydraulics parts, Final Drives parts, Undercarriage parts, General consumable parts, Engine spare parts, and stuff like that which are high-qualified products.
The product matching different kinds of excavator spare parts, which caters to the current market demand for high.
Packaging & Shipping
Packaging material:Plastic, carton, wooden box
We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)
Packaging & Shipping
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
1998
Total Annual:
99999-1999999
Employee Number:
80~120
Ecer Certification:
Verified Supplier
Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ... Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ...
Get in touch with us
Leave a Message, we will call you back quickly!