Payment Terms | L/C, T/T, Western Union |
Supply Ability | 100 Qty/per month |
Delivery Time | 10-30 work days |
Packaging Details | Loose packge |
Material | GB/T 3087-2008 |
Dimension | Depends on capacity |
Weight | Depends on capacity |
Manufacture | Yes |
Thermal efficiency | 82%-85% |
Type | Nature circulation |
Structure | Fire tube |
Style | Vertical/Horizontal |
Output | Hot water |
Warranty | 1 year,Lifetime maintain commitment |
Brand Name | Yinyu |
Model Number | CDZH/CDHL |
Certification | ISO/BV |
Place of Origin | Henan China |
View Detail Information
Explore similar products
Wildly Used Coal Fired Hot Water Furnace High Efficiency Horizontal Style
Automatic Control Coal Fired Hot Water Boiler 1t Capacity / Per Hour
High Thermal Hot Water Boiler System , Industrial Coal Boiler Large Output
Automatic Loading Coal Fired Hot Water Boiler 4t Capacity / Per Hour
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 100 Qty/per month |
Delivery Time | 10-30 work days | Packaging Details | Loose packge |
Material | GB/T 3087-2008 | Dimension | Depends on capacity |
Weight | Depends on capacity | Manufacture | Yes |
Thermal efficiency | 82%-85% | Type | Nature circulation |
Structure | Fire tube | Style | Vertical/Horizontal |
Output | Hot water | Warranty | 1 year,Lifetime maintain commitment |
Brand Name | Yinyu | Model Number | CDZH/CDHL |
Certification | ISO/BV | Place of Origin | Henan China |
High Light | coal fired hot water furnace ,commercial hot water boiler |
Hot Water Output High Efficiency Coal Fired Hot Water Boiler For Swimming Pool
CDZL/CDZH horizontal chain hot water boiler for the double pot vertical A-type arrangement assembly pipe forced circulation, boiler in the factory assembled into the upper heated surface body and the lower combustion equipment two major components factory to the site, the two pieces and supplemented heated surface together. By the boiler body front water-cooled wall, the lower heated surface and the front of the upper pot to form the combustion chamber, in its back end between the upper and lower pot tube arrangement of dense convective tube beam to form two return convective heat surface, the boiler tail separately set cast iron coal-saving, and equipped with two inspection holes, easy to check maintenance and tail blow ash.
The furnace row adopts a new large block does not leak coal furnace sheet (the original furnace row is a sheet furnace row), the operation is light and reliable. This type of furnace chip makes the boiler operation reliability greatly improved, basically realized that the heat ingress furnace heat furnace piece is not pulled, not easy to damage, the boiler operation leakage coal than the sheet furnace sheet less, can save coal 1-2%, and the ventilation conditions are good, has a certain self-clearing capacity. The combustion equipment (furnace row) adopts the ventilation structure of the ballast compartment such as the air pipe on both sides, the sectional air supply and other technologies, so that the excess air coefficient of the furnace is not higher than 1.5. Intensify combustion, increase furnace temperature, reduce the carbon content of the slag, so that the carbon content of the slag is 12%.
Part of product parameters
CDZH0.7-95/70SCI
NO; | Name | Unit | Number | Description |
1 | Rated efficiency | MW | 0.7 | |
2 | Grate area | ㎡ | 1.85 | |
3 | Rated outlet/inlet water temperature | ℃ | 95/70 | |
4 | Heating efficiency | % | 81 | |
6 | Design fuels | / | Biomass,coal,rice husk... | |
10 | Bulk size | mm | 3900×1840×3120 |
CDZH1.4-95/70SCI
NO; | Name | Unit | Number | Description |
1 | Rated efficiency | MW | 1.4 | |
2 | Grate area | ㎡ | 2.8 | |
3 | Rated outlet/inlet water temperature | ℃ | 95/70 | |
4 | Heating efficiency | % | 81 | |
6 | Design fuels | / | Biomass,coal,rice husk... | |
10 | Bulk size | mm | 4500×2240×3320 |
CDZL0.7-95/70SCI
NO; | Name | Unit | Number | Description |
1 | Rated efficiency | MW | 0.7 | |
2 | Grate area | ㎡ | 1.85 | |
3 | Rated outlet/inlet water temperature | ℃ | 95/70 | |
4 | Heating efficiency | % | 81 | |
6 | Design fuels | / | Biomass,coal,rice husk... | |
10 | Bulk size | mm | 3900×1840×3120 |
CDZL1.4-95/70SCI
NO; | Name | Unit | Number | Description |
1 | Rated efficiency | MW | 1.4 | |
2 | Grate area | ㎡ | 2.8 | |
3 | Rated outlet/inlet water temperature | ℃ | 95/70 | |
4 | Heating efficiency | % | 81 | |
6 | Design fuels | / | Biomass,coal,rice husk... | |
10 | Bulk size | mm | 4500×2240×3320 |
Our services
Pre-sale service:
We help customer choose the best boiler model according to
different requirements of various industry. Before delivery we
will provide foundation drawing, layout drawing, boiler room
layout, etc.
In-sale service:
We keep 24 hours online and keep close contacts during the
production process to ensure on time delivery with perfect
finished product.
After-sale service:
1. provide full range of original spare parts.
2. Engineers abroad installation and commissioning service is
available.
3. Our engineers will held a training for boiler workers to
ensure the safe operation.
4. Free maintenance and repair for one year and lifelong
service.
Boiler application areas
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2002
Total Annual:
2000000-10000000
Employee Number:
80~120
Ecer Certification:
Active Member
Taikang Yinyu Boiler Manufacturing Co. , Ltd. is the national fixed-point B-class boiler pressure vessel manufacturers, the company's main products are: vertical / horizontal coal, gas, diesel fired steam (hot water) boiler, electric steam boiler (hot water) boiler, 153 kinds of specificati... Taikang Yinyu Boiler Manufacturing Co. , Ltd. is the national fixed-point B-class boiler pressure vessel manufacturers, the company's main products are: vertical / horizontal coal, gas, diesel fired steam (hot water) boiler, electric steam boiler (hot water) boiler, 153 kinds of specificati...
Get in touch with us
Leave a Message, we will call you back quickly!