Payment Terms | L/C, T/T, Western Union |
Supply Ability | 100 Qty/ per month |
Delivery Time | 7-30 work days |
Packaging Details | Loose package |
Material | GB/T 3087-2008 |
Dimension | Depends on capacity |
Weight | Depends on capacity |
Manufacture | Yes |
Thermal efficiency | 96%-98% |
Type | Nature circulation |
Structure | Electric heating |
Style | Vertical/Horizontal |
Output | steam |
Warranty | 1 year,Lifetime maintain commitment |
Brand Name | Yinyu |
Model Number | WDR |
Certification | ISO/BV |
Place of Origin | Henan China |
View Detail Information
Explore similar products
Stable Work Electric Heating Steam Boiler Environment Protection Easy Operation
Electric Industrial Steam Boiler Quiet Running Heat Efficient Explosion Proof
Automatic Industrial Electric Steam Generator , Electric Fired Boiler 1t
High Efficiency Electric Heating Steam Boiler 2t Simple Operation Large Output
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 100 Qty/ per month |
Delivery Time | 7-30 work days | Packaging Details | Loose package |
Material | GB/T 3087-2008 | Dimension | Depends on capacity |
Weight | Depends on capacity | Manufacture | Yes |
Thermal efficiency | 96%-98% | Type | Nature circulation |
Structure | Electric heating | Style | Vertical/Horizontal |
Output | steam | Warranty | 1 year,Lifetime maintain commitment |
Brand Name | Yinyu | Model Number | WDR |
Certification | ISO/BV | Place of Origin | Henan China |
High Light | electric fired boiler ,electric steam boiler |
No Pollution High Efficiency Fully Automatic Electric Heating Steam Boiler
Steam boiler steam with water, is a serious impact on the
later use, may also cause some damage to the product, in
order to avoid this problem, we must find out the response
measures in a timely manner. The problem of steam belt
water may suddenly appear during the operation of the
boiler, which not only greatly reduces the efficiency of the
boiler, but also has a certain impact on the safety of the
staff. Therefore, as soon as signs of steam strip water appear,
it must be treated immediately.
1, the relevant standards have been clearly defined, saturated
steam boiler steam humidity is not greater than 3% is
qualified. If there is a more serious steam belt water, it must
be inspected or treated from all aspects, otherwise it will
directly affect its normal use; At the same time must ensure
that the boiler at the normal water level, high water level will
reduce the space of steam, and then the appearance of
steam belt water, at the same time it is necessary to check
whether the installation of the inner part of the boiler is in
line with the drawing requirements, in particular, the water-
cooled wall guide pipe and the box inserted into the cylinder
of the seal and the drum welding requirements full welding,
sealbetween should also be welded tightly, otherwise the
soda mixture without the underwater plate will directly short
into the steam pipe, causing serious steam.
2, steam boiler between the underwater plate should be
sealed, to prevent short circuit of the soda mixture; When the
boiler is in operation, the continuous sewage valve should be
opened, so that the amount of sewage in the boiler
evaporation of about 5%, in order to reduce the expansion of
pot water and prevent the formation of foam.
3, the boiler internal pipe installation should be down, if
there is no problem above, can be welded under the outlet
pipe uniform plate a 400 x 400 x 4 steel plate, which can
reduce the steam with water. When the boiler gas volume is
serious, should be the air package design is too small, can be
appropriately reduced the level of liquid, to increase the
space of steam, reduce the amount of water with the dresser.
4, in accordance with the above-mentioned way to carry out
detailed inspection and improvement of the boiler, I believe
that it will have a greatly reduced chance of water problems,
so that the steam humidity generated by the steam boiler can
also be controlled within the permitted range, to ensure that
the equipment can meet the user's use requirements, of
course, it can also extend the use of the period.
In dealing with the problem of steam boiler steam with water,
we must first carefully check the inside of the equipment, see
if there is any fault problem, timely solution, in order to avoid
the next re-emergence, must do a good job of post-
maintenance work, this is very important, no product
equipment can be used in the absence of maintenance for a
long time, of course, maintenance methods must be correct
and in line with the actual use of the boiler, maintenance
interval is fixed, Frequent maintenance of them can only have
bad consequences.
Parameters
WDR1-0.7
NO; | Name | Unit | Number | Description |
1 | Rated output | t/h | 1 | |
2 | Rated working power | Mpa | 0.7 | |
3 | Rated steam pressure | ℃ | 170 | |
4 | Heating efficiency | % | 99 | |
5 | Output diameter | mm | DN50 | |
6 | Design fuels | / | Electric | |
7 | Safety valve diameter | mm | DN40 | |
8 | Bulk size | mm | 3420×1760×1930 |
WDR2-0.7
NO; | Name | Unit | Number | Description |
1 | Rated output | t/h | 2 | |
2 | Rated working power | Mpa | 0.7 | |
3 | Rated steam pressure | ℃ | 170 | |
4 | Heating efficiency | % | 99 | |
5 | Output diameter | mm | DN80 | |
6 | Design fuels | / | Electric | |
7 | Safety valve diameter | mm | DN50 | |
8 | Bulk size | mm | 3700×1900×2100 |
Pre-sale service:
We help customer choose the best boiler model according to
different requirements of various industry. Before delivery we
will provide foundation drawing, layout drawing, boiler room
layout, etc.
In-sale service:
We keep 24 hours online and keep close contacts during the
production process to ensure on time delivery with perfect
finished product.
After-sale service:
1.provide full range of original spare parts.
2.Engineers abroad installation and commissioning service is
available.
3.Our engineers will held a training for boiler workers to
ensure the safe operation.
4.Free maintenance and repair for one year and lifelong
service.
Boiler application areas
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2002
Total Annual:
2000000-10000000
Employee Number:
80~120
Ecer Certification:
Active Member
Taikang Yinyu Boiler Manufacturing Co. , Ltd. is the national fixed-point B-class boiler pressure vessel manufacturers, the company's main products are: vertical / horizontal coal, gas, diesel fired steam (hot water) boiler, electric steam boiler (hot water) boiler, 153 kinds of specificati... Taikang Yinyu Boiler Manufacturing Co. , Ltd. is the national fixed-point B-class boiler pressure vessel manufacturers, the company's main products are: vertical / horizontal coal, gas, diesel fired steam (hot water) boiler, electric steam boiler (hot water) boiler, 153 kinds of specificati...
Get in touch with us
Leave a Message, we will call you back quickly!