Payment Terms | L/C, T/T, Western Union |
Supply Ability | 100 Qty/per month |
Delivery Time | 10-30 work days |
Packaging Details | Loose package |
Material | GB/T 3087-2008 |
Dimension | Depends on capacity |
Weight | Depends on capacity |
Manufacture | Yes |
Thermal efficiency | 92%-95% |
Type | Nature circulation |
Structure | Fire tube |
Style | Vertical/Horizontal |
Output | Hot water |
Warranty | 1 year,Lifetime maintain commitment |
Brand Name | Yinyu |
Model Number | CWNS |
Certification | ISO/BV |
Place of Origin | Henan China |
View Detail Information
Explore similar products
WNS Thermal 95% Gas Fired Hot Water Furnace Vertical
Horizontal 70 Degrees Natural Gas Hot Water Boiler 18M3/H
DN100 0.5t Gas Fired Hot Water Furnace Nature Circulation
Safe Operation Commercial Hot Water Boiler Energy Conversation Large Output
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 100 Qty/per month |
Delivery Time | 10-30 work days | Packaging Details | Loose package |
Material | GB/T 3087-2008 | Dimension | Depends on capacity |
Weight | Depends on capacity | Manufacture | Yes |
Thermal efficiency | 92%-95% | Type | Nature circulation |
Structure | Fire tube | Style | Vertical/Horizontal |
Output | Hot water | Warranty | 1 year,Lifetime maintain commitment |
Brand Name | Yinyu | Model Number | CWNS |
Certification | ISO/BV | Place of Origin | Henan China |
High Light | gas boiler hot water heater ,gas fired water boiler |
Oil Fired Gas Fired Hot Water Boiler Supply Hot Water For Heating
The basic working principle of gas hot water boiler is cold water into the water heater, flowing through the water gas linkage valve body in the flow of water under the action of a certain pressure difference, promote the water-gas linkage valve, and at the same time push the DC power supply micro-switch to turn on the power supply and start the pulse igniter, at the same time open the gas transmission electromagnetic valve, through the pulse igniter continue to automatically re-ignition, until the ignition successfully into the normal working state, this process is maintained for about 5 to 10 seconds, When commercial gas hot water boiler in the work process or ignition process water shortage or water pressure shortage, lack of electricity, gas shortage, hot water temperature is too high, accidental blow out of the fire and other fault phenomenon, pulse igniter will be detected by the signal feedback of the induction needle, automatically cut off the power supply, gas transmission electromagnetic valve in the case of the original normal closure valve state, that is to say, at this time has cut off the gas access, shut down commercial commercial hot water boiler safety protection.
Part of product paremeters
CWNS0.7-95/70
NO; | Name | Unit | Number | Description |
1 | Rated efficiency | MW | 0.7 | |
2 | Water volume | M³ | 1.4 | |
3 | Rated outlet/inlet water temperature | ℃ | 95/70 | |
4 | Heating efficiency | % | 99 | |
5 | Output/inlet diameter | mm | DN100 | |
6 | Design fuels | / | Oil/Gas | |
7 | Blow down valve diameter | mm | DN100 | |
8 | Heating area(room) | ㎡ | 6000 | |
9 | Hot water output | M³/h | 18 | |
10 | Bulk size | mm | 2400×1200×1800 |
CWNS1.4-95/70
NO; | Name | Unit | Number | Description |
1 | Rated efficiency | MW | 1.4 | |
2 | Water volume | M³ | 3.75 | |
3 | Rated outlet/inlet water temperature | ℃ | 95/70 | |
4 | Heating efficiency | % | 99 | |
5 | Output/inlet diameter | mm | DN125 | |
6 | Design fuels | / | Oil/Gas | |
7 | Blow down valve diameter | mm | DN125 | |
8 | Heating area(room) | ㎡ | 12500 | |
9 | Hot water output | M³/h | 36 | |
10 | Bulk size | mm | 2800×1700×2300 |
Pre-sale service:
We help customer choose the best boiler model according to
different requirements of various industry. Before delivery we
will provide foundation drawing, layout drawing, boiler room
layout, etc.
In-sale service:
We keep 24 hours online and keep close contacts during the
production process to ensure on time delivery with perfect
finished product.
After-sale service:
1. provide full range of original spare parts.
2. Engineers abroad installation and commissioning service is
available.
3. Our engineers will held a training for boiler workers to
ensure the safe operation.
4. Free maintenance and repair for one year and lifelong
service.
Boiler application areas
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2002
Total Annual:
2000000-10000000
Employee Number:
80~120
Ecer Certification:
Active Member
Taikang Yinyu Boiler Manufacturing Co. , Ltd. is the national fixed-point B-class boiler pressure vessel manufacturers, the company's main products are: vertical / horizontal coal, gas, diesel fired steam (hot water) boiler, electric steam boiler (hot water) boiler, 153 kinds of specificati... Taikang Yinyu Boiler Manufacturing Co. , Ltd. is the national fixed-point B-class boiler pressure vessel manufacturers, the company's main products are: vertical / horizontal coal, gas, diesel fired steam (hot water) boiler, electric steam boiler (hot water) boiler, 153 kinds of specificati...
Get in touch with us
Leave a Message, we will call you back quickly!