Payment Terms | T/T |
Supply Ability | 50 Sets Mould Per Month |
Delivery Time | 30-50 working days after the 3D approved |
Packaging Details | Wooden Case With Steel Frame |
Mold type | 2/3 plate-mold |
Mold material | 718/P20/738/NAK80/S136, NAK80, S136, 718H |
Mold base material | DME, LKM & HASCO & DME, S50C LKM, HASCO, LKM Mould Base |
Cavity number | Single/multi Cavity |
Mold life | 300,000/500,000/1,000,000 shots |
Package | Standard exported Wooden box packed, Fumigation process(upon required) |
Mold Building Lead Time | T1, 4-5 weeks after Mold 3D approved |
Software | UG, PROE, CAD, CAD/ProE/UG/SOLIDWORKS |
Brand Name | KYE |
Model Number | OEM |
Certification | ISO9001:ISO14001 |
Place of Origin | China |
View Detail Information
Explore similar products
OEM Design 2 Plate S50C P20 DME Standard Plastic Injection Mold
LKM H13 HRC 48-52 Core OEM Design With Hot Runner System Full Harden Mold
A2 Polishing Cold Runner S136 718H White ABS Plastic Injection Mold
Multi Cavity AB Plate 1.2343 OEM Mold Design Service
Product Specification
Payment Terms | T/T | Supply Ability | 50 Sets Mould Per Month |
Delivery Time | 30-50 working days after the 3D approved | Packaging Details | Wooden Case With Steel Frame |
Mold type | 2/3 plate-mold | Mold material | 718/P20/738/NAK80/S136, NAK80, S136, 718H |
Mold base material | DME, LKM & HASCO & DME, S50C LKM, HASCO, LKM Mould Base | Cavity number | Single/multi Cavity |
Mold life | 300,000/500,000/1,000,000 shots | Package | Standard exported Wooden box packed, Fumigation process(upon required) |
Mold Building Lead Time | T1, 4-5 weeks after Mold 3D approved | Software | UG, PROE, CAD, CAD/ProE/UG/SOLIDWORKS |
Brand Name | KYE | Model Number | OEM |
Certification | ISO9001:ISO14001 | Place of Origin | China |
High Light | S136 Two Plate Mould ,S136 Plastic Hook Mould ,S50C Household Two Plate Mould |
Household ABS Plastic Hook S50C S136 Two Plate Mould
Product Details Description
Runner type | Cold runner |
Mould type | 2 plate-mould |
Mould base steel | S50C |
A/B plate steel | P20 |
Design software | CAD, UG, Proe |
Mould standard | DME |
Gate type | sub-gate |
Mould number | According to customer requirement |
Core/Caviry steel | P20/718/738/NAK80/S136, NAK80, S136, 718H |
MOQ | 1 set |
Payment term | T/T |
Deliverly date | 4-5 Weeks |
Package | Artificial wooden box |
Cycle time | 30s |
Mould life | 500,000 shots |
What KYE can offer?
1. Plastic injection mold maker, silicone mold maker.
2. High quality steel and long mold life.
3. Full set machines for mold making and products injection.
4 Professional design team with best service.
5. Various materials and short lead-time.
6. Manufactory of plastic injection mold and plastic injection products.
Brief introduction of service cooperation process
1. Customized Making
Per your drawings or samples, we can customize your mold.
Per your requirement, we can modify and design your parts structure to establish the overall 3D effect drawing. And per above 3D drawing, we can provide mold making quotation and product molding quotation to you to help you to do the entire costing analysis.
2. Prototype Making
in initial stage, after confirming the product design, size, material, and price…etc, if you need, before starting to make the real mold, we can make the prototype for you to help you understanding the product detail and its outlooking (Ps. we will estimate the prototype cost report to you from 3D printing or from NC milling way).
3. Purchase Contract Making
If both of us agree to sign the contract, we will mention the working detail, lead time, inspection standard, payment term information…etc on the contract.
4. During the mold manufacturing period
We will send the update working progress report in every 1-2 week with photos.
Before commencing making the mold and the machining process, if customer needs to adjust the product’s shape slightly, we will not charge the extra cost.
If the machining process is on-going, and customer needs to adjust the product design, we will study and give our report to see whether we should charge extra cost or not.
We will send T1, T2 or T3 samples till meeting customer’s satisfaction.
5. If customer places the product production orders to us
After the final trial samples is approval by customer, if customer places the product production to us, we will be responsible for the mold maintenance and performance for all.
6. Packing information
For mold, we pack with standard exported wooden box with fumigation process.
For product, if there is no specific packing requirement, we will use regular carton box and bag (free of charge). If customer requires specific packing way,
We can help customer to do the assembly, packing and the printing from case to case.
7. Transportation
Customers can use their own forwarder or we can help customer to arrange any sea or air transportation forwarder to deliver the goods to customer’s address.
FAQ
Q1: Can I test my idea/component before committing to mould tool manufacture?
A: Yes, we can use CAD drawings to make models for design and functional evaluations.
Q2: What type of plastic is best for my design/component?
A: Materials selection depends on the application of your design and the environment in which it will function. We will be happy to discuss the alternatives and suggest the best material.
Q3: What type of mould tool do I need?
A: Mould tools can be either single cavity (one part at a time) or multi-cavity (2, 4, 8 or 16 parts at a time). Single cavity tools are generally used for small quantities, up to 10, 000 parts per year whereas multi-cavity tools are for larger quantities. We can look at your projected annual requirements and recommend which would be best for you.
Q4: Ok, I've decided to go ahead with my project. How long will it take to get my parts?
A: It can take 3-6 weeks to have the mould tool manufactured depending on the part's complexity and the number of impressions (single or multi). After we have received final approval by you of the new tool, you can expect delivery of parts within 3-5 days.
If you want to have your product to reverse manufacture,we can help you with our rich manufacturing experience.
If your current supplier is becoming cost prohibitive,we can help you to find a cost effective solution.
You can send samples, and we can design, manufacturer and ship a finished product to USA or wherever the place you want us to export.
Thanks for the visit and looking for the inquiry from you!
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter
Year Established:
2008
Total Annual:
2 Million-3 Million
Employee Number:
50~80
Ecer Certification:
Site Member
KYE Mould Technology Limited is set up at 2009, located in the well-known industrial town Chang`An,Dongguan city of China with convenient transportation and booming economy. We provide customer with one–stop service including product design,mold fabrication and second-processing(spray painting... KYE Mould Technology Limited is set up at 2009, located in the well-known industrial town Chang`An,Dongguan city of China with convenient transportation and booming economy. We provide customer with one–stop service including product design,mold fabrication and second-processing(spray painting...
Get in touch with us
Leave a Message, we will call you back quickly!