Payment Terms | L/C, T/T, Western Union |
Supply Ability | 100 Qty/per month |
Delivery Time | 7-30 work days |
Packaging Details | Loose package |
Manufacture | Yes |
Condition | New |
Thermal efficiency | 82%-84% |
Structure | Fire/Water Tube |
Application | Industries |
Pressure | Low pressure |
Quality Guarantee | 1 year,Lifetime maintain commitment |
Material | GB/T 3087-2008 |
Output | Steam |
Type | Vertical/Horizontal |
Brand Name | Yinyu |
Model Number | DZH/DZL |
Certification | ISO9001/BV |
Place of Origin | Henan China |
View Detail Information
Explore similar products
Automatic PLC Control Coal Fired Steam Boiler For Furniture Factories
Easy Operation Industrial Coal Boiler Low Working Pressure Install Quickly
Heavy Coal Fired Steam Boiler Vertical / Horizontal For Textile Industry
High Reliability Coal Burning Boiler , Automatic Steam Boiler For Milk Industry
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 100 Qty/per month |
Delivery Time | 7-30 work days | Packaging Details | Loose package |
Manufacture | Yes | Condition | New |
Thermal efficiency | 82%-84% | Structure | Fire/Water Tube |
Application | Industries | Pressure | Low pressure |
Quality Guarantee | 1 year,Lifetime maintain commitment | Material | GB/T 3087-2008 |
Output | Steam | Type | Vertical/Horizontal |
Brand Name | Yinyu | Model Number | DZH/DZL |
Certification | ISO9001/BV | Place of Origin | Henan China |
High Light | coal fired steam generator ,small coal fired boilers |
Biomass Fired Coal Fired Steam Boiler Low Pressure Boiler For Foam Board Processing
In the production enterprises, the use of steam is more extensive, such as insulation foam plate, the production of steam heating raw materialfoaming for production.
The commonly used foam foam forming has steambox foaming and foam molding machine foaming, however, either requires equipment to supply steam with a steam boiler. For the production of small, thin-walled and complex plastic parts, most of them are formed with steamer foam. The mold filled with hairable foam raw material is molded into the steamer and placed in the steambox, using the equipment matching steam generator to heat the person steam, the steam pressure and heating time depends on the size and thickness of the mold. The prefoam particles in the mold are heated softened and expanded to melt together, remove the mold from the steamer, and then get foam plastic parts after cooling.
Product parameters
DZH1-1.0SCI
NO; | Name | Unit | Number | Description |
1 | Rated output | t/h | 1 | |
2 | Rated working power | Mpa | 1.0 | |
3 | Rated steam pressure | ℃ | 184 | |
4 | Heating area | ㎡ | 39.4 | |
5 | Grate area | ㎡ | 1.9 | |
6 | Design fuels | / | Biomass,coal,rice husk... | |
7 | Bulk size | mm | 3900×1840×3120 |
DZH2-1.25SCI
NO; | Name | Unit | Number | Description |
1 | Rated output | t/h | 2 | |
2 | Rated working power | Mpa | 1.25 | |
3 | Rated steam pressure | ℃ | 194 | |
4 | Heating area | ㎡ | 73.6 | |
5 | Grate area | ㎡ | 3.74 | |
6 | Design fuels | / | Biomass,coal,rice husk... | |
7 | Bulk size | mm | 4500×2240×3320 |
DZL4-1.25SCI
NO; | Name | Unit | Number | Description |
1 | Rated output | t/h | 4 | |
2 | Rated working power | Mpa | 1.25 | |
3 | Rated steam pressure | ℃ | 194 | |
4 | Heating efficiency | % | 80 | |
5 | Grate area | ㎡ | 5.18 | |
6 | Design fuels | / | Biomass,coal,rice husk... | |
7 | Fume temperature | ℃ | 169 | |
8 | Bulk size | mm | 6470×2820×3668 |
DZL6-1.25SCI
NO; | Name | Unit | Number | Description |
1 | Rated output | t/h | 6 | |
2 | Rated working power | Mpa | 1.25 | |
3 | Rated steam pressure | ℃ | 194 | |
4 | Heating efficiency | % | 80 | |
5 | Grate area | ㎡ | 7.55 | |
6 | Design fuels | / | Biomass,coal,rice husk... | |
7 | Fume temperature | ℃ | 166.3 | |
8 | Bulk size | mm | 8244×2951×3550 |
Pre-sale service:
We help customer choose the best boiler model according to
different requirements of various industry. Before delivery we
will provide foundation drawing, layout drawing, boiler room
layout, etc.
In-sale service:
We keep 24 hours online and keep close contacts during the
production process to ensure on time delivery with perfect
finished product.
After-sale service:
1.provide full range of original spare parts.
2.Engineers abroad installation and commissioning service is
available.
3.Our engineers will held a training for boiler workers to
ensure the safe operation.
4.Free maintenance and repair for one year and lifelong
service.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2002
Total Annual:
2000000-10000000
Employee Number:
80~120
Ecer Certification:
Active Member
Taikang Yinyu Boiler Manufacturing Co. , Ltd. is the national fixed-point B-class boiler pressure vessel manufacturers, the company's main products are: vertical / horizontal coal, gas, diesel fired steam (hot water) boiler, electric steam boiler (hot water) boiler, 153 kinds of specificati... Taikang Yinyu Boiler Manufacturing Co. , Ltd. is the national fixed-point B-class boiler pressure vessel manufacturers, the company's main products are: vertical / horizontal coal, gas, diesel fired steam (hot water) boiler, electric steam boiler (hot water) boiler, 153 kinds of specificati...
Get in touch with us
Leave a Message, we will call you back quickly!