China factories

China factory - Guangzhou Star Mustang Construction Machinery Parts Co., Ltd

Guangzhou Star Mustang Construction Machinery Parts Co., Ltd

  • China,Guangzhou ,Guangdong
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China 6BD1 Diesel Engine Water Pump EX200-2 1-13610877-0 For ISUZU
China 6BD1 Diesel Engine Water Pump EX200-2 1-13610877-0 For ISUZU

  1. China 6BD1 Diesel Engine Water Pump EX200-2 1-13610877-0 For ISUZU
  2. China 6BD1 Diesel Engine Water Pump EX200-2 1-13610877-0 For ISUZU
  3. China 6BD1 Diesel Engine Water Pump EX200-2 1-13610877-0 For ISUZU
  4. China 6BD1 Diesel Engine Water Pump EX200-2 1-13610877-0 For ISUZU
  5. China 6BD1 Diesel Engine Water Pump EX200-2 1-13610877-0 For ISUZU
  6. China 6BD1 Diesel Engine Water Pump EX200-2 1-13610877-0 For ISUZU
  7. China 6BD1 Diesel Engine Water Pump EX200-2 1-13610877-0 For ISUZU
  8. China 6BD1 Diesel Engine Water Pump EX200-2 1-13610877-0 For ISUZU
  9. China 6BD1 Diesel Engine Water Pump EX200-2 1-13610877-0 For ISUZU
  10. China 6BD1 Diesel Engine Water Pump EX200-2 1-13610877-0 For ISUZU

6BD1 Diesel Engine Water Pump EX200-2 1-13610877-0 For ISUZU

  1. MOQ: 1 set
  2. Price: Looking forward to your inquiry
  3. Get Latest Price
Payment Terms T/T, Western Union, MoneyGram,HSBC
Supply Ability 1000 Piece/Pieces per Month
Delivery Time 2-5 work days
Packaging Details Plastic bag , Box , Carton
After Warran Online support
OEM Service Available
Packing Plastic bag , Box , Carton
Application Construction / Industry / Agriculture / Genset / Marine / Handling
Engine Type: Diesel
introduce High precision steel pipe materials
advantage Improve surface roughness
Brand Name HDPARTS
Model Number 6BD1
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T, Western Union, MoneyGram,HSBC Supply Ability 1000 Piece/Pieces per Month
Delivery Time 2-5 work days Packaging Details Plastic bag , Box , Carton
After Warran Online support OEM Service Available
Packing Plastic bag , Box , Carton Application Construction / Industry / Agriculture / Genset / Marine / Handling
Engine Type: Diesel introduce High precision steel pipe materials
advantage Improve surface roughness Brand Name HDPARTS
Model Number 6BD1 Place of Origin China
High Light 6BD1 Diesel Engine Water PumpEngine Water Pump EX200-21-13610877-0 Engine Water Pump

6BD1 Diesel Engine Water Pump EX200-2 1-13610877-0 For ISUZU

Specification

Applicable models

6BD1

Type Cylinder liner
Original number EX200-2 1-13610877-0
Warranty 6 months
Engine Type  Diesel
Brand Name  HDPARTS
Condition  New
Size  OEM Size

 

 

Magnetic levitation submersible electric pump is a new generation of electric submersible pump, which realizes vertical shaft magnetic levitation (maintaining high efficiency under different working conditions), no wear, extended service time and maintenance cycle several times, saves frequent regular maintenance work, and can run continuously Tens of thousands of hours, saving maintenance and overhaul costs.

Submersible sewage pump
The magnetic levitation submersible pump has passed the inspection of the national laboratory and Shandong pump product quality inspection center. The test data proves that the conversion efficiency of the magnetic levitation submersible pump exceeds that of the traditional submersible pump. The use of users combined with the experimental data and the comparison in the field further proves that it is highly efficient, energy-saving, world-leading in conversion efficiency, world-leading in stand-alone head, high load, super large flow, Maintenance-free, long life and other features!
Using polymer composite materials
During the working process of the pump, the water flowing in the pump is affected by the friction with the flow channel and the surface of the pump impeller and the viscosity of the water body. The energy consumed by the pump is mainly used to resist the flow friction and eddy current resistance of the water surface. The energy (head loss) consumed by water in the flow process is used to overcome the internal friction and the friction between the water and the equipment interface. If the surface of the pump and impeller is smooth (this surface is called a hydraulically smooth surface), the surface resistance is small. The energy consumption is small. The polymer composite material is sprayed on the flow surface of the water pump and the impeller to form a hydraulically smooth surface. The surface finish of the ultra-smooth surface coating is 20 times that of polished stainless steel. This extremely smooth surface reduces The stratification of the fluid in the pump is achieved, thereby reducing the turbulent flow inside the pump, reducing the volume loss and hydraulic loss in the pump, and reducing power consumption.

 

Product Description
 

 
,
 

Company Information

 

Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.


At presentIt was the first one to enter the construction machinery parts market in 1995. It is located in the center of the world's largest industrial distribution center.​


is supported by scientific research and development strength, new business philosophy, mature marketing team, development and sales of high quality excavator parts.


covers a wide range, and its products are characterized by high strength, high toughness, high temperature resistance, no deformation, high wear resistance, etc.


Including Hydraulics parts, Final Drives parts, Undercarriage parts, General consumable parts, Engine spare parts, and stuff like that which are high-qualified products.


The product matching different kinds of excavator spare parts, which caters to the current market demand for high.

 

RODUCT CATEGORIES

1570502302971052897

 

 

 

Packaging & Shipping

 

Packaging material:Plastic, carton, wooden box

 

We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)

 

 

Forklift Engine Packaging & Shipping

FAQ

Q: What is your main products?
A:We mainly sell diesel engine parts, such as piston, piston ring, cylinder liner, crankshaft.

Q: Do you have any other products?
A:Yes, we have many other diesel engine spare parts.

Q: How to place orders?
A :The order is from your inqiuries.

  1. Confrim PI (the engine model, price, quantity, packing, delivery time, shipping way, time of payment).

  2. You make payment and send us receipt of payment.

  3. We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)

  4. We would deliver goods after we get balance from you. The order finish when you get goods and feel satisfied.

Q: What is the MOQ?
A:We provide sample and will arrange goods as your requirements.

Q: How to make payment?
A:After you confirm PI, you can pay thruogh Alibaba Trade Assurance,Wire transfer, Western union, Paypal, Cash. (The production order can be pay 30% deposit first, after we arranged well, then you pay the balance.)

Q: Could you give guarantee ?
A:Yes, one year warranty.

Q: What kind of packing you can provide?
A:We can provide packing as your requirements or neutral packing or our own trademark packing.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    1998

  • Total Annual:

    99999-1999999

  • Employee Number:

    80~120

  • Ecer Certification:

    Verified Supplier

Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ... Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ...

+ Read More

Get in touch with us

  • Reach Us
  • Guangzhou Star Mustang Construction Machinery Parts Co., Ltd
  • Shop 1215/1216/1217/1218/1219, No. 36 Zhuji Road, Zhuji International Machinery City, Zhuji Street, Tianhe District, Guangzhou City, Guangdong Province
  • https://www.parts-hd.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement