China factories

China factory - Tianjin Estel Electronic Science and Technology Co.,Ltd

Tianjin Estel Electronic Science and Technology Co.,Ltd

  • China,Shenzhen ,Guangdong
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China 35U Rack Outdoor Power Cabinet One Front Door With Air Conditioner / Fan
China 35U Rack Outdoor Power Cabinet One Front Door With Air Conditioner / Fan

  1. China 35U Rack Outdoor Power Cabinet One Front Door With Air Conditioner / Fan
  2. China 35U Rack Outdoor Power Cabinet One Front Door With Air Conditioner / Fan
  3. China 35U Rack Outdoor Power Cabinet One Front Door With Air Conditioner / Fan
  4. China 35U Rack Outdoor Power Cabinet One Front Door With Air Conditioner / Fan

35U Rack Outdoor Power Cabinet One Front Door With Air Conditioner / Fan

  1. MOQ: 1 set
  2. Price: Negotiation
  3. Get Latest Price
Payment Terms L/C, D/A, D/P, MoneyGram, T/T
Supply Ability 3,000 sets per month
Delivery Time 15-20 working days
Packaging Details Wooden case; carton onto pallet
Demension H1970mm×W680mm×D1290mm
Type Power distribution cabinet
Warranty 1 Year
Material Galvanized steel, single wall
Insulation material 20mm PEF
Equipment rack 19 inch Rack
Compartment 1
Door With one front door
LED 48VDC
IP level IP55
Cooling system Air conditioner
Usage Electric Industry
Brand Name Estel
Model Number ET231726812919035
Certification ISO9001, CE, 3C, FCC, TLC, IP55
Place of Origin Shenzhen, China (Mainland)

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, D/A, D/P, MoneyGram, T/T Supply Ability 3,000 sets per month
Delivery Time 15-20 working days Packaging Details Wooden case; carton onto pallet
Demension H1970mm×W680mm×D1290mm Type Power distribution cabinet
Warranty 1 Year Material Galvanized steel, single wall
Insulation material 20mm PEF Equipment rack 19 inch Rack
Compartment 1 Door With one front door
LED 48VDC IP level IP55
Cooling system Air conditioner Usage Electric Industry
Brand Name Estel Model Number ET231726812919035
Certification ISO9001, CE, 3C, FCC, TLC, IP55 Place of Origin Shenzhen, China (Mainland)
High Light Front Door Outdoor Power CabinetOutdoor Power Cabinet IP5535U Outdoor Battery Cabinet

35U Rack Power Distribution Outdoor Power Cabinet One Front Door With Air Conditioner And Fan

 

1. Outdoor Power Cabinet Specifications

 

  • Brief introduction

ET231726812919035 is an outdoor cabinet which can protect customer’s equipments from damage and extreme weather conditions.

The cabinet is an ideal solution for physical connections of outdoor telecommunication equipments. Both active telecom equipments and passive telecom equipments can be accommodated inside the cabinet.

  • Features

(1) The cabinet is dustproof, sunproof and rainproof, which is used in outdoor environment.

(2) The cabinet cooling use one air conditioners, which work in alternation to continuously keep thermostatic inside the cabinet.

(3) The layout of the cabinet is reasonable, which will facilitate cable access, fixing and grounding. At the bottom of the cabinet, there are entrance holes individually for power cable, signal cable and optical cable.

(4) All the cables, sealing and heat insulation used in the cabinet are made from flame retardant materials.

(5) The cabinet uses assembled structure, easy for installation.

(6) The cabinet includes 19” standard installation rack.

 

2. Technical Specs

  • Material: good quality galvanized steel

  • Surface treatment: degreasing, derusting, rustproof phosphating (or galvanizing), powder coated.

  • Cabinet load bearing: ≥600kg

  • Ingress protection: IP55

  • Flame retardance: comply with GB5169.7 test A

  • Insulation resistance: the insulation resistance between grounding devices and cabinet body parts is not lower than 2×104M/500V(DC).

  • Withstand voltage: the withstand voltage between grounding devices and cabinet body parts is not lower than 3000V(DC)/1min.

  • Mechanical strength: each surface can bear upright pressure >980N; after the door is

 

3. Technical Parameters

 

Configuration

Item

Technical Parameter

Cabinet

Model

ET231726812919035

Protection Level

IP65

External Dimension

H1970mm×W680mm×D1290mm

Internal Dimension

19 inch rail, 35U

Material

Galvanized steel, 1.2mm thickness, single wall.

Thickness of bearing parts: 2.0mm

Insulation

PEF

Coating

Polyester powder coating

Color

RAL7035

Lock

Anti-theft four-point locking system

Hinge

Inner hinge

Installation Options

Floor mounted, roof mounted ,wall mounted .

