Payment Terms | L/C, T/T, Western Union |
Supply Ability | 10000 square meter per month |
Delivery Time | 25-30 days |
Packaging Details | plywood case |
Name | Ophthalmology Operation Theatre |
Material | Metal, Steel, electrolytic plate with PVC treatment |
Color | Customized |
Style | Laminar flow operation room |
Screen | LCD or normal |
Brand Name | AMBER |
Model Number | AM-OTO01 |
Certification | CE |
Place of Origin | China |
View Detail Information
Explore similar products
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 10000 square meter per month |
Delivery Time | 25-30 days | Packaging Details | plywood case |
Name | Ophthalmology Operation Theatre | Material | Metal, Steel, electrolytic plate with PVC treatment |
Color | Customized | Style | Laminar flow operation room |
Screen | LCD or normal | Brand Name | AMBER |
Model Number | AM-OTO01 | Certification | CE |
Place of Origin | China | ||
High Light | Antibacterial Theater Room Hospital ,Theater Room Hospital Customized |
Cleanliness | Available from class 100 to class 10000 |
Design Scope (from structure, HVAC, electric to auto-control) | 1. Structure: Wall Panel, Ceiling filtering system, Windows, Doors, Various Fittings, Flooring |
2. HVAC: AHU, Ducting, Piping, Chiller, dehumidifier, etc. | |
3. Electric: Lighting, Switch, Cables, Wires, Power Distribution Cabinet, etc | |
4. Auto-control: PLC Controller, Sensors for Humidity and Temperature, Control Panel | |
5. Medical Gas System: Medical gas terminal, medical gas pipeline | |
Temperature | 21-27℃ (or as per required) |
Humidity | 30-60℃ (or as per required) |
Application | Operation Theatre, Medical Center, ICU, etc. |
| New Environmental Laminated board | Traditional Spraying board | |
Feature | 1. can't be scratched by cart or sharp items 2. dust-proof and Antibacterial3. quick assemble and can be move to different place to reassemble 4. easy to disassembly 5. easy to clean 6. no fingerprint | 1.easy to scratch 2.easy to discolor(yellowing after 1.5 years) 3.disposable 4. difficult to clean and maintain | |
Production time | 7 days | 10 days | |
Installation time | 3-5 days | 15-20 days | |
Work life | 10 years | 2 years | |
Others | we got patent in 2018 | normal material |
Company Details
Business Type:
Manufacturer,Seller
Year Established:
2008
Total Annual:
2000000-3000000
Employee Number:
30~50
Ecer Certification:
Verified Supplier
Dongguan Amber Purification Engineering Limited founded in 2008. As a leading company who provider of one-stop solutions for modular clean room. With over 16 years of experience in the clean room industry, we offer turnkey solutions for projects in diverse sectors such as hospital operating rooms, I... Dongguan Amber Purification Engineering Limited founded in 2008. As a leading company who provider of one-stop solutions for modular clean room. With over 16 years of experience in the clean room industry, we offer turnkey solutions for projects in diverse sectors such as hospital operating rooms, I...
Get in touch with us
Leave a Message, we will call you back quickly!