Cable Routing

Cable in and out from the bottom of cabinet

Maintenance

One front door and one rear door

Cooling

Air conditioner

2000W 48VDC

auxiliary fan

DC 48V ,

Adjustable temperature (with fan temperature control)

Power distribution unit

1. Ac switchboard with transient voltage suppressor diode (SPD 80KA)

Power grid and diesel generators (L1, L2, N, G)

120V Nema 5-15R 2-position socket

1, double circuit breaker 100A

2, single circuit breakers 64A

3, single circuit breakers 30A

2. Power distribution unit

Input voltage: AC 220V (L1, L2, N and G) 60Hz

Single phase (L1, L2, N and Earth)

3. Connect the generator

Input voltage: AC 220V (L1, L2, N and G) 60Hz

 

Others

Illumination

LED lamp: 220VAC 50Hz

Environment

Working Temperature

-40℃ ~+55℃ (+Solar Radiation)

Storage Temperature

-40℃~+70℃

Working Humidity

5%~95%(No condensation)

Working Altitude

0~4000 meters

 

 

4.Telecom cabinet installation typically involves the following steps:

 

  1. Site survey and preparation: Before installing the cabinet, the site needs to be surveyed to ensure it is suitable for the installation. This includes checking that the site is level, free from obstructions, and has adequate ventilation and power supply.
  2. Cabinet assembly: The cabinet is usually delivered in several pieces and needs to be assembled on site. This involves attaching the base, sides, and top panels, as well as installing any shelves, cable management systems, and other accessories.
  3. Cable routing: Once the cabinet is assembled, the next step is to route the cables that will connect the equipment inside the cabinet to the outside world. This may involve running cables through conduits, cable trays, or other cable management systems.
  4. Equipment installation: After the cables are routed, the equipment can be installed inside the cabinet. This may include servers, switches, routers, power supplies, and other hardware.
  5. Testing and commissioning: Once the equipment is installed, it needs to be tested and commissioned to ensure it is functioning correctly. This may involve running diagnostic tests, configuring network settings, and verifying connectivity.
  6. Documentation and handover: Finally, the installation needs to be documented, and the site handed over to the customer. This includes providing as-built documentation, test reports, and other relevant information.

 

5. Connection and Fastening

(1) Use anti-loose threaded connection as structure and bearer connection. Anchor bolt for fixing cabinet use hot dip galvanized bolts.

(2) Door hinges use inner hinge mode.

6. Appearance and Surface Treatment

Cabinet surface coating is outdoor special powder coating, with white gray color (PANTONE 428C). The coating complies with GB/T 3181-2008 requirement.

7. Quality Control Introduction

 

Quality control is an essential aspect of telecom cabinet manufacturing to ensure that the final product meets the required standards and specifications. The following are some common quality control measures that are typically taken during the production of telecom cabinets:
1.Raw material inspection: The quality control process begins with the inspection of raw materials used in the production of the cabinet. This includes inspecting the metal sheets, screws, hinges, and other components to ensure that they meet the required quality standards.
2.Production process inspection: During the production process, the cabinets are inspected at various stages to ensure that they meet the required specifications. This includes checking the dimensions, angles, and tolerances of the cabinet components.
3.Surface finish inspection: The surface finish of the cabinet is also inspected to ensure that it is free from any scratches, dents, or other defects that may affect the overall appearance and functionality of the product.
4.Functionality testing: Once the cabinet is fully assembled, it undergoes functional testing to ensure that it can perform its intended functions. This includes testing the cooling system, power supply, and other components to ensure that they are working correctly.
5.Packaging and shipment inspection: The final step in the quality control process involves inspecting the packaging of the cabinet to ensure that it is adequately protected during shipment. This includes checking for any damages or defects that may have occurred during the shipment process.

 

 

Our company resolutely implements the principle of quality first, we control and supervise the whole production process in strict accordance with the requirements of the ISO9001 system and the related implementation process. The quality department strictly controls all aspects like material inspection, production processes, product testing, shipment inspection and establishes traceable documents and product identification.

Our quality inspection team, is very familiar with the various standards, strict implementation of the standards required sampling and testing methods.

 

8. Cabinet pictures

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Distributor/Wholesaler,Exporter

  • Year Established:

    2002

  • Total Annual:

    15 Million-20 Million

  • Employee Number:

    101~200

  • Ecer Certification:

    Verified Supplier

Introduction    Tianjin Estel Electronic Science and Technology Co., Ltd (ESTEL(GUANGDONG)TECHNOLOGY CO., LTD), located in China, is a professional supplier of integrated outdoor telecom cabinet and temperature control solutions for outdoor telecom base station. As a science and tech... Introduction    Tianjin Estel Electronic Science and Technology Co., Ltd (ESTEL(GUANGDONG)TECHNOLOGY CO., LTD), located in China, is a professional supplier of integrated outdoor telecom cabinet and temperature control solutions for outdoor telecom base station. As a science and tech...

+ Read More

Get in touch with us

  • Reach Us
  • Tianjin Estel Electronic Science and Technology Co.,Ltd
  • 3A-8, SHUIWAN 1979 SQUARE (PHASE II), NO. III, TAIZI ROAD, SHUIWAN COMMUNITY, ZHAOSHANG STREET, NANSHAN DISTRICT, SHENZHEN
  • https://www.outdoortelecomcabinet.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement